Western Regional Research Center Uninterrupted Power Supply Electrical Upgrades 1232SA25R0056
Summary
AI-generated · Aug 27, 2025UPS electrical modifications are needed at the Western Regional Research Center in Albany, CA. Three existing Eaton 93E 40kVA UPS units, currently tied to a common set of distribution panels, must be reconfigured into a parallel redundant arrangement using three 20kVA units (total 60kVA backup) with each UPS supplying its own load distribution panel to prevent back-feed and possible catastrophic failure. The contractor will perform all labor, materials, equipment, and supervision for the electrical rework and provide the required panels per the project scope, including site work and coordination with the building infrastructure. Proposals will be evaluated on price with potential discussions, and an opportunity to schedule a site visit may be offered.
Between notices, the effort advanced from a presolicitation to a formal solicitation with additional details: the period of performance is defined as about 120 days, and bonding requirements are specified (bid bond at proposal; performance and payment bonds after award), with electronic submission of proposals and posted solicitation documents including drawings on SAM.gov. The work remains a small-business procurement with an award basis of lowest price technically acceptable; bidders should monitor SAM.gov for amendments and ensure compliance with all submission and bonding requirements.
The USDA, Agricultural Research Service, intends to issue a Request for Proposal (RFP) for Uninterrupted Power Supply (UPS) Electrical Modifications at the Western Regional Research Center, located in Albany, California. BACKGROUND: Currently the UPS systems all connect to the same distribution panels through additional isolated mechanical lugs as a parallel system. The UPS systems are configured as three individual UPS systems. With the current programing, the UPS systems should be connected to individual load distribution panels and not the same connections points. This current configuration may cause a back feed of one or both UPS systems resulting in a catastrophic failure or a load dump. REQUIREMENT: The contractor shall provide all labor, tools, material, equipment, and supervision for the UPS Electrical Modifications. Due to existing building infrastructure restrictions and power limitations, all three Eaton 93E 40kVA UPS systems will need to be reconfigured to 20kVA in a parallel redundant system. The Contractor will provide the services for all electrical rework and the required panels, per the Statement of Work. This will provide a total of 60kVA of backup power to provide to the USDA existing loads. BASE: Base Item Uninterrupted Power Supply Modifications GENERAL: The contract performance time is approximately 90 calendar days from the issuance of the Notice to Proceed. The North American Industry Classification System (NAICS) codes are 238210 Electrical Contractors and Other Wiring Installation Contractors, with a size standard of $19 million. This procurement is being issued as a Total Small Business Set Aside utilizing the negotiated method by issuing a Request for Proposal (RFP). The contract will be awarded, based on the Lowest Price Technically Acceptable. The Government reserves the right to conduct discussions for the purpose of clarifications of an offeror s proposal. Bid Bonds are required. Performance and Payment Bonds will be required of the successful offeror. It is anticipated that the solicitation documents, to include attachments and a drawing, will be available for viewing and downloading at www.sam.gov, on or about August 2, 2025. The solicitation and all amendments for the RFP will be posted on www.sam.gov. There will be an option to schedule a Site Visit. Specific details will be included in the solicitation that is posted. Proposals are due on or about September 2, 2025, by 4:00 p.m., EST., via electronic format. All proposals shall be emailed to angela.wingert@usda.gov. All format requirements outlined in the solicitation shall be followed for electronic submission. All proposals must be received in electronic format by the date and time specified. All responsible sources may submit a proposal which will be considered. It is the responsibility of the contractor to check www.sam.gov frequently for any amendments or changes to the solicitation. The Government is not responsible for any loss of internet connectivity or for an offeror s inability to access the documents posted at the referenced website. No copies on electronic storage (USBs, DVDs, CDs, etc...) or hard copies will be made available. If an offeror would like to be listed so that others can see that the offeror is an interested vendor, the offeror must click the Add Me to Interested Vendors button in the listing for this solicitation on www.sam.gov
From Presolicitation posted on Jul 18, 2025The USDA, Agricultural Research Service, intends to issue a Request for Proposal (RFP) for Uninterrupted Power Supply (UPS) Electrical Modifications at the Western Regional Research Center, located in Albany, California. BACKGROUND: Currently the UPS systems all connect to the same distribution panels through additional isolated mechanical lugs as a parallel system. The UPS systems are configured as three individual UPS systems. With the current programing, the UPS systems should be connected to individual load distribution panels and not the same connections points. This current configuration may cause a back feed of one or both UPS systems resulting in a catastrophic failure or a load dump. REQUIREMENT: The contractor shall provide all labor, tools, material, equipment, and supervision for the UPS Electrical Modifications. Due to existing building infrastructure restrictions and power limitations, all three Eaton 93E 40kVA UPS systems will need to be reconfigured to 20kVA in a parallel redundant system. The Contractor will provide the services for all electrical rework and the required panels, per the Statement of Work. This will provide a total of 60kVA of backup power to provide to the USDA existing loads. BASE: Base Item Uninterrupted Power Supply Modifications GENERAL: The contract performance time is approximately 90 calendar days from the issuance of the Notice to Proceed. The North American Industry Classification System (NAICS) codes are 238210 Electrical Contractors and Other Wiring Installation Contractors, with a size standard of $19 million. This procurement is being issued as a Total Small Business Set Aside utilizing the negotiated method by issuing a Request for Proposal (RFP). The contract will be awarded, based on the Lowest Price Technically Acceptable. The Government reserves the right to conduct discussions for the purpose of clarifications of an offeror s proposal. Bid Bonds are required. Performance and Payment Bonds will be required of the successful offeror. It is anticipated that the solicitation documents, to include attachments and a drawing, will be available for viewing and downloading at www.sam.gov, on or about August 2, 2025. The solicitation and all amendments for the RFP will be posted on www.sam.gov. There will be an option to schedule a Site Visit. Specific details will be included in the solicitation that is posted. Proposals are due on or about September 5, 2025, by 4:00 p.m., EST., via electronic format. All proposals shall be emailed to angela.wingert@usda.gov. All format requirements outlined in the solicitation shall be followed for electronic submission. All proposals must be received in electronic format by the date and time specified. All responsible sources may submit a proposal which will be considered. It is the responsibility of the contractor to check www.sam.gov frequently for any amendments or changes to the solicitation. The Government is not responsible for any loss of internet connectivity or for an offeror s inability to access the documents posted at the referenced website. No copies on electronic storage (USBs, DVDs, CDs, etc...) or hard copies will be made available. If an offeror would like to be listed so that others can see that the offeror is an interested vendor, the offeror must click the Add Me to Interested Vendors button in the listing for this solicitation on www.sam.gov
From Presolicitation posted on Aug 04, 2025The Contractor shall furnish all necessary labor, materials, equipment, supplies, transportation, supervision, etc., in order to perform all elements of the work identified in the Specifications and Drawings, in accordance with the clauses, attachments, and other terms and conditions set forth herein for the Uninterrupted Power Supply (UPS) Modifications at the Western Regional Research Center (WRRC), located in Albany, California. The Period of Performance is 120 days from the issuance of the Notice to Proceed. This is a Total Small Business Set Aside procurement. The NAICS Code is 238210 - Electrical Contractors and Other Wiring Installation Contractors, with a size standard of $19 Million. The Product Service Code is Z1DB - Maintenance of Laboratories and Clinics. Bonding Requirements include a Bid Bond at the time of proposal submission. Performance and Payment Bonds will be required 15 days after award.
From Solicitation posted on Aug 05, 2025The Contractor shall furnish all necessary labor, materials, equipment, supplies, transportation, supervision, etc., in order to perform all elements of the work identified in the Specifications and Drawings, in accordance with the clauses, attachments, and other terms and conditions set forth herein for the Uninterrupted Power Supply (UPS) Modifications at the Western Regional Research Center (WRRC), located in Albany, California. The Period of Performance is 120 days from the issuance of the Notice to Proceed. This is a Total Small Business Set Aside procurement. The NAICS Code is 238210 - Electrical Contractors and Other Wiring Installation Contractors, with a size standard of $19 Million. The Product Service Code is Z1DB - Maintenance of Laboratories and Clinics. Bonding Requirements include a Bid Bond at the time of proposal submission. Performance and Payment Bonds will be required 15 days after award.
From Solicitation posted on Aug 13, 2025The Contractor shall furnish all necessary labor, materials, equipment, supplies, transportation, supervision, etc., in order to perform all elements of the work identified in the Specifications and Drawings, in accordance with the clauses, attachments, and other terms and conditions set forth herein for the Uninterrupted Power Supply (UPS) Modifications at the Western Regional Research Center (WRRC), located in Albany, California. The Period of Performance is 120 days from the issuance of the Notice to Proceed. This is a Total Small Business Set Aside procurement. The NAICS Code is 238210 - Electrical Contractors and Other Wiring Installation Contractors, with a size standard of $19 Million. The Product Service Code is Z1DB - Maintenance of Laboratories and Clinics. Bonding Requirements include a Bid Bond at the time of proposal submission. Performance and Payment Bonds will be required 15 days after award.
From Solicitation posted on Sep 05, 2025The Contractor shall furnish all necessary labor, materials, equipment, supplies, transportation, supervision, etc., in order to perform all elements of the work identified in the Specifications and Drawings, in accordance with the clauses, attachments, and other terms and conditions set forth herein for the Uninterrupted Power Supply (UPS) Modifications at the Western Regional Research Center (WRRC), located in Albany, California. The Period of Performance is 120 days from the issuance of the Notice to Proceed. This is a Total Small Business Set Aside procurement. The NAICS Code is 238210 - Electrical Contractors and Other Wiring Installation Contractors, with a size standard of $19 Million. The Product Service Code is Z1DB - Maintenance of Laboratories and Clinics. Bonding Requirements include a Bid Bond at the time of proposal submission. Performance and Payment Bonds will be required 15 days after award.
From Solicitation posted on Sep 10, 2025Notice history
6-
Presolicitation Posted Jul 18, 2025
-
Presolicitation Posted Aug 04, 2025View changes (2)
- Description: Description was updated
- Response Deadline: Aug 01, 2025 → Aug 05, 2025
-
Solicitation Posted Aug 05, 2025View changes (4)
- Title: Western Regional Research Center Uninterrupted Power Supply Electrical Upgrades → WRRC Uninterrupted Power Supply (UPS) Modifications
- Description: Description was updated
- Notice Type: Presolicitation → Solicitation
- Response Deadline: Aug 05, 2025 → Sep 05, 2025
-
Solicitation Posted Aug 13, 2025No changes from previous notice
-
Solicitation LATEST Posted Sep 10, 2025No changes from previous notice
Details
Award Information
Not yet awarded
Contacts
Phone
Agency
Place of Performance
USA