XTLF 26-1022 Repair Roof F541 FA3029-26-R-0002
Summary
AI-generated · Apr 07, 2026Replace the roof of Facility 541. The scope includes removing the existing roof, installing a new roofing system, and removing and reinstalling all associated gutters and downspouts, all in accordance with the provided specifications and drawings.
The construction requirement consists of a roof replacement for Facility 541, including the removal and installation of all associated gutters and downspouts, in accordance with the specifications and drawings.
From Presolicitation posted on Apr 06, 2026This construction requirement for Facility 541 involves a central modified?bitumen roof and three lower standing seam metal (SSM) roofs. The project replaces the central built?up roof with a new TPO system and adds a parapet on all four sides. The East and North SSM roofs will be removed down to the metal deck, receive new nail?base insulation, and be reconstructed with new SSM roofing. Work on the East SSM roof is limited to what is shown on the construction drawings and incidental related tasks. All work shall be completed in full accordance with the project specifications and drawings. **This notice serves as a presolicitation announcement only. A complete solicitation package, including all specifications, drawings, and proposal instructions, will be posted on SAM.gov in the near future. Interested parties are advised to monitor SAM.gov regularly for the forthcoming solicitation.
From Presolicitation posted on Apr 07, 2026Notice history
2-
Presolicitation Posted Apr 06, 2026
Details
Award Information
Not yet awarded
Contacts
Phone
Phone
Agency
Place of Performance
USA