Waterline Boring at Fall River Lake, KS W912BV25QA036
Summary
AI-generated · Aug 30, 2025Prepare to install a new 2-inch HDPE water line for Fall River Lake, KS. The contractor will provide labor, equipment, and materials to bury the line underground and encase it in a steel sleeve to protect from debris and enable future replacement. The exact length is not specified in the notice.
This project is a 100% small-business set-aside with an estimated construction value of $100,000 to $250,000 and a 60-day performance period. Bidders must have a NIST score in the Supplier Performance Risk System (SPRS) prior to award.
WATERLINE BORING AT FALL RIVER, KS. This project covers the requirements that shall be required by the contractor to provide labor, equipment and various materials to install a new 2-inch High-Density Polyethylene (HDPE) water line. This water line is approximately ??? feet of underground burial and will be incased in a 6? steel sleeve to allow protection from debris and allow the Corp of Engineers an avenue for future replacement.THIS ACQUISITION IS 100% SET ASIDE FOR SMALL BUSINESS. IN ACCORDANCE WITH FAR 36.204, DISCLOSURE OF THE MAGNITUDE OF CONSTRUCTION PROJECTS, THE ESTIMATED MAGNITUDE OF CONSTRUCTION FOR THIS PROJECT IS BETWEEN $100,000 AND $250,000. THE NAICS CODE FOR THIS PROJECT IS 237110, WATER AND SEWER LINE AND RELATED STRUCTURES CONSTRUCTION. THE SIZE STANDARD IS $45M. THE PERIOD OF PERFORMANCE IS 60 DAYS. PLEASE NOTE: THIS SOLICITATION REQUIRES BIDDERS TO ENTER A NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY (NIST) SCORE IN THE SUPPLIER PERFORMANCE RISK SYSTEM (SPRS). THE NIST SCORE IS REQUIRED BEFORE AN AWARD CAN BE MADE. CONTRACT SPECIALIST: LEE MADDOX, LEE.H.MADDOX@USACE.ARMY.MIL.
From Solicitation posted on Aug 28, 2025WATERLINE BORING AT FALL RIVER, KS. This project covers the requirements that shall be required by the contractor to provide labor, equipment and various materials to install a new 2-inch High-Density Polyethylene (HDPE) water line. This water line is approximately 1,715-feet of underground burial and will be incased in a 4? steel sleeve to allow protection from debris and allow the Corp of Engineers an avenue for future replacement. THIS ACQUISITION IS 100% SET ASIDE FOR SMALL BUSINESS. IN ACCORDANCE WITH FAR 36.204, DISCLOSURE OF THE MAGNITUDE OF CONSTRUCTION PROJECTS, THE ESTIMATED MAGNITUDE OF CONSTRUCTION FOR THIS PROJECT IS BETWEEN $100,000 AND $250,000. THE NAICS CODE FOR THIS PROJECT IS 237110, WATER AND SEWER LINE AND RELATED STRUCTURES CONSTRUCTION. THE SIZE STANDARD IS $45M. THE PERIOD OF PERFORMANCE IS 60 DAYS. PLEASE NOTE: THIS SOLICITATION REQUIRES BIDDERS TO ENTER A NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY (NIST) SCORE IN THE SUPPLIER PERFORMANCE RISK SYSTEM (SPRS). THE NIST SCORE IS REQUIRED BEFORE AN AWARD CAN BE MADE. CONTRACT SPECIALIST: LEE MADDOX, LEE.H.MADDOX@USACE.ARMY.MIL.
From Solicitation posted on Sep 04, 2025WATERLINE BORING AT FALL RIVER, KS. This project covers the requirements that shall be required by the contractor to provide labor, equipment and various materials to install a new 2-inch High-Density Polyethylene (HDPE) water line. This water line is approximately 1,715-feet of underground burial and will be incased in a 4? steel sleeve to allow protection from debris and allow the Corp of Engineers an avenue for future replacement. THIS ACQUISITION IS 100% SET ASIDE FOR SMALL BUSINESS. IN ACCORDANCE WITH FAR 36.204, DISCLOSURE OF THE MAGNITUDE OF CONSTRUCTION PROJECTS, THE ESTIMATED MAGNITUDE OF CONSTRUCTION FOR THIS PROJECT IS BETWEEN $100,000 AND $250,000. THE NAICS CODE FOR THIS PROJECT IS 237110, WATER AND SEWER LINE AND RELATED STRUCTURES CONSTRUCTION. THE SIZE STANDARD IS $45M. THE PERIOD OF PERFORMANCE IS 60 DAYS. PLEASE NOTE: THIS SOLICITATION REQUIRES BIDDERS TO ENTER A NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY (NIST) SCORE IN THE SUPPLIER PERFORMANCE RISK SYSTEM (SPRS). THE NIST SCORE IS REQUIRED BEFORE AN AWARD CAN BE MADE. CONTRACT SPECIALIST: LEE MADDOX, LEE.H.MADDOX@USACE.ARMY.MIL. AMENDMENT 0001 is to provide a corrected map on the last page of the SOW. Corrected SOW included in the Solicitation Amendment W912BV25QA036 0001.
From Solicitation posted on Sep 16, 2025WATERLINE BORING AT FALL RIVER, KS. This project covers the requirements that shall be required by the contractor to provide labor, equipment and various materials to install a new 2-inch High-Density Polyethylene (HDPE) water line. This water line is approximately 1,715-feet of underground burial and will be incased in a 4? steel sleeve to allow protection from debris and allow the Corp of Engineers an avenue for future replacement. THIS ACQUISITION IS 100% SET ASIDE FOR SMALL BUSINESS. IN ACCORDANCE WITH FAR 36.204, DISCLOSURE OF THE MAGNITUDE OF CONSTRUCTION PROJECTS, THE ESTIMATED MAGNITUDE OF CONSTRUCTION FOR THIS PROJECT IS BETWEEN $100,000 AND $250,000. THE NAICS CODE FOR THIS PROJECT IS 237110, WATER AND SEWER LINE AND RELATED STRUCTURES CONSTRUCTION. THE SIZE STANDARD IS $45M. THE PERIOD OF PERFORMANCE IS 60 DAYS. PLEASE NOTE: THIS SOLICITATION REQUIRES BIDDERS TO ENTER A NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY (NIST) SCORE IN THE SUPPLIER PERFORMANCE RISK SYSTEM (SPRS). THE NIST SCORE IS REQUIRED BEFORE AN AWARD CAN BE MADE. CONTRACT SPECIALIST: LEE MADDOX, LEE.H.MADDOX@USACE.ARMY.MIL. AMENDMENT 0001 is to provide a corrected map on the last page of the SOW. Corrected SOW included in the Solicitation Amendment W912BV25QA036 0001. Amendment No. 0002 is hereby issued to extend the quote due date to 2 PM Central Time, 25 SEP 2025. This amendment also updates WD KS20250037, Heavy, 1/3/2025 to WD KS20250037, Heavy, 9/5/2025.
From Solicitation posted on Sep 22, 2025WATERLINE BORING AT FALL RIVER, KS. This project covers the requirements that shall be required by the contractor to provide labor, equipment and various materials to install a new 2-inch High-Density Polyethylene (HDPE) water line. This water line is approximately 1,715-feet of underground burial and will be incased in a 4? steel sleeve to allow protection from debris and allow the Corp of Engineers an avenue for future replacement. THIS ACQUISITION IS 100% SET ASIDE FOR SMALL BUSINESS. IN ACCORDANCE WITH FAR 36.204, DISCLOSURE OF THE MAGNITUDE OF CONSTRUCTION PROJECTS, THE ESTIMATED MAGNITUDE OF CONSTRUCTION FOR THIS PROJECT IS BETWEEN $100,000 AND $250,000. THE NAICS CODE FOR THIS PROJECT IS 237110, WATER AND SEWER LINE AND RELATED STRUCTURES CONSTRUCTION. THE SIZE STANDARD IS $45M. THE PERIOD OF PERFORMANCE IS 60 DAYS. PLEASE NOTE: THIS SOLICITATION REQUIRES BIDDERS TO ENTER A NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY (NIST) SCORE IN THE SUPPLIER PERFORMANCE RISK SYSTEM (SPRS). THE NIST SCORE IS REQUIRED BEFORE AN AWARD CAN BE MADE. CONTRACT SPECIALIST: LEE MADDOX, LEE.H.MADDOX@USACE.ARMY.MIL. AMENDMENT 0001 is to provide a corrected map on the last page of the SOW. REVISED SOW included in the Solicitation Amendment W912BV25QA036 0003. Amendment No. 0003 is hereby issued to extend the quote due date to 2 PM Central Time, 26 SEP 2025. This amendment also updates WD KS20250037, Heavy, 1/3/2025 to WD KS20250037, Heavy, 9/5/2025.
From Solicitation posted on Sep 24, 2025WATERLINE BORING AT FALL RIVER, KS. This project covers the requirements that shall be required by the contractor to provide labor, equipment and various materials to install a new 2-inch High-Density Polyethylene (HDPE) water line. This water line is approximately 1,715-feet of underground burial and will be incased in a 4? steel sleeve to allow protection from debris and allow the Corp of Engineers an avenue for future replacement. THIS ACQUISITION IS 100% SET ASIDE FOR SMALL BUSINESS. IN ACCORDANCE WITH FAR 36.204, DISCLOSURE OF THE MAGNITUDE OF CONSTRUCTION PROJECTS, THE ESTIMATED MAGNITUDE OF CONSTRUCTION FOR THIS PROJECT IS BETWEEN $100,000 AND $250,000. THE NAICS CODE FOR THIS PROJECT IS 237110, WATER AND SEWER LINE AND RELATED STRUCTURES CONSTRUCTION. THE SIZE STANDARD IS $45M. THE PERIOD OF PERFORMANCE IS 60 DAYS. PLEASE NOTE: THIS SOLICITATION REQUIRES BIDDERS TO ENTER A NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY (NIST) SCORE IN THE SUPPLIER PERFORMANCE RISK SYSTEM (SPRS). THE NIST SCORE IS REQUIRED BEFORE AN AWARD CAN BE MADE. CONTRACT SPECIALIST: LEE MADDOX, LEE.H.MADDOX@USACE.ARMY.MIL. AMENDMENT 0001 is to provide a corrected map on the last page of the SOW. REVISED SOW included in the Solicitation Amendment W912BV25QA036 0003. This amendment also updates WD KS20250037, Heavy, 1/3/2025 to WD KS20250037, Heavy, 9/5/2025.Amendment No. 0004 is hereby issued to extend the quote due date to 2 PM Central Time, 30 SEP 2025.
From Solicitation posted on Sep 25, 2025Notice history
6-
Solicitation Posted Aug 28, 2025
-
Solicitation Posted Sep 22, 2025View changes (2)
- Description: Description was updated
- Response Deadline: Sep 23, 2025 → Sep 25, 2025
-
Solicitation Posted Sep 24, 2025View changes (2)
- Description: Description was updated
- Response Deadline: Sep 25, 2025 → Sep 26, 2025
-
Solicitation LATEST Posted Sep 25, 2025View changes (2)
- Description: Description was updated
- Response Deadline: Sep 26, 2025 → Sep 30, 2025
Details
Award Information
Not yet awarded
Contacts
Phone