Contacts, documents and full notice history are available with a subscription.
Special Notice Expired 1 notice 2 documents

Y--Sources Sought YOSE Water & Sewer piping 140P2026R0083

Solicitation 140P2026R0083 Copied Notice ID c821b49d990149a48a8909e29c2b38ce Copied INTERIOR, DEPARTMENT OF THE — DSC CONTRACTING SERVICES DIVISION
SAM.gov
Posted
May 21, 2026
Deadline
Jun 01, 2026
Set-aside
None
NAICS
237110
PSC
Y1ND

Summary

AI-generated · May 22, 2026

Replace the existing water source, supply, and distribution system in Yosemite National Park near the Big Oak Flat Entrance Station and Hodgdon Meadow Campground, including 1,200 feet of raw water line, 7,900 feet of water supply mains, and 8,100 feet of water distribution mains with related appurtenances to serve the Welcome Center, Hodgdon Meadow Campground, and staff housing. Demolish the 100,000-gallon welded steel storage tank and construct a new 210,000-gallon steel tank with an access road, plus a new water source well and pump, a water treatment and control building, and 3,200 feet of electrical distribution/service and 3,800 feet of communications service; the existing asbestos cement water main will be abandoned in place.

Additionally, connect the Big Oak Flat sanitary sewer to the Hodgdon Meadow Campground wastewater system, including about 3,500 feet of 6-inch sanitary sewer, 20 manholes, and 3 service laterals.

Hodgdon Meadow Water Distribution System (PMIS 228661) Extend Hodgdon Meadow Campground Sewer (PMIS 196755)This project is located in Yosemite National Park, CA in the vicinity of the Big Oak Flat Entrance (Information) Station and Hodgdon Meadow Campground following along Tuolumne Grove Road and is to replace the existing water source, supply, and distribution system. The scope of the construction contract includes construction of 1,200 LF raw water line, 7,900 LF water supply, and 8,100 LF water distribution system and related appurtenances serving the Big Oak Flat Welcome Center, Hodgdon Meadow Campground, and staff housing areas; demolition of the existing 100,000-gallon welded steel water storage tank and construction of a new 210,000-gallon steel water storage tank and access road; construction of a new water source well and pump; construction of a new water treatment and control building; construction of 3,200 LF of electrical distribution and service; and construction of 3,800 LF of communications service. Existing asbestos cement water main will be abandoned in place. This project is located in Yosemite National Park, CA in the vicinity of the Big Oak Flat Entrance (Information) Station and Hodgdon Meadow Campground following along Tuolumne Grove Road. The scope of the construction contract is for connection of the Big Oak Flat sanitary sewer to the Hodgdon Meadow Campground wastewater system and includes construction of approximately 3,500 LF of 6 sanitary sewer line, 20 sanitary sewer manholes, and 3 service laterals.

From Special Notice posted on May 21, 2026

Notice history

1
  1. Special Notice LATEST Posted May 21, 2026

Details

Solicitation number 140P2026R0083
Notice ID c821b49d990149a48a8909e29c2b38ce
Notice type Special Notice
Product / Service (PSC) Y1ND
NAICS 237110
Archive date Jun 16, 2026

Award Information

Not yet awarded

Contacts

primary
Barber, Mark

Email

Phone

Agency

INTERIOR, DEPARTMENT OF THE
NATIONAL PARK SERVICE
DSC CONTRACTING SERVICES DIVISION

Place of Performance

Dates

Posted May 21, 2026 2 months ago
Last Updated Aug 06, 2026 2 days ago
Due Jun 01, 2026 2 months ago