Contacts, documents and full notice history are available with a subscription.
Combined Synopsis/Solicitation SBA Expired 1 notice 1 document

Walk-in Freezer Installation PANMCC25P0000017781

Solicitation PANMCC25P0000017781 Copied Notice ID 743bb145f02a4c548309db4aaa1d29fd Copied DEPT OF DEFENSE — W6QM MICC-FT BENNING
SAM.gov
Posted
Jul 01, 2025
Deadline
Jul 09, 2025
Set-aside
SBA
NAICS
811310
PSC
4130

Summary

AI-generated · Aug 24, 2025

Provide all labor, equipment, materials, transportation, supervision, and other non-personal services needed to deliver and install a Walk-In Freezer at Fort Moore, GA, in accordance with the Statement of Work, with the exception of items designated as government furnished property or services. The contractor must have experience delivering, placing, and securing the walk-in freezer to the existing surface in the prescribed area, supply any parts required to make the freezer operational, and perform all work to the contract’s specifications and schedule.

Cleanup requirements include removing trash, debris, and surplus materials during and after each workday and leaving the work site clean at project completion. See Attachment 1 (SOW) for full details.

Description of Installation: The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform all work in connection with the installation of Walk-In Freezer, Fort Moore, Georgia, as defined in this Statement of Work, except for those items specified as government furnished property and services. The Contractor shall perform to the standards in this contract. Scope: The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, other items, and non-personal services to perform operations necessary to deliver and install Walk-In Freezer. The Contractor is expected to have experience with delivery, placement and securing Walk-In Freezer to the existing surface in the prescribed area. These services shall be performed in accordance with the specifications and schedule of work. The contractor shall provide parts and other items required to make the Walk-In Freezer operational. Clean up after Installation: The contractor shall remove all trash, debris, and surplus materials from the work site during and at the end of each workday; and shall leave the work site clean of all debris when work is completed. See attachement 1 (SOW)

From Combined Synopsis/Solicitation posted on Jul 01, 2025

Notice history

1
  1. Combined Synopsis/Solicitation LATEST Posted Jul 01, 2025 View

Details

Solicitation number PANMCC25P0000017781
Notice ID 743bb145f02a4c548309db4aaa1d29fd
Notice type Combined Synopsis/Solicitation
Product / Service (PSC) 4130
NAICS 811310
Place of performance Fort Benning, Georgia
Archive date Jul 24, 2025

Award Information

Not yet awarded

Documents

1
View on SAM.gov

Contacts

primary
Christopher Kimble

Email

secondary
Stacia M. Rivers

Email

Agency

DEPT OF DEFENSE
DEPT OF THE ARMY
AMC
ACC
MISSION INSTALLATION CONTRACTING COMMAND
FDO EUSTIS
W6QM MICC-FT BENNING

Place of Performance

Fort Benning, Georgia 31905
USA

Dates

Posted Jul 01, 2025 1 year ago
Last Updated Aug 06, 2026 1 day ago
Due Jul 09, 2025 1 year ago