William H Harsha Lake Tailwater Shelter Rebuild W912QR26QA002
Summary
AI-generated · Oct 22, 2025Furnish all labor, materials, supplies, tools, and equipment to rebuild the William H Harsha Lake Tailwater shelter, performing work in strict accordance with the contract, the attached specifications, and all applicable laws and regulations. Begin within 10 calendar days of the Notice to Proceed and complete within 90 calendar days. Site is at William H Harsha Lake, 2185 Slade Road, Batavia, OH 45103.
Award will be based on the lowest total price to the Government. Bid bonds are required and must be submitted with the proposal. A site visit is highly recommended to review site conditions and measurements; the area is open to the public and no appointment is needed. Quotes must be submitted through PIEE by the stated deadline.
***Amendment 0001 posted to updated SOW*** Special Instructions: William H Harsha Lake Tailwater Shelter Rebuild The contractors work and responsibility will include furnishing all labor, materials, supplies, tools and, equipment necessary to assure that all work is conducted in accordance with the contract requirements and all applicable Federal, State and Local laws and regulations. All work will be performed in strict compliance with the attached specifications and all other terms and conditions incorporated herein. Work shall begin within 10 calendar days of Notice to Proceed and must conclude 90 calendar days after Notice to Proceed. Location: United States Corps of Engineers William H Harsha Lake2185 Slade Road Batavia, OH 45103 This procurement is 100% set-aside for Small Business, NAICS 713990, Size Standard $9M. Method of Payment under this contract will be Electronic Funds Transfer (EFT) to a commercial bank account specified by the Contractor. Note: The contract award will be based on lowest total price to the Government. Bid Bonds are required and must be provided at the same time of your submission. A site visit is highly recommended, Contractors are encouraged to attend a site visit to review the complexities of the work site, verify existing conditions, and exact measurements. Because the area is open to the public and easily accessible you do not need to make an appointment and there will not be an exact day scheduled to attend. Quotes are due 30October 2025, 12:00PM Eastern Time. Quotes shall be submitted through PIEE.
From Solicitation posted on Oct 21, 2025**Amendment 0002 posted with revised SOW and has extended to due date out to 6 November 2025 by 12:00pm ET. *** Special Instructions: William H Harsha Lake Tailwater Shelter Rebuild The contractors work and responsibility will include furnishing all labor, materials, supplies, tools and, equipment necessary to assure that all work is conducted in accordance with the contract requirements and all applicable Federal, State and Local laws and regulations. All work will be performed in strict compliance with the attached specifications and all other terms and conditions incorporated herein. Work shall begin within 10 calendar days of Notice to Proceed and must conclude 90 calendar days after Notice to Proceed. Location: United States Corps of Engineers William H Harsha Lake2185 Slade Road Batavia, OH 45103This procurement is 100% set-aside for Small Business, NAICS 713990, Size Standard $9M. Method of Payment under this contract will be Electronic Funds Transfer (EFT) to a commercial bank account specified by the Contractor. Note: The contract award will be based on lowest total price to the Government. Bid Bonds are required and must be provided at the same time of your submission. A site visit is highly recommended, Contractors are encouraged to attend a site visit to review the complexities of the work site, verify existing conditions, and exact measurements. Because the area is open to the public and easily accessible you do not need to make an appointment and there will not be an exact day scheduled to attend. Quotes are due 30October 2025, 12:00PM Eastern Time. Quotes shall be submitted through PIEE.
From Solicitation posted on Oct 29, 2025Notice history
2-
Solicitation Posted Oct 21, 2025
-
Solicitation LATEST Posted Oct 29, 2025View changes (2)
- Description: Description was updated
- Response Deadline: Oct 30, 2025 → Nov 06, 2025
Details
Award Information
Not yet awarded
Contacts
Phone
Agency
Place of Performance
Batavia, Ohio 45103
USA