Y1DA--656-20-130, Repair Building 50 Basement Kitchen 36C26326C0022 PO; 656C0058 36C26326B0009
Summary
AI-generated · Nov 27, 2025Remodel the Building 50 basement kitchen and dish room at the Saint Cloud VA Health Care System, focusing on replacing aging architectural, mechanical, electrical, plumbing, and HVAC systems. The work includes remodeling about 4,000 square feet for Nutrition and Foods and 2,000 square feet of common/ mechanical/ phasing space, with site prep for new kitchen equipment. The project must be phased in up to two stages to minimize disruption to an occupied kitchen, and all work must conform to contract documents, the SOW, NFPA standards, local codes, and VA facility standards.
Bidders must be verified SDVOSB in VetCert and have a current Unique Entity Identifier with SAM registration, plus complete online representations and certifications. The project is a construction effort with an estimated magnitude of $2,000,000 to $5,000,000 and a performance period of 320 days from notice to proceed. Bidding documents will be issued via SAM, with no hard copies mailed. All questions must be submitted in writing to the Contract Officer. If applicable, the awardee must comply with VETS4212 reporting.
THIS IS A PRESOLICITATION NOTICE The Department of Veterans Affairs, Network Contracting Office 23, 316 Robert Street N, Suite 506, St. Paul, MN, 55401, will be issuing a solicitation Invitation for Bid (IFB) on or about 11/14/2025 to request proposals for the following project: construction services for Project # 656-20-130 Repair Building 50 Basement Kitchen located at the Saint Cloud VA Health Care System, 4801 Veterans Dr, St Cloud, MN 56303. THIS IS A TOTAL 100% SERVICE-DISABLED VETERAN OWNED SMALL BUSINESS (SDVOSB) SET-ASIDE. In accordance with Public Law 109-461 and VAAR 819.7003 (b), bidders must be registered and certified in the Veteran Small Business Certification (SBA) at (https://search.certifications.sba.gov/) as a SDVOSB. Only bids from verified SDVOSB s at VetCert database at the time of bid submission shall be deemed responsive. All non-responsive bids shall be rejected and ineligible for award. CONSTRUCTION BUDGET DESIGN LIMITATIONS/PROJECT MAGNITUDE: The Magnitude of Construction is between $2,000,000 5,000,000. NAICS: 236220 Commercial and Institutional Building Construction SMALL BUSINESS SIZE STANDARD: $45 million PROJECT DESCRIPTION: This work shall be performed at the VA Medical Center located in Saint Cloud, Minnesota. The Contractor shall furnish all labor, materials, tools and equipment required to remodel the existing Dish room and Tray Service Line for the repair Building 50 basement Kitchen project. This project will focus on the failing Architectural, Mechanical, Electrical, Plumbing (MEP) and Heating Ventilating and Air Conditioning (HVAC) Systems that are nearing their end of life. Currently, the walls, ceiling and flooring finishes are continuously separating from the substrate and are beyond reasonable maintenance repair. This project will include a phase implementation of two (2) phases or less. An estimated square footage of remodeled space impact and phasing space is roughly 4,000 square feet remodeled for Nutrition and Foods, 2,000 square feet of common (mechanical rooms and phasing/impacted space). Incorporated in the construction, site prep for new kitchen equipment which will be evaluated accordingly by the A/E of record in the contract drawings. The kitchen and dish room located in building 50 basement are currently occupied, requiring construction phasing plans that would lessen the impact on all current operations and departments. All work shall be in accordance with Contracting Documents, Scope of Work (SOW), NFPA, local building codes, VA facility standards, and other applicable requirements. The Period of Performance will be 320 days from receipt of the Notice to Proceed. This is a new requirement and there is no existing or historical procurement information relative to this requirement. The IFB (solicitation), consisting of various bid documents, specifications, drawings, forms, etc. will be available for download at System for Award Management (SAM) Contract Opportunity https://sam.gov/content/opportunities). The Contract Opportunities website is the only official location to obtain solicitation information and documents. These documents will include complete details of the solicitation and project requirements. Any amendments to the solicitation will be posted at the same location. Interested bidders are advised they are responsible for obtaining all bidding documents via Contract Opportunities, and for monitoring the Contract Opportunities website for any changes to this announcement and pending solicitation. No other information regarding scope, dates, etc. is available until issuance of the solicitation via Contract Opportunities. A bidders list will not be maintained. Hard copies of any documents regarding this project will not be mailed or made available outside of this web site. All prospective bidders must have a Unique Entity Identifier (UEI) and must be registered and active in the SAM database (http://www.sam.gov). All prospective bidders must complete electronic online Representations and Certifications within SAM. The eventual awardee shall also have on file a current Department of Labor VETS4212 Federal Contractor Reporting filing at https://www.dol.gov/agencies/vets/programs/vets4212 (if applicable). All questions must be submitted in writing to the issuing Contract Officer via email to Daniel.dobler@va.gov No telephone inquiries will be answered.
From Presolicitation posted on Nov 26, 2025The Contractor shall furnish all labor, materials, tools and equipment required to remodel the existing Dish room and Tray Service Line for the repair Building 50 basement Kitchen project. This project will focus on the failing Architectural, Mechanical, Electrical, Plumbing (MEP) and Heating Ventilating and Air Conditioning (HVAC) Systems that are nearing their end of life. Currently, the walls, ceiling and flooring finishes are continuously separating from the substrate and are beyond reasonable maintenance repair. This project will include a phased implementation of two (2) phases or less. An estimated square footage of remodeled space impact and phasing space is roughly 4,000 square feet remodeled for Nutrition and Foods, 2,000 square feet of common (mechanical rooms and phasing/impacted space). Incorporated in the construction, site prep for new kitchen equipment which will be evaluated accordingly by the A/E of record in the contract drawings. The kitchen and dish room located in building 50 basement are currently occupied, requiring construction phasing plans that would lessen the impact on all current operations and departments. The PoP is 320 Days
From Solicitation posted on Dec 30, 2025The Contractor shall furnish all labor, materials, tools and equipment required to remodel the existing Dish room and Tray Service Line for the repair Building 50 basement Kitchen project. This project will focus on the failing Architectural, Mechanical, Electrical, Plumbing (MEP) and Heating Ventilating and Air Conditioning (HVAC) Systems that are nearing their end of life. Currently, the walls, ceiling and flooring finishes are continuously separating from the substrate and are beyond reasonable maintenance repair. This project will include a phased implementation of two (2) phases or less. An estimated square footage of remodeled space impact and phasing space is roughly 4,000 square feet remodeled for Nutrition and Foods, 2,000 square feet of common (mechanical rooms and phasing/impacted space). Incorporated in the construction, site prep for new kitchen equipment which will be evaluated accordingly by the A/E of record in the contract drawings. The kitchen and dish room located in building 50 basement are currently occupied, requiring construction phasing plans that would lessen the impact on all current operations and departments. The PoP is 320 Days
From Solicitation posted on Jan 02, 2026The Contractor shall furnish all labor, materials, tools and equipment required to remodel the existing Dish room and Tray Service Line for the repair Building 50 basement Kitchen project. This project will focus on the failing Architectural, Mechanical, Electrical, Plumbing (MEP) and Heating Ventilating and Air Conditioning (HVAC) Systems that are nearing their end of life. Currently, the walls, ceiling and flooring finishes are continuously separating from the substrate and are beyond reasonable maintenance repair. This project will include a phased implementation of two (2) phases or less. An estimated square footage of remodeled space impact and phasing space is roughly 4,000 square feet remodeled for Nutrition and Foods, 2,000 square feet of common (mechanical rooms and phasing/impacted space). Incorporated in the construction, site prep for new kitchen equipment which will be evaluated accordingly by the A/E of record in the contract drawings. The kitchen and dish room located in building 50 basement are currently occupied, requiring construction phasing plans that would lessen the impact on all current operations and departments. The PoP is 320 Days
From Solicitation posted on Jan 05, 2026Notice history
5-
-
Solicitation Posted Dec 30, 2025View changes (4)
- Description: Description was updated
- Notice Type: Presolicitation → Solicitation
- Response Deadline: Jan 07, 2026 → Jan 16, 2026
- Set-Aside: SDVOSB Sole Source → None
-
Solicitation Posted Jan 02, 2026No changes from previous notice
-
Award Notice LATEST Posted Feb 26, 2026
Details
Award Information
Awardees
| Company Name | UEI | CAGE Code | Location |
|---|---|---|---|
| MDM CONSTRUCTION LLC | J96QTKC5KVD4 | 5B1A9 | WEST FARGO |