Water Well Treatment FA4626-25-Water-Well-Treatment
Summary
AI-generated · Aug 24, 2025Disinfect the water system at Missile Alert Facility M-01. The contractor shall provide all labor, equipment, and materials needed to disinfect the water system from the well through the chlorination system in the pump house.
This is a sources-sought opportunity to gauge industry capability. The work must be performed in accordance with the statement of work.
The Contractor shall provide all labor, equipment, and materials to disinfect the water system at Missile Alert Facility (MAF) M-01. The water system shall be disinfected from the well through the chlorination system in the pump house in accordance with the statement of work.
From Sources Sought posted on Jul 17, 2025Notice history
1-
Sources Sought LATEST Posted Jul 17, 2025
Details
Award Information
Not yet awarded
Contacts
Phone
Phone
Agency
Place of Performance
USA