Contacts, documents and full notice history are available with a subscription.
Solicitation 8A Due Soon 2 notices 37 documents

WASTEWATER PRETREATMENT PLANT OPERATION AND MAINTENANCE SERVICES 2031ZA26R00023

Solicitation 2031ZA26R00023 Copied Notice ID d6f37fcc74b3413db18ff3db1d227560 Copied TREASURY, DEPARTMENT OF THE — OFFICE OF THE CHIEF PROCUREMENT OFFICER
SAM.gov
Posted
Aug 07, 2026
Deadline
Sep 15, 2026
Set-aside
8A
NAICS
561210
PSC
S216

Summary

AI-generated · Aug 06, 2026

Provide 24/7 operation, maintenance, supplies, and technical support for BEP’s Industrial Wastewater Pretreatment Plant and associated Wastewater and Storm Water Programs at the Washington, DC facility. The contractor will manage and operate four pretreatment systems—Wiping Solution, Plating, Grease Trap, and Wiping Solution Recycling—plus an on-site laboratory and material storage area, performing routine maintenance and offering technical assistance to keep the pretreatment and storm water programs running smoothly.

06 Aug 2026 - Amendment 0001 The Bureau of Engraving & Printing’s (BEP) Facility located in Washington, DC contains an Industrial Wastewater Pretreatment Plant (WWPP). BEP’s objective is to procure contractor services to manage, operate, maintain supplies and perform maintenance and provide technical support for the Wastewater and Storm Water Programs. The WWPP requires services to support the BEP on a 24/7 basis. The WWPP currently consists of four (4) systems: (1) Wiping Solution Wastewater Pretreatment Plant (WSWPP), (2) Plating Wastewater Pretreatment Plant (PWPP), (3) Grease Trap Wastewater Pretreatment Plant (GTWPP), and (4) Wiping Solution Recycling Plant (WSRP). The WWPP includes an on-site lab and a materials storage area.

From Solicitation posted on Aug 06, 2026

07 Aug 2026 - Amendment 0002 06 Aug 2026 - Amendment 0001 The Bureau of Engraving & Printing’s (BEP) Facility located in Washington, DC contains an Industrial Wastewater Pretreatment Plant (WWPP). BEP’s objective is to procure contractor services to manage, operate, maintain supplies and perform maintenance and provide technical support for the Wastewater and Storm Water Programs. The WWPP requires services to support the BEP on a 24/7 basis. The WWPP currently consists of four (4) systems: (1) Wiping Solution Wastewater Pretreatment Plant (WSWPP), (2) Plating Wastewater Pretreatment Plant (PWPP), (3) Grease Trap Wastewater Pretreatment Plant (GTWPP), and (4) Wiping Solution Recycling Plant (WSRP). The WWPP includes an on-site lab and a materials storage area.

From Solicitation posted on Aug 07, 2026

Notice history

2
  1. Solicitation Posted Aug 06, 2026 View
  2. Solicitation LATEST Posted Aug 07, 2026
    • Description: Description was updated

Details

Solicitation number 2031ZA26R00023
Notice ID d6f37fcc74b3413db18ff3db1d227560
Notice type Solicitation
Product / Service (PSC) S216
NAICS 561210
Place of performance Washington, District of Columbia
Archive date Sep 30, 2026

Award Information

Not yet awarded