WWYK210129 Repair Facility HVAC Control System, B2122 FA813725R0049
Summary
AI-generated · Jan 06, 2026Furnish all design/engineering services, materials, labor, plant, tools, transportation, equipment, testing services, quality control and incidentals needed to repair/replace/add HVAC controls and convert the B2122 building to a BACNet system at Tinker AFB, OK. A site investigation to verify existing conditions is required; additional as-built drawings are available from 72 ABW/CE Engineering Support (in B400) if needed. The contractor must identify all logistical, architectural, and structural work elements necessary to complete a fully operating system, and provide any assemblies or components not shown on the project drawings or SOW to deliver a ready-for-use system; government-provided information (floor plans, structural/mechanical/electrical data, underground utilities) is approximate and must be field verified.
A Honeywell partner is required at minimum for SOW 4.2.1.3. If the bidder can only perform as a General Contractor, provide your average percentages for Design, G&A, Overhead, Profit, and Bonds, and include a statement that Tinker Honeywell would be a required sub-contractor and an estimated percentage of the work that would be performed with Honeywell as the prime sub-contractor.
WWYK210129 Tinker AFB (TAFB) Oklahoma is soliciting a source s sought to see if there are any contractors capable of completing the requirements found in the attached project Statement of Work (SOW) and drawings; TAFB Honeywell partner will be required at a minimum for SOW 4.2.1.3 . If respondent is only capable of being a General Contractor, please provide your average percentage for Design, G&A, Overhead, Profit and Bonds; as well as a statement that Tinker Honeywell would be a required sub-contractor and an estimated percentage of how much of the required work would be required to be performed with Tinker Honeywell as your prime sub-contractor. The work to be performed under the terms of this contract consists of furnishing all design/engineering services, materials, labor, plant, tools, transportation, equipment, testing services, quality control and incidentals required to accomplish the repair/replacement/addition of the HVAC controls and change to a BACNet system in B2122 at Tinker Air Force Base (AFB), Oklahoma (reference the project drawings for additional location information). The Contractor shall perform a site investigation to verify existing conditions. If necessary, additional as-built drawings are available from 72 ABW/CE - Engineering Support, located in B400. The Contractor shall be responsible for identifying the necessary logistical, architectural, and structural work elements required to perform the work as described herein. Assemblies, framework, fixtures, or apparatus not readily identified on the project drawings or this Statement of Work (SOW) shall be provided by the Contractor as required for a complete, fully operating, and functioning system or systems ready for use by the Government. Information such as floor plan layouts and dimensions; structural, mechanical, and electrical data; and location of underground utilities provided by the Government for existing and new construction are based on available as-built documentation, field observation, and equipment selected as design basis by the Government. This information is to be considered approximate and shall be field verified by the Contractor.
From Sources Sought posted on Jan 05, 2026Notice history
1-
Sources Sought LATEST Posted Jan 05, 2026
Details
Award Information
Not yet awarded
Contacts
Agency
Place of Performance
USA