WHITNEY POINT REGULATING OUTLET (RO) REHABILITATION, BROOME COUNTY, NEW YORK W912DR26RA059
Summary
AI-generated · Jun 17, 2026Rehabilitation of the Whitney Point Lake regulating outlet in Broome County, NY, involves construction to replace and upgrade dam infrastructure, including fabricating and installing a new bulkhead; three service regulating outlet gates; three emergency RO gates; 15 trashracks; an overhead bulkhead crane and structure; a trashrack lifting beam with sling; three service RO gate hoists; three emergency RO gate hoists; machinery skids; a standby diesel generator; a Dam Secondary Distribution Panel; gate hoist receptacles, plugs, assemblies; panel heaters and motor winding heaters; RO gate controls; exposed conduits; exterior lighting; receptacles; and related incidental work.
Procurement uses FAR Part 15 with a Tradeoff source selection process, with an estimated construction magnitude of $10,000,000 to $25,000,000. An official RFP will be posted on the PIEE site, and a site visit is planned. Proposals must be submitted through PIEE, and bidders should ensure they are registered in PIEE to participate.
The U.S. Army Corps of Engineers (USACE), Baltimore District has a requirement for construction to rehabilitate the Whitney Point Lake regulating outlet in Broome County, NY. The proposed design includes the fabrication and installation of: one new bulkhead, three new service regulating outlet (RO) gates, three new emergency RO gates, 15 individual trashracks, one new overhead bulkhead crane (external hoist) and structure, one new trashrack lifting beam with sling, three new service RO gate hoists, three new emergency RO gate hoists, new machinery skids, new standby diesel generator, new Dam Secondary Distribution Panel (DSDP), new gate hoist receptacles and plugs, new gate hoist assemblies, panel heaters, new motor winding heaters, new RO gate controls, new exposed steel conduits, new exterior lighting, new convenience receptacles, and incidental related work. This procurement is a Small Business Set Aside, Request for Proposal (RFP) using Federal Acquisition Regulation (FAR) 15 and the Tradeoff source selection process. The magnitude of construction is between $10,000,000.00 and $25,000,000.00. The small business size standard is $45,000,000.00 for this NAICS. An official RFP is anticipated to be posted here through the Procurement Integrated Enterprise Environment (PIEE) website on or around June 26, 2026, and a site-visit is tentatively scheduled for July 14, 2026. Interested offerors must be registered in PIEE to submit a proposal.
From Presolicitation posted on Jun 16, 2026Notice history
1-
Presolicitation LATEST Posted Jun 16, 2026
Details
Award Information
Not yet awarded