Y--This project is located at Jacob Riis Park within 140P2026R0038
Summary
AI-generated · Feb 04, 2026Rehabilitation of the front entry to the Jacob Riis Parking Lot at Gateway National Recreation Area (New York) to enhance visitor experience, safety, and management. Work includes demolishing existing vehicular pavements, fencing, signage, and barriers; reconfiguring the vehicle entry with new pavement, automated fee collection infrastructure, and lane striping; razing the staff building (Building 609); installing electrical and telecommunications utilities for the new pay system; installing anti-climb fencing; reorganizing pavement markings for pedestrian and vehicle circulation; adding ADA-compliant parking stalls and pedestrian walks to the beach; updating wayfinding signage; and upgrading parking lot lighting around the pay stations and existing poles to improve illumination.
This is a market research step (a Sources Sought) to gauge interest and capabilities; no proposals are requested at this time, and a competitive procurement is anticipated later in 2026, with potential small business set-aside depending on responses. Submittals should provide information demonstrating bonding capacity and experience on similar projects, along with basic company details and, if desired, marketing materials.
This is a Sources Sought Notice (SSN) for the purpose of conducting market research. Proposals are NOT being requested, nor accepted at this time. Responses are being requested from both large and small businesses. Purpose: The purpose of this notice is to gain knowledge regarding the type of interested businesses and their qualifications. The National Park Service (NPS) will use information obtained through this notice to develop an acquisition strategy. The Government anticipates conducting a competitive acquisition for this requirement. The amount of interest or lack thereof will determine the possibility of a small business or other socio-economical small business set-aside for the solicitation. Analysis of the quality of responses to this source sought announcement will be considered in the market research being conducted, and in the making of any small business set-aside determination for this requirement. Additional Information: No proposal package, solicitation, specification or drawings are available with this notice. Cost Reimbursement: Response to this announcement is strictly voluntary; no reimbursement will be made for any costs associated with providing information in response to this sources sought announcement or any follow-up information requests. North American Industry Classification System (NAICS) code: 237310 Highway Street and Bridge Construction Small Business Size Standard: $45 Million Solicitation: The NPS anticipates issuing a request for proposals in the Summer/Fall of 2026. Bonding: The NPS anticipates bid, performance and payment bonds will be required. Project Description: Project Conditions: The project is located at Gateway National Recreation area in New York. This project is located at Jacob Riis Park within Gateway National Recreation Area in the state of New York. Jacob Riis Park is part of the Jamaica Bay Unit located on the Rockaway Peninsula south of Jamaica Bay, between Fort Tilden and Neponsit. Jacob Riis Park is located south of New York City, south of Floyd Bennett Field, on Beach Channel Drive.Starting from John F. Kennedy Airport, the project location is about 10 miles south on Belt Parkway and 3.2 miles south on Flatbush Avenue just across the Marine Parkway Bridge. Project Scope: Work to be performed under this construction project includes: The primary objective of this project will rehabilitate the front entry to the Jacob Riis Parking Lot. The updates will increase visitor experience, improve safety, and simplify management of the area. The work to be done will be in accordance with the Secretary of the Interiors Standards for the Treatment of Historic Properties. Work for this project consists of: a. The demolition of vehicular pavements, site fencing, existing signage, bollards and barriers. b. Front Entry Rehabilitation Re-configuration of the vehicle entry que. New vehicular pavement, automated fee collection infrastructure, and striping. c. The RAZING of parking lot staff building (Building 609). d. Constructing electrical and telecommunications utilities to service new automated fee collection system. e. The installation of new anti climb site fencing. f. Reconfigured layout of pavement striping for parking lot pedestrian and vehicular circulation. g. ABA accessible parking stalls& accessible pedestrian walks towards the beach from the parking lot. h. The installation of wayfinding signage updates for the entirety of the parking lot. Parking lot lighting updates around the new pay stations and updates to existing parking lot light poles to optimize the lighting for the parking lot. Submittal Contents: Interested (small and large) businesses should submit the following information: (1) Company name, UEI number, address, point of contact, telephone number, and email address. (2) Business type: Classification as a Large or Small Business under the above listed NAICS, Small Business Administration (SBA) certified Historically Underutilized Business Zone (HUBZone), Veteran-Owned Small Businesses (VOSB), Service-Disabled Veteran-Owned Small Businesses (SDVOSB), SBA certified Woman Owned Small Business (WOSB), Economically Disadvantaged Woman Owned Small Business (EDWOSB). The size of a small business firm includes all parents, subsidiaries, affiliates, etc.see 13 CFR 121.108.) Misrepresentation of size status can result in penalties. (3) Statement regarding your companys bonding capacity. Letters from bonding companies are not required at this time. (4) Information demonstrating experience and capability on projects of same or similar size, scope and magnitude, and constructed under similar conditions. (5) In addition businesses may submit existing marketing materials such as capability statements and brochures. Submittal Due Date/Time: Wednesday, February 18, 2026, no later than 3:00pm MT. Submit To: Please send all documents to the Contracting Officer, Rachel Dyer at Rachel_dyer@NPS.GOV.
From Sources Sought posted on Feb 03, 2026The project is located at Gateway National Recreation area in New York. This project is located at Jacob Riis Park within Gateway National Recreation Area in the state of New York. Jacob Riis Park is part of the Jamaica Bay Unit located on the Rockaway Peninsula south of Jamaica Bay, between Fort Tilden and Neponsit. Jacob Riis Park is located south of New York City, south of Floyd Bennett Field, on Beach Channel Drive.Starting from John F. Kennedy Airport, the project location is about 10 miles south on Belt Parkway and 3.2 miles south on Flatbush Avenue just across the Marine Parkway Bridge.
From Solicitation posted on Apr 16, 2026The project is located at Gateway National Recreation area in New York. This project is located at Jacob Riis Park within Gateway National Recreation Area in the state of New York. Jacob Riis Park is part of the Jamaica Bay Unit located on the Rockaway Peninsula south of Jamaica Bay, between Fort Tilden and Neponsit. Jacob Riis Park is located south of New York City, south of Floyd Bennett Field, on Beach Channel Drive.Starting from John F. Kennedy Airport, the project location is about 10 miles south on Belt Parkway and 3.2 miles south on Flatbush Avenue just across the Marine Parkway Bridge.
From Solicitation posted on May 26, 2026The project is located at Gateway National Recreation area in New York. This project is located at Jacob Riis Park within Gateway National Recreation Area in the state of New York. Jacob Riis Park is part of the Jamaica Bay Unit located on the Rockaway Peninsula south of Jamaica Bay, between Fort Tilden and Neponsit. Jacob Riis Park is located south of New York City, south of Floyd Bennett Field, on Beach Channel Drive.Starting from John F. Kennedy Airport, the project location is about 10 miles south on Belt Parkway and 3.2 miles south on Flatbush Avenue just across the Marine Parkway Bridge.
From Solicitation posted on May 29, 2026The project is located at Gateway National Recreation area in New York. This project is located at Jacob Riis Park within Gateway National Recreation Area in the state of New York. Jacob Riis Park is part of the Jamaica Bay Unit located on the Rockaway Peninsula south of Jamaica Bay, between Fort Tilden and Neponsit. Jacob Riis Park is located south of New York City, south of Floyd Bennett Field, on Beach Channel Drive.Starting from John F. Kennedy Airport, the project location is about 10 miles south on Belt Parkway and 3.2 miles south on Flatbush Avenue just across the Marine Parkway Bridge.
From Solicitation posted on Jun 01, 2026Notice history
5-
-
Solicitation Posted Apr 16, 2026View changes (5)
- Title: Y--GATE 213019 - Jacob Riis Parking Lot → This project is located at Jacob Riis Park within
- Description: Description was updated
- Notice Type: Sources Sought → Solicitation
- Response Deadline: Feb 18, 2026 → Jun 02, 2026
- Set-Aside: Total Small Business Set-Aside (FAR 19.5) → None
-
Solicitation Posted May 26, 2026View changes (2)
- Title: This project is located at Jacob Riis Park within → Y--This project is located at Jacob Riis Park within
- Response Deadline: Jun 02, 2026 → Jun 03, 2026
-
Solicitation Posted May 29, 2026No changes from previous notice
-
Solicitation LATEST Posted Jun 01, 2026No changes from previous notice
Details
Award Information
Not yet awarded
Contacts
Phone