Y--LARO 258755, Replace Dilapidated Docks & Fuel System, and Rehabilitate Parking 140P2025R0108
Summary
AI-generated · Aug 25, 2025Replace approximately 20,000 square feet of dilapidated, water-logged wood-log docks with a combination of polyethylene modular floats and steel-framed polyethylene-encased floats; update the dock anchorage with gravity anchors and dynamic mooring systems; replace gangways and all dock utilities (electrical, water, and sewer pump-out); refurbish the septic lift station; and replace the log boom wave attenuator system.
Remove two aging underground fuel storage tanks and install two above-ground 6,000-gallon tanks with a fuel delivery system to the dock and an on-dock fuel dispenser; improve site circulation by creating dedicated, accessible pedestrian routes from parking to docks and the store; reconfigure parking areas to meet growing user demand and improve traffic flow.
LARO 258755, Replace Dilapidated Docks & Fuel System, and Rehabilitate Parking Areas at Seven Bays Marina. Please view the attachment for complete details of the Sources Sought Notice. This project will replace approximately 20,000 SF of dilapidated, water-logged, wood-log docks with a combination of polyethylene modular floats and steel-framed polyethylene encased floats. The associated dock anchorage system will be replaced with gravity anchors and dynamic mooring systems. Gangways to the docks and dock utility systems (including electrical, water, and sewer pump-out) will be replaced, and the septic lift station will be refurbished. The log boom wave attenuator system will be replaced as well. Also included in this project is the removal of two aging underground fuel storage tanks and installation of two above-ground 6,000-gallon fuel tanks with fuel delivery system to dock and an on-dock fuel dispensing system. Site vehicular and pedestrian circulation will be improved, providing dedicated and accessible pedestrian routes from parking areas to docks and store. Parking areas will be reconfigured to meet the growing user demand and ensure efficient traffic flow.
From Sources Sought posted on Jul 28, 2025Notice history
1-
Sources Sought LATEST Posted Jul 28, 2025
Details
Award Information
Not yet awarded
Contacts
Phone