Y--CASA 324271, Raise and Repair the Seawall at the Castillo De San Marcos Nationa 140P2025R0099
Summary
AI-generated · Aug 24, 2025Reconstruct roughly 1,355 linear feet of seawall adjacent to the Castillo de San Marcos National Monument in St. Augustine, FL. Each section will be raised to match the elevation of the back of the center wall. The seawall consists of five segments: the North Wall, North Transition Wall, Center Wall, South Wall, and South Transition Wall.
In the latest notice, for question six, add the following information: Project Name, Dollar Value, Contract Number, Location, Prime or Subcontractor, Client and Client Contact, and Description. Responses should be emailed to the designated National Park Service contacts.
This project will reconstruct roughly 1,355 lineal feet of seawall adjacent to the Castillo de San Marcos National Monument in St. Augustine, FL. Each section will be raised to match the elevation of the back of the center wall. Reconstruction of the seawall consists of five different segments: The North Wall, North Transition Wall, Center Wall, South Wall, and South Transition Wall.
From Special Notice posted on Jul 17, 2025This project will reconstruct roughly 1,355 lineal feet of seawall adjacent to the Castillo de San Marcos National Monument in St. Augustine, FL. Each section will be raised to match the elevation of the back of the center wall. Reconstruction of the seawall consists of five different segments: The North Wall, North Transition Wall, Center Wall, South Wall, and South Transition Wall. For question six please add the following information: Project Name: Dollar Value: Contract#: Location: Prime or Subcontractor: Client and Client Contact: Description: Please email responses to the following: Joseph Wingfield joseph_wingfield@nps.gov Bai Perney bai_perney@nps.gov
From Special Notice posted on Jul 28, 2025Notice history
2-
Special Notice Posted Jul 17, 2025
Details
Award Information
Not yet awarded
Contacts
Phone
Agency
Place of Performance
Saint Augustine, Flo 32084