WEST MUDDY CREEK #5 BRIDGE REPLACEMENT 1240LT25R0046
Summary
AI-generated · Aug 27, 2025Replacement of West Muddy Creek Bridge #4 and Bridge #5 on the Gunnison National Forest in Gunnison, CO, to restore access on NFSR 261 for highway loading configurations up to 85,000 pounds, using AASHTO LRFD RL-93 loadings. Work must be completed in accordance with the project drawings and project specifications provided in the attachments/links.
A mandatory site visit/conference will review the project requirements. Location: FS road 265 mile post 15.01 (West Muddy Creek Bridges area), Gunnison, CO. Schedule confirmation by the deadline noted in the attachments; note that cell service on site is limited.
PROJECT: West Muddy Creek Bridge #4 and Bridge #5 Replacement - Gunnison National Forest in Gunnison, Colorado. Description: Project will restore access to NFSR 261 to accommodate highway loading vehicles (85,000 pound vehicle configurations) utilizing AASHTO LRFD RL-93 loadings. Work shall be performed as shown in the Project Drawings and specified in the Project Specifications for each bridge. Seet these documents in the Attachments/Links. SITE VISIT: There will be a site visit/conference held for this project on Wednesday, September 3, 2025, at 10:00 a.m. Mountain Time. Site address located at 3906'56.5"N 10731'28.4"W or FS road 265 mile post 15.01 for the West Muddy Creek #4 and #5 Bridges Replacement Project in Gunnison CO. Contacts for Site Visit are: Patrick (Doug) Marah at patrick.marah@usda.gov or call (970)260-4761 or Daris Matos -Justiniano at daris.matos@usda.gov or call (970)964-8803. Call to schedule a site visit no later than September 2, 2025, at 1:00 p.m. Mountain Time. Please note: Limited to No Cell phone service is available on site.
From Solicitation posted on Aug 26, 202509/10/2025: AMENDMENT 0001 (A0001): Read the amendment in its entirety as it contains the Summary of Changes which includes the Attendee's List from the September 3, 2025, site visit along with answers to contractror's questions. The Amendment is located in the Attachments/Links. PROJECT: West Muddy Creek Bridge #4 and Bridge #5 Replacement - Gunnison National Forest in Gunnison, Colorado. Description: Project will restore access to NFSR 261 to accommodate highway loading vehicles (85,000 pound vehicle configurations) utilizing AASHTO LRFD RL-93 loadings. Work shall be performed as shown in the Project Drawings and specified in the Project Specifications for each bridge. Seet these documents in the Attachments/Links. SITE VISIT: There will be a site visit/conference held for this project on Wednesday, September 3, 2025, at 10:00 a.m. Mountain Time. Site address located at 3906'56.5"N 10731'28.4"W or FS road 265 mile post 15.01 for the West Muddy Creek #4 and #5 Bridges Replacement Project in Gunnison CO. Contacts for Site Visit are: Patrick (Doug) Marah at patrick.marah@usda.gov or call (970)260-4761 or Daris Matos -Justiniano at daris.matos@usda.gov or call (970)964-8803. Call to schedule a site visit no later than September 2, 2025, at 1:00 p.m. Mountain Time. Please note: Limited to No Cell phone service is available on site.
From Solicitation posted on Sep 10, 2025Notice history
2Details
Award Information
Not yet awarded
Documents
9Contacts
Agency
Place of Performance
USA