Dana Point West Breakwater Repair Project W912PL26BA001

Solicitation W912PL26BA001 Copied Notice ID 37bbf239bff4444593f04610bb7fe436 Copied DEPT OF DEFENSE — W075 ENDIST LOS ANGELES
SAM.gov
Posted
Jan 29, 2026
Deadline
Jan 28, 2026
Set-aside
None
NAICS
237990
PSC
Z1KZ

Summary

AI-generated · Dec 13, 2025

Complete repair of the west breakwater at Dana Point Harbor, including replacing displaced armor stone and resetting existing stone to interlock with the new material. Approximately 3,500 tons of new armor stone will be placed on the breakwater.

Up to 45,000 cubic yards of sediment may be dredged to access the breakwater, with all dredged material to be beneficially used as nearshore nourishment offshore of Doheny State Beach. Attending the project site visit is not required but strongly encouraged to attend in its entirety; refer to the Site Visit Document for details.

Complete repair of the west breakwater located at the Dana Point Harbor. The work consists of replacing displaced armor stone and resetting existing stone to interlock with the new stone. Approximately 3,500 tons of new armor stone to be placed on the breakwater. Approximately 45,000 cubic yards of sediment may be dredged for access to the breakwater. All dredged material will be beneficially used as nearshore nourishment offshore of Doheny State Beach. Attending the project site visit is not required but strongly encouraged to attend in its entirety. Refer to Site Visit Document attached for further details.

From Solicitation posted on Dec 12, 2025

*Amendment 0001- Updated SF1442 with bid opening date extended to January 28,2026, updated Section 00 45 00, Section 00 70 00 Section 00 73 46, Section 35 31 23, Sheet C Revised general sheet notes, uploaded Site Visit Sign in sheet* - Complete repair of the west breakwater located at the Dana Point Harbor. The work consists of replacing displaced armor stone and resetting existing stone to interlock with the new stone. Approximately 3,500 tons of new armor stone to be placed on the breakwater. Approximately 45,000 cubic yards of sediment may be dredged for access to the breakwater. All dredged material will be beneficially used as nearshore nourishment offshore of Doheny State Beach. Attending the project site visit is not required but strongly encouraged to attend in its entirety. Refer to Site Visit Document attached for further details.

From Solicitation posted on Jan 20, 2026

*Amendment 0001- Updated SF1442 with bid opening date extended to January 28,2026, updated Section 00 45 00, Section 00 70 00 Section 00 73 46, Section 35 31 23, Sheet C Revised general sheet notes, uploaded Site Visit Sign in sheet* - Complete repair of the west breakwater located at the Dana Point Harbor. The work consists of replacing displaced armor stone and resetting existing stone to interlock with the new stone. Approximately 3,500 tons of new armor stone to be placed on the breakwater. Approximately 45,000 cubic yards of sediment may be dredged for access to the breakwater. All dredged material will be beneficially used as nearshore nourishment offshore of Doheny State Beach. Attending the project site visit is not required but strongly encouraged to attend in its entirety. Refer to Site Visit Document attached for further details.

From Solicitation posted on Jan 21, 2026

*Amendment 0002 - Updated section 00 70 00, Updated Section 00 21 13 regarding Virtual bid opening procedure, uploaded opening participation instructions, Updated Section 00 73 46 Wage Determination* *Amendment 0001- Updated SF1442 with bid opening date extended to January 28,2026, updated Section 00 45 00, Section 00 70 00 Section 00 73 46, Section 35 31 23, Sheet C Revised general sheet notes, uploaded Site Visit Sign in sheet* - Complete repair of the west breakwater located at the Dana Point Harbor. The work consists of replacing displaced armor stone and resetting existing stone to interlock with the new stone. Approximately 3,500 tons of new armor stone to be placed on the breakwater. Approximately 45,000 cubic yards of sediment may be dredged for access to the breakwater. All dredged material will be beneficially used as nearshore nourishment offshore of Doheny State Beach. Attending the project site visit is not required but strongly encouraged to attend in its entirety. Refer to Site Visit Document attached for further details.

From Solicitation posted on Jan 22, 2026

*Amendment 0002 - Updated section 00 70 00, Updated Section 00 21 13 regarding Virtual bid opening procedure, uploaded opening participation instructions, Updated Section 00 73 46 Wage Determination* *Amendment 0001- Updated SF1442 with bid opening date extended to January 28,2026, updated Section 00 45 00, Section 00 70 00 Section 00 73 46, Section 35 31 23, Sheet C Revised general sheet notes, uploaded Site Visit Sign in sheet* - Complete repair of the west breakwater located at the Dana Point Harbor. The work consists of replacing displaced armor stone and resetting existing stone to interlock with the new stone. Approximately 3,500 tons of new armor stone to be placed on the breakwater. Approximately 45,000 cubic yards of sediment may be dredged for access to the breakwater. All dredged material will be beneficially used as nearshore nourishment offshore of Doheny State Beach. Attending the project site visit is not required but strongly encouraged to attend in its entirety. Refer to Site Visit Document attached for further details.

From Solicitation posted on Jan 26, 2026

*Amendment 0002 - Updated section 00 70 00, Updated Section 00 21 13 regarding Virtual bid opening procedure, uploaded opening participation instructions, Updated Section 00 73 46 Wage Determination* *Amendment 0001- Updated SF1442 with bid opening date extended to January 28,2026, updated Section 00 45 00, Section 00 70 00 Section 00 73 46, Section 35 31 23, Sheet C Revised general sheet notes, uploaded Site Visit Sign in sheet* - Complete repair of the west breakwater located at the Dana Point Harbor. The work consists of replacing displaced armor stone and resetting existing stone to interlock with the new stone. Approximately 3,500 tons of new armor stone to be placed on the breakwater. Approximately 45,000 cubic yards of sediment may be dredged for access to the breakwater. All dredged material will be beneficially used as nearshore nourishment offshore of Doheny State Beach. Attending the project site visit is not required but strongly encouraged to attend in its entirety. Refer to Site Visit Document attached for further details.

From Solicitation posted on Jan 28, 2026

*Update- Bid Abstract uploaded/attached* *Amendment 0002 - Updated section 00 70 00, Updated Section 00 21 13 regarding Virtual bid opening procedure, uploaded opening participation instructions, Updated Section 00 73 46 Wage Determination* *Amendment 0001- Updated SF1442 with bid opening date extended to January 28,2026, updated Section 00 45 00, Section 00 70 00 Section 00 73 46, Section 35 31 23, Sheet C Revised general sheet notes, uploaded Site Visit Sign in sheet* - Complete repair of the west breakwater located at the Dana Point Harbor. The work consists of replacing displaced armor stone and resetting existing stone to interlock with the new stone. Approximately 3,500 tons of new armor stone to be placed on the breakwater. Approximately 45,000 cubic yards of sediment may be dredged for access to the breakwater. All dredged material will be beneficially used as nearshore nourishment offshore of Doheny State Beach. Attending the project site visit is not required but strongly encouraged to attend in its entirety. Refer to Site Visit Document attached for further details.

From Solicitation posted on Jan 29, 2026

Notice history

7
  1. Solicitation Posted Dec 12, 2025 View
  2. Solicitation Posted Jan 20, 2026
    • Title: W912PL26BA001 - Dana Point Breakwater RepairW912PL26BA001
    • Description: Description was updated
    • Response Deadline: Jan 26, 2026Jan 28, 2026
  3. Solicitation Posted Jan 21, 2026
    • Title: W912PL26BA001Dana Point West Breakwater Repair Project
  4. Solicitation Posted Jan 22, 2026
    • Description: Description was updated
    • Response Deadline: Jan 28, 2026Jan 26, 2026
  5. Solicitation Posted Jan 26, 2026
    • Response Deadline: Jan 26, 2026Jan 28, 2026
  6. Solicitation Posted Jan 28, 2026
    No changes from previous notice
  7. Solicitation LATEST Posted Jan 29, 2026
    • Description: Description was updated

Details

Solicitation number W912PL26BA001
Notice ID 37bbf239bff4444593f04610bb7fe436
Notice type Solicitation
Product / Service (PSC) Z1KZ
NAICS 237990
Archive date Jan 29, 2026

Award Information

Not yet awarded

Documents

1
View on SAM.gov

Contacts

primary
Ashley Powell

Email

Phone

Agency

DEPT OF DEFENSE
DEPT OF THE ARMY
US ARMY CORPS OF ENGINEERS
ENGINEER DIVISION SOUTH PACIFIC
ENDIST LOS ANGELES
W075 ENDIST LOS ANGELES

Place of Performance

Dana Point Harbor, CA