AI-generated · Aug 24, 2025Replace the deteriorated Fryingpan Creek Bridge on Sunrise Road (31 miles north of Packwood, WA) with a single-span, 218.5-foot steel plate girder bridge and a cast-in-place concrete deck; demolish the existing steel arch/girder bridge after the new structure is complete. Abutments will be founded on drilled shafts. Sunrise Road is the sole vehicular access to the Sunrise area and is essential to park operations, local economies, and visitor access.
This Sources Sought is a market research effort to identify contractors with the capability to perform the work; final plans and specifications are not yet available. Estimated project value is $10–$20 million. Construction will occur during a short season (roughly June–October) in a remote, high-elevation setting with an extremely tight work area and constraints such as short in-water windows due to threatened fish and bird species, potential material delivery challenges, and the need to keep the road open for as much of the period as possible. The project also includes custom stone work and other site-specific requirements (see attachment for full details).
PROJECT: WA NP MORA 11(1), Fryingpan Creek Bridge This solicitation is a "REQUEST FOR INFORMATION" only for the proposed contract work listed in the requirements section below. This Sources Sought Notice is not a request for formal proposals or quotes. Final plans and specifications are not available at this time. Responses to this Sources Sought must be received by email no later than the date specified in the response section. This intent of this sources sought is for market research to determine contractors with the necessary experience and resources capable of performing this work. REQUIREMENT: NAICS Code 237310, Highway, Street, and Bridge Construction apply to this procurement with a size standard of $45 million. Project Location: 31 Miles North of Packwood, Pierce County, Washington Estimated Price Range: $10,000,000 and $20,000,000 The purpose of the proposed project is to replace the deteriorated Fryingpan Creek Bridge to ensure the bridge provides a structurally sound, long-term, vehicular bridge crossing over Fryingpan Creek. The Fryingpan Creek Bridge, which is part of the 15-mile Sunrise Road, is vital to park operations, local economies, and visitor use and enjoyment. Sunrise Road serves as the sole vehicular access to the popular Sunrise area (the second busiest area in the park) and is a primary destination for visitors coming from the greater Seattle and Yakima metropolitan areas. Sunrise Road also provides access to the White River Campground and popular park wilderness trails, including the historically significant Wonderland Trail. The project area is remote, and the construction season is relatively short with typical construction starting in June and ending in October. The project includes construction of a single span, 218.5-foot long steel plate girder bridge with cast-in-place concrete deck. Abutments are founded on deep foundation (drilled shafts). The work includes demolition of the existing steel arch girder bridge upon completion of the new structure. Project constraints may include: Short in-water work window for the work needed Threatened fish and bird species in the area creating short work windows. This location is at a high elevation so the work window is even shorter than most projects of its kind Custom stone work required EXTREMELY tight work area Needs to keep the road open for the most part Material delivery will be a challenge See Attachment for full requirement.
From Sources Sought posted on Jul 14, 2025Notice history
1-
Sources Sought LATEST Posted Jul 14, 2025
Details
Award Information
Not yet awarded
Contacts
Phone
Agency
Place of Performance
USA