White City Southern Oregon Rehabilitation Center and Clinics Seismic Upgrades W9127N26R1B0P

Solicitation W9127N26R1B0P Copied Notice ID d06236d38f52493ea3a2df0835c43d9d Copied DEPT OF DEFENSE — W071 ENDIST PORTLAND
SAM.gov
Posted
Feb 03, 2026
Deadline
Feb 06, 2026
Set-aside
NONE
NAICS
236220
PSC
Y1DA

Summary

AI-generated · Dec 17, 2025

Contractors will design and build seismic upgrades for the White City VA SORCC, constructing two new facilities (B300 and B301), three connectors, and a new surface parking lot to support Primary Care, Radiology, Dental, and Pharmacy services. Demolition and site work include removing two existing buildings and four corridors (about 46,500 BGSF), reconfiguring roads, sidewalks, drainage, utilities, and landscaping, plus aligning or rebuilding parking and access. B300 (roughly 80,074 BGSF) will house IT, Engineering, Environmental Management, Business Office, Organizational Development, Voluntary Service, Quality Management, and Police; B301 (roughly 96,946 BGSF) will provide Primary Care, Radiology, Dental, and Pharmacy, with a connecting corridor and renovation of a portion of B201A.

This will be an unrestricted, two-phase Design-Build, Best Value Trade-Off procurement for a single Firm-Fixed-Price contract, with potential Phase II stipends up to about $400k. Proposals will be submitted electronically via PIEE, and offerors must be SAM-registered and meet applicable CMMC/DFARS requirements for handling Federal Contract Information and Controlled Unclassified Information. Two industry days are planned (in-person and additional briefing), with a pre-recorded presentation later; this pre-solicitation is to inform industry that the formal solicitation will be posted later and is not a request for proposals at this time.

Pre-solicitation Synopsis The U.S. Army Corps of Engineer (USACE) Portland District intends to solicit construction firms who are interested in submitting a competitive firm-fixed-price proposal for this project. This PRESOLICITATION announcement is for the construction/modification of the Veteran s Affairs Southern Oregon Rehabilitation Center and Clinics (SORCC) Seismic Upgrades located in White City, OR. Note, previous Notice IDs for this project on SAM.gov include W9127N25RA034 and W9127N25R0008. These are all the same project, White City VA SORCC Seismic Upgrade Project Scope: The U.S. Army Corps of Engineers, Portland District, has a requirement for a contractor to design and build two (2) new buildings, B300 and B301, three (3) new connecting corridors, and a new surface parking lot of the VA SORCC in White City, OR. Details below. SITE WORK AND DEMOLITION.? Includes sitework to accommodate pedestrian and vehicular access to the new B300 and B301, demolition of two (2) buildings and four (4) existing connecting corridors totaling approximately 46,500 building gross square feet (BGSF)? demolition of existing parking lots G and O, construction of a new surface parking lot with 188 spaces, re-alignment and/or reconstruction of roads, sidewalks, pathways, drainage and intersection; upgrades to the existing and/or construction of new utilities, landscape, and grading plans.? ? CONSTRUCTION OF NEW B300 SUPPORT BUILDING.? Includes the new B300 with approximately 80,074 BGSF and two (2) new two-story connecting corridors totaling approximately 4,388 BGSF.? The following departments will be moving into the new B300:? Office of Information Technology (Campus Main Computer Room), Engineering Service, Environmental Management Services, Business Office Service, Organizational Development, Voluntary Service, Quality Management Admin Service, and Police Service.? ? CONSTRUCTION OF B301 PRIMARY AND SPECIALTY CARE BUILDING.? Includes the new B301 with approximately 96,946 BGSF, one (1) new connecting corridor (approximately 1,400 BGSF), and renovation of a portion of the existing building B201A (approximately 1,000 BGSF). The new B301 will house SORCC s Primary Care, Radiology, Dental, and Pharmacy functions.? Acquisition Strategy: This acquisition will be an unrestricted competitively negotiated procurement using two-phase Design-Build (D-B) selection procedures and will result in the award of one (1) Firm-Fixed-Price (FFP), D-B contract. This acquisition will use a Best Value Trade-Off (BVTO) method of procurement in accordance with FAR Part 15 and two-phase D-B procedures in FAR Subpart 36.3.? The factors used for proposal evaluation will be completed in two (2) phases: 1) Phase I factors include: Designer of Record (DOR)/Design Approach and 2) Past Performance. Phase II factors include 1) Concept Design Narrative, 2) Concept Design Drawings, 3) Concept Schedule, 4) SB Commitment Plan (SBCP), 5) Project Labor Agreement (PLA), and 6) Cost/Price. This acquisition will result in a single fixed-price contract. Stipends: The government anticipates that stipends will be utilized, contingent on meeting specific requirements, for Phase 2 with a projected amount of $400,000. Magnitude of Construction: The estimated cost of the project is between $250,000,000 and $500,000,000. Period of Performance: 47 Months Set Asides and Codes: The North American Industrial Classification Code (NAICS) for this potential requirement would be 236220 Commercial and Institutional Building Construction . The related size standard is $45M. The PSC is Y1DA Construction of Hospitals and Infirmaries . Solicitations Procedures: Utilization of the Solicitation Module of the Procurement Integrated Enterprise Environment (PIEE) Module: This procurement will require offerors to submit all proposal documents electronically through the PIEE Solicitation Module. Offerors shall either self-register for a PIEE account and add the appropriate roles, or for existing PIEE users, access their account and add additional roles. There are two vendor roles required for access Proposal Manager and Proposal View Only. The Proposal Manager role is required to submit an offer to a solicitation posted in the PIEE Solicitation Module. Further details are provided not only in the Vendor Access Instructions but also via PIEE's Web Based Training module (https://pieetraining.eb.mil/wbt) under the Award heading and Solicitation link (https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml). For instructions on how to post an offer, please refer to the Posting Offer demo: https://pieetraining.eb.mil/wbt/sol/Posting_Offer.pdf Release and Submittal Dates: Phase 1 of the solicitation is tentatively scheduled for release at the back half of 2Q 2026, with Phase 1 proposals due 60 days after release. Phase 2 of the solicitation is tentatively scheduled for release, via an Amendment to those down selected during 3Q 2026, with Phase 2 proposals due 120 days after release. Anticipate award 3Q 2027. Industry Engagement: The government intends to have an in-person Industry Day prior to release of the solicitation. It will be hosted at the USACE Portland District Headquarters building; visit the linked SAM posting for additional information https://sam.gov/workspace/contract/opp/e412761e8f844472a66bfaefa3c7dc92/view. A second Industry Day, with more detailed information for this project, is anticipated for January as well. USACE and the VA are teaming up to record an updated presentation of the industry day from May 2025. It will be pre-recorded and posted on SAM.gov. System for Award Management (SAM): Offerors must be actively registered in the SAM at https://www.sam.gov/portal/public/SAM/ prior to submission of bids and prior to receiving an award. Cybersecurity Maturity Model Certification (CMMC): Pursuant to USACE Operations Order (OPORD) 2026-03, Implementation of Cybersecurity Maturity Model Certification (CMMC), this acquisition includes Federal Contract Information (FCI) and Controlled Unclassified Information (CUI) as determined by the Project Manager via the Information Security (INFOSEC) Requirements Form for this procurement.? Consequently, offerors must have the required CMMC Level Self-Assessment to be eligible for potential contract award.?The CMMC Level will be noted on the first page, Block 10 of the SF1449. DFARS provisions 252.204-7008, Compliance with Safeguarding Covered Defense Information Controls, 252.204-7019, Notice of NIST SP 800-171 DoD Assessment Requirements, and 252.204-7025, Notice of Cybersecurity Maturity Model Certification Level Requirements are included in the solicitation.? FAR clause 52.204-21 Basic Safeguarding of Covered Contractor Information Systems is also in the RFP.? DFARS clauses 252.204-7012, Safeguarding Covered Defense Information and Cyber Incident Reporting (Deviation 2024-O0013), 252.204-7020 NIST SP 800-171 DoD Assessment Requirements, and 252.204-7021 Contractor Compliance With the Cybersecurity Maturity Model Certification Level Requirements will be included in the solicitation. Point of Contact: The USACE-NWP Contracting Office will be the sole point of contact for this action. E-mail responses to the Primary Point of Contact, Nicole Adams at Nicole.A.Adams@usace.army.mil and the Jaren Bowman at Jaren.L.Bowman@usace.army.mil. E -mail is the preferred method for receiving responses to this pre-solicitation notice. THIS PRE-SOLICITATION NOTICE IS FOR THE PURPOSE OF INFORMING INDUSTRY THAT THIS SOLICITATION WILL BE POSTED ON SAM.GOV AROUND THE END OF MARCH 2026. THIS NOTICE IS NOT A REQUEST FOR PROPOSALS, AND ANY PROPOSALS RECEIVED AS A RESULT OF THIS PRE-SOLICITATION NOTICE WILL NOT BE ACCEPTED OR EVALUATED. THE GOVERNMENT RESERVES THE RIGHT TO CANCEL THIS SOLICITATION EITHER BEFORE OR AFTER THE CLOSING DATE. NO REIMBURSEMENT WILL BE MADE FOR ANY COSTS ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO THIS PRESOLICITATION NOTICE OR ANY FOLLOW-UP INFORMATION REQUEST.

From Presolicitation posted on Dec 16, 2025

08 January 2026: This resultant contract related to this announcement has been determined, it will be CMMC Level 2. Pre-solicitation Synopsis The U.S. Army Corps of Engineer (USACE) Portland District intends to solicit construction firms who are interested in submitting a competitive firm-fixed-price proposal for this project. This PRESOLICITATION announcement is for the construction/modification of the Veteran s Affairs Southern Oregon Rehabilitation Center and Clinics (SORCC) Seismic Upgrades located in White City, OR. Note, previous Notice IDs for this project on SAM.gov include W9127N25RA034 and W9127N25R0008. These are all the same project, White City VA SORCC Seismic Upgrade Project Scope: The U.S. Army Corps of Engineers, Portland District, has a requirement for a contractor to design and build two (2) new buildings, B300 and B301, three (3) new connecting corridors, and a new surface parking lot of the VA SORCC in White City, OR. Details below. SITE WORK AND DEMOLITION.? Includes sitework to accommodate pedestrian and vehicular access to the new B300 and B301, demolition of two (2) buildings and four (4) existing connecting corridors totaling approximately 46,500 building gross square feet (BGSF)? demolition of existing parking lots G and O, construction of a new surface parking lot with 188 spaces, re-alignment and/or reconstruction of roads, sidewalks, pathways, drainage and intersection; upgrades to the existing and/or construction of new utilities, landscape, and grading plans.? ? CONSTRUCTION OF NEW B300 SUPPORT BUILDING.? Includes the new B300 with approximately 80,074 BGSF and two (2) new two-story connecting corridors totaling approximately 4,388 BGSF.? The following departments will be moving into the new B300:? Office of Information Technology (Campus Main Computer Room), Engineering Service, Environmental Management Services, Business Office Service, Organizational Development, Voluntary Service, Quality Management Admin Service, and Police Service.? ? CONSTRUCTION OF B301 PRIMARY AND SPECIALTY CARE BUILDING.? Includes the new B301 with approximately 96,946 BGSF, one (1) new connecting corridor (approximately 1,400 BGSF), and renovation of a portion of the existing building B201A (approximately 1,000 BGSF). The new B301 will house SORCC s Primary Care, Radiology, Dental, and Pharmacy functions.? Acquisition Strategy: This acquisition will be an unrestricted competitively negotiated procurement using two-phase Design-Build (D-B) selection procedures and will result in the award of one (1) Firm-Fixed-Price (FFP), D-B contract. This acquisition will use a Best Value Trade-Off (BVTO) method of procurement in accordance with FAR Part 15 and two-phase D-B procedures in FAR Subpart 36.3.? The factors used for proposal evaluation will be completed in two (2) phases: 1) Phase I factors include: Designer of Record (DOR)/Design Approach and 2) Past Performance. Phase II factors include 1) Concept Design Narrative, 2) Concept Design Drawings, 3) Concept Schedule, 4) SB Commitment Plan (SBCP), 5) Project Labor Agreement (PLA), and 6) Cost/Price. This acquisition will result in a single fixed-price contract. Stipends: The government anticipates that stipends will be utilized, contingent on meeting specific requirements, for Phase 2 with a projected amount of $400,000. Magnitude of Construction: The estimated cost of the project is between $250,000,000 and $500,000,000. Period of Performance: 47 Months Set Asides and Codes: The North American Industrial Classification Code (NAICS) for this potential requirement would be 236220 Commercial and Institutional Building Construction . The related size standard is $45M. The PSC is Y1DA Construction of Hospitals and Infirmaries . Solicitations Procedures: Utilization of the Solicitation Module of the Procurement Integrated Enterprise Environment (PIEE) Module: This procurement will require offerors to submit all proposal documents electronically through the PIEE Solicitation Module. Offerors shall either self-register for a PIEE account and add the appropriate roles, or for existing PIEE users, access their account and add additional roles. There are two vendor roles required for access Proposal Manager and Proposal View Only. The Proposal Manager role is required to submit an offer to a solicitation posted in the PIEE Solicitation Module. Further details are provided not only in the Vendor Access Instructions but also via PIEE's Web Based Training module (https://pieetraining.eb.mil/wbt) under the Award heading and Solicitation link (https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml). For instructions on how to post an offer, please refer to the Posting Offer demo: https://pieetraining.eb.mil/wbt/sol/Posting_Offer.pdf Release and Submittal Dates: Phase 1 of the solicitation is tentatively scheduled for release at the back half of 2Q 2026, with Phase 1 proposals due 60 days after release. Phase 2 of the solicitation is tentatively scheduled for release, via an Amendment to those down selected during 3Q 2026, with Phase 2 proposals due 120 days after release. Anticipate award 3Q 2027. Industry Engagement: The government intends to have an in-person Industry Day prior to release of the solicitation. It will be hosted at the USACE Portland District Headquarters building; visit the linked SAM posting for additional information https://sam.gov/workspace/contract/opp/e412761e8f844472a66bfaefa3c7dc92/view. A second Industry Day, with more detailed information for this project, is anticipated for January as well. USACE and the VA are teaming up to record an updated presentation of the industry day from May 2025. It will be pre-recorded and posted on SAM.gov. System for Award Management (SAM): Offerors must be actively registered in the SAM at https://www.sam.gov/portal/public/SAM/ prior to submission of bids and prior to receiving an award. Cybersecurity Maturity Model Certification (CMMC): Pursuant to USACE Operations Order (OPORD) 2026-03, Implementation of Cybersecurity Maturity Model Certification (CMMC), this acquisition includes Federal Contract Information (FCI) and Controlled Unclassified Information (CUI) as determined by the Project Manager via the Information Security (INFOSEC) Requirements Form for this procurement.? Consequently, offerors must have the required CMMC Level Self-Assessment to be eligible for potential contract award.?The CMMC Level will be noted on the first page, Block 10 of the SF1449. DFARS provisions 252.204-7008, Compliance with Safeguarding Covered Defense Information Controls, 252.204-7019, Notice of NIST SP 800-171 DoD Assessment Requirements, and 252.204-7025, Notice of Cybersecurity Maturity Model Certification Level Requirements are included in the solicitation.? FAR clause 52.204-21 Basic Safeguarding of Covered Contractor Information Systems is also in the RFP.? DFARS clauses 252.204-7012, Safeguarding Covered Defense Information and Cyber Incident Reporting (Deviation 2024-O0013), 252.204-7020 NIST SP 800-171 DoD Assessment Requirements, and 252.204-7021 Contractor Compliance With the Cybersecurity Maturity Model Certification Level Requirements will be included in the solicitation. Point of Contact: The USACE-NWP Contracting Office will be the sole point of contact for this action. E-mail responses to the Primary Point of Contact, Nicole Adams at Nicole.A.Adams@usace.army.mil and the Jaren Bowman at Jaren.L.Bowman@usace.army.mil. E -mail is the preferred method for receiving responses to this pre-solicitation notice. THIS PRE-SOLICITATION NOTICE IS FOR THE PURPOSE OF INFORMING INDUSTRY THAT THIS SOLICITATION WILL BE POSTED ON SAM.GOV AROUND THE END OF MARCH 2026. THIS NOTICE IS NOT A REQUEST FOR PROPOSALS, AND ANY PROPOSALS RECEIVED AS A RESULT OF THIS PRE-SOLICITATION NOTICE WILL NOT BE ACCEPTED OR EVALUATED. THE GOVERNMENT RESERVES THE RIGHT TO CANCEL THIS SOLICITATION EITHER BEFORE OR AFTER THE CLOSING DATE. NO REIMBURSEMENT WILL BE MADE FOR ANY COSTS ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO THIS PRESOLICITATION NOTICE OR ANY FOLLOW-UP INFORMATION REQUEST.

From Presolicitation posted on Jan 08, 2026

26 January 2026: Added attachement - "List of Attendees - WC SORCC Industry Day April 2025" 08 January 2026: This resultant contract related to this announcement has been determined, it will be CMMC Level 2. Pre-solicitation Synopsis The U.S. Army Corps of Engineer (USACE) Portland District intends to solicit construction firms who are interested in submitting a competitive firm-fixed-price proposal for this project. This PRESOLICITATION announcement is for the construction/modification of the Veteran s Affairs Southern Oregon Rehabilitation Center and Clinics (SORCC) Seismic Upgrades located in White City, OR. Note, previous Notice IDs for this project on SAM.gov include W9127N25RA034 and W9127N25R0008. These are all the same project, White City VA SORCC Seismic Upgrade Project Scope: The U.S. Army Corps of Engineers, Portland District, has a requirement for a contractor to design and build two (2) new buildings, B300 and B301, three (3) new connecting corridors, and a new surface parking lot of the VA SORCC in White City, OR. Details below. SITE WORK AND DEMOLITION.? Includes sitework to accommodate pedestrian and vehicular access to the new B300 and B301, demolition of two (2) buildings and four (4) existing connecting corridors totaling approximately 46,500 building gross square feet (BGSF)? demolition of existing parking lots G and O, construction of a new surface parking lot with 188 spaces, re-alignment and/or reconstruction of roads, sidewalks, pathways, drainage and intersection; upgrades to the existing and/or construction of new utilities, landscape, and grading plans.? ? CONSTRUCTION OF NEW B300 SUPPORT BUILDING.? Includes the new B300 with approximately 80,074 BGSF and two (2) new two-story connecting corridors totaling approximately 4,388 BGSF.? The following departments will be moving into the new B300:? Office of Information Technology (Campus Main Computer Room), Engineering Service, Environmental Management Services, Business Office Service, Organizational Development, Voluntary Service, Quality Management Admin Service, and Police Service.? ? CONSTRUCTION OF B301 PRIMARY AND SPECIALTY CARE BUILDING.? Includes the new B301 with approximately 96,946 BGSF, one (1) new connecting corridor (approximately 1,400 BGSF), and renovation of a portion of the existing building B201A (approximately 1,000 BGSF). The new B301 will house SORCC s Primary Care, Radiology, Dental, and Pharmacy functions.? Acquisition Strategy: This acquisition will be an unrestricted competitively negotiated procurement using two-phase Design-Build (D-B) selection procedures and will result in the award of one (1) Firm-Fixed-Price (FFP), D-B contract. This acquisition will use a Best Value Trade-Off (BVTO) method of procurement in accordance with FAR Part 15 and two-phase D-B procedures in FAR Subpart 36.3.? The factors used for proposal evaluation will be completed in two (2) phases: 1) Phase I factors include: Designer of Record (DOR)/Design Approach and 2) Past Performance. Phase II factors include 1) Concept Design Narrative, 2) Concept Design Drawings, 3) Concept Schedule, 4) SB Commitment Plan (SBCP), 5) Project Labor Agreement (PLA), and 6) Cost/Price. This acquisition will result in a single fixed-price contract. Stipends: The government anticipates that stipends will be utilized, contingent on meeting specific requirements, for Phase 2 with a projected amount of $400,000. Magnitude of Construction: The estimated cost of the project is between $250,000,000 and $500,000,000. Period of Performance: 47 Months Set Asides and Codes: The North American Industrial Classification Code (NAICS) for this potential requirement would be 236220 Commercial and Institutional Building Construction . The related size standard is $45M. The PSC is Y1DA Construction of Hospitals and Infirmaries . Solicitations Procedures: Utilization of the Solicitation Module of the Procurement Integrated Enterprise Environment (PIEE) Module: This procurement will require offerors to submit all proposal documents electronically through the PIEE Solicitation Module. Offerors shall either self-register for a PIEE account and add the appropriate roles, or for existing PIEE users, access their account and add additional roles. There are two vendor roles required for access Proposal Manager and Proposal View Only. The Proposal Manager role is required to submit an offer to a solicitation posted in the PIEE Solicitation Module. Further details are provided not only in the Vendor Access Instructions but also via PIEE's Web Based Training module (https://pieetraining.eb.mil/wbt) under the Award heading and Solicitation link (https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml). For instructions on how to post an offer, please refer to the Posting Offer demo: https://pieetraining.eb.mil/wbt/sol/Posting_Offer.pdf Release and Submittal Dates: Phase 1 of the solicitation is tentatively scheduled for release at the back half of 2Q 2026, with Phase 1 proposals due 60 days after release. Phase 2 of the solicitation is tentatively scheduled for release, via an Amendment to those down selected during 3Q 2026, with Phase 2 proposals due 120 days after release. Anticipate award 3Q 2027. Industry Engagement: The government intends to have an in-person Industry Day prior to release of the solicitation. It will be hosted at the USACE Portland District Headquarters building; visit the linked SAM posting for additional information https://sam.gov/workspace/contract/opp/e412761e8f844472a66bfaefa3c7dc92/view. A second Industry Day, with more detailed information for this project, is anticipated for January as well. USACE and the VA are teaming up to record an updated presentation of the industry day from May 2025. It will be pre-recorded and posted on SAM.gov. System for Award Management (SAM): Offerors must be actively registered in the SAM at https://www.sam.gov/portal/public/SAM/ prior to submission of bids and prior to receiving an award. Cybersecurity Maturity Model Certification (CMMC): Pursuant to USACE Operations Order (OPORD) 2026-03, Implementation of Cybersecurity Maturity Model Certification (CMMC), this acquisition includes Federal Contract Information (FCI) and Controlled Unclassified Information (CUI) as determined by the Project Manager via the Information Security (INFOSEC) Requirements Form for this procurement.? Consequently, offerors must have the required CMMC Level Self-Assessment to be eligible for potential contract award.?The CMMC Level will be noted on the first page, Block 10 of the SF1449. DFARS provisions 252.204-7008, Compliance with Safeguarding Covered Defense Information Controls, 252.204-7019, Notice of NIST SP 800-171 DoD Assessment Requirements, and 252.204-7025, Notice of Cybersecurity Maturity Model Certification Level Requirements are included in the solicitation.? FAR clause 52.204-21 Basic Safeguarding of Covered Contractor Information Systems is also in the RFP.? DFARS clauses 252.204-7012, Safeguarding Covered Defense Information and Cyber Incident Reporting (Deviation 2024-O0013), 252.204-7020 NIST SP 800-171 DoD Assessment Requirements, and 252.204-7021 Contractor Compliance With the Cybersecurity Maturity Model Certification Level Requirements will be included in the solicitation. Point of Contact: The USACE-NWP Contracting Office will be the sole point of contact for this action. E-mail responses to the Primary Point of Contact, Nicole Adams at Nicole.A.Adams@usace.army.mil and the Jaren Bowman at Jaren.L.Bowman@usace.army.mil. E -mail is the preferred method for receiving responses to this pre-solicitation notice. THIS PRE-SOLICITATION NOTICE IS FOR THE PURPOSE OF INFORMING INDUSTRY THAT THIS SOLICITATION WILL BE POSTED ON SAM.GOV AROUND THE END OF MARCH 2026. THIS NOTICE IS NOT A REQUEST FOR PROPOSALS, AND ANY PROPOSALS RECEIVED AS A RESULT OF THIS PRE-SOLICITATION NOTICE WILL NOT BE ACCEPTED OR EVALUATED. THE GOVERNMENT RESERVES THE RIGHT TO CANCEL THIS SOLICITATION EITHER BEFORE OR AFTER THE CLOSING DATE. NO REIMBURSEMENT WILL BE MADE FOR ANY COSTS ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO THIS PRESOLICITATION NOTICE OR ANY FOLLOW-UP INFORMATION REQUEST.

From Presolicitation posted on Jan 26, 2026

This pre-solicitation notice is being moved to "Inactive." The Notice ID used was an interanal number. In order to limit confusion, all the information herein has been moved to https://sam.gov/workspace/contract/opp/1dc9d81e6c844dcfb9922d97b1d268ff/view with the Solicitation Number listed as the Notice ID. Any changes will be made to the new linked Pre-Solicitation. 26 January 2026: Added attachement - "List of Attendees - WC SORCC Industry Day April 2025" 08 January 2026: This resultant contract related to this announcement has been determined, it will be CMMC Level 2. Pre-solicitation Synopsis The U.S. Army Corps of Engineer (USACE) Portland District intends to solicit construction firms who are interested in submitting a competitive firm-fixed-price proposal for this project. This PRESOLICITATION announcement is for the construction/modification of the Veteran s Affairs Southern Oregon Rehabilitation Center and Clinics (SORCC) Seismic Upgrades located in White City, OR. Note, previous Notice IDs for this project on SAM.gov include W9127N25RA034 and W9127N25R0008. These are all the same project, White City VA SORCC Seismic Upgrade Project Scope: The U.S. Army Corps of Engineers, Portland District, has a requirement for a contractor to design and build two (2) new buildings, B300 and B301, three (3) new connecting corridors, and a new surface parking lot of the VA SORCC in White City, OR. Details below. SITE WORK AND DEMOLITION.? Includes sitework to accommodate pedestrian and vehicular access to the new B300 and B301, demolition of two (2) buildings and four (4) existing connecting corridors totaling approximately 46,500 building gross square feet (BGSF)? demolition of existing parking lots G and O, construction of a new surface parking lot with 188 spaces, re-alignment and/or reconstruction of roads, sidewalks, pathways, drainage and intersection; upgrades to the existing and/or construction of new utilities, landscape, and grading plans.? ? CONSTRUCTION OF NEW B300 SUPPORT BUILDING.? Includes the new B300 with approximately 80,074 BGSF and two (2) new two-story connecting corridors totaling approximately 4,388 BGSF.? The following departments will be moving into the new B300:? Office of Information Technology (Campus Main Computer Room), Engineering Service, Environmental Management Services, Business Office Service, Organizational Development, Voluntary Service, Quality Management Admin Service, and Police Service.? ? CONSTRUCTION OF B301 PRIMARY AND SPECIALTY CARE BUILDING.? Includes the new B301 with approximately 96,946 BGSF, one (1) new connecting corridor (approximately 1,400 BGSF), and renovation of a portion of the existing building B201A (approximately 1,000 BGSF). The new B301 will house SORCC s Primary Care, Radiology, Dental, and Pharmacy functions.? Acquisition Strategy: This acquisition will be an unrestricted competitively negotiated procurement using two-phase Design-Build (D-B) selection procedures and will result in the award of one (1) Firm-Fixed-Price (FFP), D-B contract. This acquisition will use a Best Value Trade-Off (BVTO) method of procurement in accordance with FAR Part 15 and two-phase D-B procedures in FAR Subpart 36.3.? The factors used for proposal evaluation will be completed in two (2) phases: 1) Phase I factors include: Designer of Record (DOR)/Design Approach and 2) Past Performance. Phase II factors include 1) Concept Design Narrative, 2) Concept Design Drawings, 3) Concept Schedule, 4) SB Commitment Plan (SBCP), 5) Project Labor Agreement (PLA), and 6) Cost/Price. This acquisition will result in a single fixed-price contract. Stipends: The government anticipates that stipends will be utilized, contingent on meeting specific requirements, for Phase 2 with a projected amount of $400,000. Magnitude of Construction: The estimated cost of the project is between $250,000,000 and $500,000,000. Period of Performance: 47 Months Set Asides and Codes: The North American Industrial Classification Code (NAICS) for this potential requirement would be 236220 Commercial and Institutional Building Construction . The related size standard is $45M. The PSC is Y1DA Construction of Hospitals and Infirmaries . Solicitations Procedures: Utilization of the Solicitation Module of the Procurement Integrated Enterprise Environment (PIEE) Module: This procurement will require offerors to submit all proposal documents electronically through the PIEE Solicitation Module. Offerors shall either self-register for a PIEE account and add the appropriate roles, or for existing PIEE users, access their account and add additional roles. There are two vendor roles required for access Proposal Manager and Proposal View Only. The Proposal Manager role is required to submit an offer to a solicitation posted in the PIEE Solicitation Module. Further details are provided not only in the Vendor Access Instructions but also via PIEE's Web Based Training module (https://pieetraining.eb.mil/wbt) under the Award heading and Solicitation link (https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml). For instructions on how to post an offer, please refer to the Posting Offer demo: https://pieetraining.eb.mil/wbt/sol/Posting_Offer.pdf Release and Submittal Dates: Phase 1 of the solicitation is tentatively scheduled for release at the back half of 2Q 2026, with Phase 1 proposals due 60 days after release. Phase 2 of the solicitation is tentatively scheduled for release, via an Amendment to those down selected during 3Q 2026, with Phase 2 proposals due 120 days after release. Anticipate award 3Q 2027. Industry Engagement: The government intends to have an in-person Industry Day prior to release of the solicitation. It will be hosted at the USACE Portland District Headquarters building; visit the linked SAM posting for additional information https://sam.gov/workspace/contract/opp/e412761e8f844472a66bfaefa3c7dc92/view. A second Industry Day, with more detailed information for this project, is anticipated for January as well. USACE and the VA are teaming up to record an updated presentation of the industry day from May 2025. It will be pre-recorded and posted on SAM.gov. System for Award Management (SAM): Offerors must be actively registered in the SAM at https://www.sam.gov/portal/public/SAM/ prior to submission of bids and prior to receiving an award. Cybersecurity Maturity Model Certification (CMMC): Pursuant to USACE Operations Order (OPORD) 2026-03, Implementation of Cybersecurity Maturity Model Certification (CMMC), this acquisition includes Federal Contract Information (FCI) and Controlled Unclassified Information (CUI) as determined by the Project Manager via the Information Security (INFOSEC) Requirements Form for this procurement.? Consequently, offerors must have the required CMMC Level Self-Assessment to be eligible for potential contract award.?The CMMC Level will be noted on the first page, Block 10 of the SF1449. DFARS provisions 252.204-7008, Compliance with Safeguarding Covered Defense Information Controls, 252.204-7019, Notice of NIST SP 800-171 DoD Assessment Requirements, and 252.204-7025, Notice of Cybersecurity Maturity Model Certification Level Requirements are included in the solicitation.? FAR clause 52.204-21 Basic Safeguarding of Covered Contractor Information Systems is also in the RFP.? DFARS clauses 252.204-7012, Safeguarding Covered Defense Information and Cyber Incident Reporting (Deviation 2024-O0013), 252.204-7020 NIST SP 800-171 DoD Assessment Requirements, and 252.204-7021 Contractor Compliance With the Cybersecurity Maturity Model Certification Level Requirements will be included in the solicitation. Point of Contact: The USACE-NWP Contracting Office will be the sole point of contact for this action. E-mail responses to the Primary Point of Contact, Nicole Adams at Nicole.A.Adams@usace.army.mil and the Jaren Bowman at Jaren.L.Bowman@usace.army.mil. E -mail is the preferred method for receiving responses to this pre-solicitation notice. THIS PRE-SOLICITATION NOTICE IS FOR THE PURPOSE OF INFORMING INDUSTRY THAT THIS SOLICITATION WILL BE POSTED ON SAM.GOV AROUND THE END OF MARCH 2026. THIS NOTICE IS NOT A REQUEST FOR PROPOSALS, AND ANY PROPOSALS RECEIVED AS A RESULT OF THIS PRE-SOLICITATION NOTICE WILL NOT BE ACCEPTED OR EVALUATED. THE GOVERNMENT RESERVES THE RIGHT TO CANCEL THIS SOLICITATION EITHER BEFORE OR AFTER THE CLOSING DATE. NO REIMBURSEMENT WILL BE MADE FOR ANY COSTS ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO THIS PRESOLICITATION NOTICE OR ANY FOLLOW-UP INFORMATION REQUEST.

From Presolicitation posted on Feb 03, 2026

Notice history

4
  1. Presolicitation Posted Dec 16, 2025 View
  2. Presolicitation Posted Jan 08, 2026
    • Description: Description was updated
  3. Presolicitation Posted Jan 26, 2026
    • Description: Description was updated
  4. Presolicitation LATEST Posted Feb 03, 2026
    • Description: Description was updated
    • Response Deadline: Mar 15, 2026Feb 06, 2026

Details

Solicitation number W9127N26R1B0P
Notice ID d06236d38f52493ea3a2df0835c43d9d
Notice type Presolicitation
Product / Service (PSC) Y1DA
NAICS 236220
Set-aside No Set aside used
Place of performance White City, Oregon
Archive date Feb 06, 2026

Award Information

Not yet awarded

Contacts

primary
Nicole Adams

Email

secondary
Jaren Bowman

Email

Agency

DEPT OF DEFENSE
DEPT OF THE ARMY
US ARMY CORPS OF ENGINEERS
ENGINEER DIVISION NORTHWESTERN
ENDIST PORTLAND
W071 ENDIST PORTLAND

Place of Performance

White City, Oregon
USA

Dates

Posted Feb 03, 2026 6 months ago
Last Updated Aug 06, 2026 2 days ago
Due Feb 06, 2026 6 months ago