Wing Conference Room SVTC Conduit Install FA462625R0012
Summary
AI-generated · Aug 24, 2025Contractor shall engineer, furnish, install and test EFI&T conduit (PVC or EMT) in the Wing Conference Room of Building 500 at Malmstrom AFB to support the SIPRNet Video Teleconferencing system. The work is planned in two phases (rough-in and final) due to SVTC equipment contractor scheduling. A mandatory site visit is scheduled for 27 June 2025 at 9:00 AM MST; attendance lists must be submitted by 18 June 2025 at 2:00 PM MST. REAL ID-compliant identification is required for installation access. Questions must be submitted by 1 July 2025 at 2:00 PM MST. Interested parties should route site-visit attendance and questions to the designated contract administrator and contracting officer, with the solicitation attachments (SOW, floor plan, wage determination, and Sections L & M) providing the details.
Amendment updates include: 0002 confirming that the site visit occurred and adding project images, with questions now due by 2 July 2025; 0001 contact and submission requirements remain in effect. Amendment 0003 provides a Questions & Answers document and reiterates the prior amendments, along with additional attached site-visit images.
Amendment 0001: The purpose of this amendment is to- Notify offerors that a Site Visit will be conducted on 27 June 2025 at 9:00 AM Mountain Standard Time (MST). Interested parties shall submit their attendance list no later than (NLT) 18 June 2025 at 2:00 PM Mountain Standard Time. Clarify requirement for REAL ID-compliant identification for installation access. Questions must be submitted NLT 1 July 2025 at 2:00 PM, Mountain Standard Time (MST). Please send interest to Site Visit and questions to the Contract Administrator, Jennifer Lodmell, at jennifer.lodmell.1@us.af.mil and the Contracting Officer, Mr. Erik Hallberg, at erik.hallberg.1@us.af.mil. See Amendment 0001 attachment for acknowledgement/signature. Original: The Contractor shall engineer, furnish, install and test (EFI&T) PVC (Polyvinyl Chloride) or EMT (Electrical Metallic Tubing) conduit in the Wing Conference Room (WCR) within building 500 at Malmstrom AFB, MT. The newly installed conduit will support the Secret Internet Protocol Router Network-capable (SIPRNet) Video Teleconferencing system. The project will be completed in 2 phases: rough-in phase and completion phase, due to SVTC equipment contractor scheduling restraints. Please see attached Solicitation, Statement of Work & Floor Plan, Wage Determination, and Sections L and M (Instructions to Offerors & Evaluation Factors for Award).
From Solicitation posted on Jun 16, 2025Amendment 0002: The purpose of this amendment is to- A Site Visit was conducted on 27 June 2025 at 9:00 AM Mountain Standard Time (MST). See attached images associated with the project. Questions are now due NLT 2 July 2025 at 2:00 PM MST. Send all correspondence and offers to the following members: Jennifer Lodmell at jennifer.lodmell.1@us.af.mil Lt Alessandra Ramirez at alessandra.ramirez.1@us.af.mil Erik Hallberg at erik.hallberg.1@us.af.mil Amendment 0001: The purpose of this amendment is to- Notify offerors that a Site Visit will be conducted on 27 June 2025 at 9:00 AM Mountain Standard Time (MST). Interested parties shall submit their attendance list no later than (NLT) 18 June 2025 at 2:00 PM Mountain Standard Time. Clarify requirement for REAL ID-compliant identification for installation access. Questions must be submitted NLT 1 July 2025 at 2:00 PM, Mountain Standard Time (MST). Please send interest to Site Visit and questions to the Contract Administrator, Jennifer Lodmell, at jennifer.lodmell.1@us.af.mil and the Contracting Officer, Mr. Erik Hallberg, at erik.hallberg.1@us.af.mil. See Amendment 0001 attachment for acknowledgement/signature. Original: The Contractor shall engineer, furnish, install and test (EFI&T) PVC (Polyvinyl Chloride) or EMT (Electrical Metallic Tubing) conduit in the Wing Conference Room (WCR) within building 500 at Malmstrom AFB, MT. The newly installed conduit will support the Secret Internet Protocol Router Network-capable (SIPRNet) Video Teleconferencing system. The project will be completed in 2 phases: rough-in phase and completion phase, due to SVTC equipment contractor scheduling restraints. Please see attached Solicitation, Statement of Work & Floor Plan, Wage Determination, and Sections L and M (Instructions to Offerors & Evaluation Factors for Award).
From Solicitation posted on Jun 30, 2025Amendment 0003: See attached Questions & Answers document. Amendment 0002: The purpose of this amendment is to- A Site Visit was conducted on 27 June 2025 at 9:00 AM Mountain Standard Time (MST). See attached images associated with the project. Questions are now due NLT 2 July 2025 at 2:00 PM MST. Send all correspondence and offers to the following members: Jennifer Lodmell at jennifer.lodmell.1@us.af.mil Lt Alessandra Ramirez at alessandra.ramirez.1@us.af.mil Erik Hallberg at erik.hallberg.1@us.af.mil Amendment 0001: The purpose of this amendment is to- Notify offerors that a Site Visit will be conducted on 27 June 2025 at 9:00 AM Mountain Standard Time (MST). Interested parties shall submit their attendance list no later than (NLT) 18 June 2025 at 2:00 PM Mountain Standard Time. Clarify requirement for REAL ID-compliant identification for installation access. Questions must be submitted NLT 1 July 2025 at 2:00 PM, Mountain Standard Time (MST). Please send interest to Site Visit and questions to the Contract Administrator, Jennifer Lodmell, at jennifer.lodmell.1@us.af.mil and the Contracting Officer, Mr. Erik Hallberg, at erik.hallberg.1@us.af.mil. See Amendment 0001 attachment for acknowledgement/signature. Original: The Contractor shall engineer, furnish, install and test (EFI&T) PVC (Polyvinyl Chloride) or EMT (Electrical Metallic Tubing) conduit in the Wing Conference Room (WCR) within building 500 at Malmstrom AFB, MT. The newly installed conduit will support the Secret Internet Protocol Router Network-capable (SIPRNet) Video Teleconferencing system. The project will be completed in 2 phases: rough-in phase and completion phase, due to SVTC equipment contractor scheduling restraints. Please see attached Solicitation, Statement of Work & Floor Plan, Wage Determination, and Sections L and M (Instructions to Offerors & Evaluation Factors for Award).
From Solicitation posted on Jul 02, 2025Notice history
3Details