Award Notice SDVOSBC 3 notices 1 document

Z1DA--402-24-007 B200E Lobby Flooring 36C24125R0098

Solicitation 36C24125R0098 Copied Notice ID 3f74e4dca9d64d17bdea185e8c29a0bc Copied VETERANS AFFAIRS, DEPARTMENT OF — 241-NETWORK CONTRACT OFFICE 01 (36C241)
SAM.gov
Posted
Nov 05, 2025
Deadline
No deadline
Set-aside
SDVOSBC
NAICS
238330
PSC
Z1DA

Summary

AI-generated · Aug 23, 2025

Contractor shall provide Construction Management services to remove the existing lobby flooring on the ground floor of building 200E and install new flooring at the VA Maine Health Care System (Togus) per the scope of work. The project entails coordinating removal and replacement activities within the lobby, including sequencing and site logistics, with the surrounding rooms occupied during work, requiring phased execution and allowance for off-hours demolition in accordance with the specifications.

RFI responses clarify key requirements: no asbestos abatement is anticipated for this project (a 4,650 SF area is involved); a qualified Project Superintendent may perform SSHO duties or QA/QC duties, but not both SSHO and QA/QC; surrounding areas will remain occupied and phasing is required; off-hours work is allowed; past performance can use a provided template or other recent, relevant evidence (within 5 years) and completed task orders are acceptable; STARC panels are acceptable as part of ICRA barriers, but hard barriers must be used; asbestos testing was performed in April 2024 with no asbestos anticipated; the SOW attached is the most recent, and 52.211-18 variation of quantity does not apply to this IDIQ solicitation.

The contractor shall provide Construction Management services to remove existing lobby flooring on the ground floor of building 200E and install new flooring at the VA Maine Health Care System (Togus) in accordance with this scope of work.

From Solicitation posted on Jun 27, 2025

RFI Questions and Answers Lobby Floors Q1. The Specification 02 82 13.19 Asbestos Floor Tile and Mastic Abatement, page 02 82 11 1, B. Extent of Work: 2., states there is 4650sf of ACM flooring & mastic to be abated, the Statement of Work does not mention any ACBM abatement. Please clarify if there are any hazardous materials present which will require abatement. A1. The VA expects no asbestos abatement as part of this project. Q2. Will this project require a separate Project Superintendent and SSHO, or will a competent Project Superintendent be allowed to assume the duties of both positions? A2. Project Superintendent, if qualified, may hold both duties. Superintendent may not hold both SSHO and QA/QC duties. Q3. Will the rooms surrounding the proposed work areas be occupied during removal and replacement of the floors? A3. Rooms surrounding the proposed work areas will be occupied during removal and replacement of floors. Phasing will be required. Q4. Should the contractor factor in off hours work for the demolition phases of the contract? A4. Yes. See noise and vibration language within specifications. Q5. On page 8 of the solicitation, under Past Performance, it reads: 1. Offeror shall use the attached form titled Past Performance Questionnaire (see RFP Attachment 9) to obtain past performance information from at least two prior contracts However, Attachment 9 is missing from the original bid documents. We understand from previous solicitations that this is just a template, but we d like to confirm if there s a specific form the Government would like us to use. A5. There is no specific form, the attachment is just a template to use if you need to. Q6. Is it acceptable to submit previously completed PPQs from past projects, or do new PPQs need to be submitted? A6. Past performance should relevant and recent. Per the solicitation completed within 5 years and similar in scope and magnitude. Q7. Do projects presented for Past Performance and/or Experience need to be complete, or can they be ongoing and substantially complete (at least 50%)? A7. See above A6. Q8. If projects need to be complete, would an active multi-year contract such as a regional preventative maintenance and service contract or BPA with discrete, completed task orders be considered compliant and relevant, provided it includes scopes of work that are directly applicable to the solicitation? A8. Completed task orders are acceptable. Q9. Please clarify if a superintendent can be a dual hat to cover the requirements of SSHO? If no to the question, will the SSHO need to be full-time for this project? A9. Project Superintendent, if qualified, may hold both duties. Superintendent may not hold both SSHO and QA/QC duties. Q10. Please clarify if a superintendent can be a dual hat to cover the requirements of QA/QC? If no to the question, will the QA/QC need to be full time for this project? A10. Project Superintendent, if qualified, may hold both duties. Superintendent may not hold both SSHO and QA/QC duties. Q11. Can a superintendent be a triple hat to cover the requirements of SSHO and QA/QC? A11. No. Q12. The header dates of this SOW are dated 11/18/2022. Please confirm this is a 2025 SOW requirement. A12. The SOW attached to the RFP is the most recent. Q13. Please verify the GOV anticipates asbestos in this project, the SOW does not speak to asbestos however the specs do at Section 02 82 11. A13. The VA expects no asbestos abatement as part of this project. Q14. In the SOW page 1 of Section 6 2.1 indicates approximately 4,650 sqft of space, would you consider adding 52.211-18 Variation of quantity to this solicitation? A14. 52.211-18 only applies to IDIQ contracts. Q15. Page 6 of 6 #18 Attachments: Attachment #1 SOW Seasonal influenza with vaccines : VHA Directive 1192.01 speaks to Health Care Personnel, Page 8(p) VA Contracting Officers: This section implies, VA contracting officers responsible for on-site HCP contract will inform the contractors about this directive and its requirements. However, this project is not an on-site contract for HCP. Section C page 3, indicated that flu season is between Dec 1 through March 31, please validate that is not a mandatory requirement. A15. VA confirms this is not an on-site HCP contract. Q16. Is the use of temporary plastic wall panels (such as STARC panels) acceptable to meet ICRA requirements? A16. Construction barriers shall be hard barriers and must be completed in a manner that prevents dust release. Barriers must be effectively affixed to floor and ceiling (or floor/roof deck above) and secure from movement or damage. The VA accepts STARC panels. Q17. Was an asbestos test done of the floor? Do you know when the flooring was installed? A17. The VA does not anticipate any asbestos containing materials, testing was conducted in April 2024. We do not know when the flooring was installed.

From Solicitation posted on Jul 07, 2025

Notice history

3
  1. Solicitation Posted Jun 27, 2025 View
  2. Solicitation Posted Jul 07, 2025
    • Description: Description was updated
  3. Award Notice LATEST Posted Nov 05, 2025

Details

Solicitation number 36C24125R0098
Notice ID 3f74e4dca9d64d17bdea185e8c29a0bc
Award number 36C24126C0002
Notice type Award Notice
Product / Service (PSC) Z1DA
NAICS 238330
Archive date Feb 12, 2026

Award Information

Awardee
1
Total Awarded
$1,781,229.00
Award Date
Nov 05, 2025

Awardees

Company Name UEI CAGE Code Location
KEE SOLUTIONS LLC C7QRJTNKJM69 7UFX2 BOURNE

Documents

1
View on SAM.gov

Contacts

primary
Diane C. Davis

Contract Specialist

Email

Phone

Agency

VETERANS AFFAIRS, DEPARTMENT OF
VETERANS AFFAIRS, DEPARTMENT OF
241-NETWORK CONTRACT OFFICE 01 (36C241)

Place of Performance

Dates

Posted Nov 05, 2025 9 months ago
Last Updated Aug 06, 2026 1 day ago
Awarded Nov 05, 2025 9 months ago