W912DY26RA032 W912DY26RA032
Summary
AI-generated · Jan 29, 2026The VA has initiated a facility reduction at the Palo Alto VA Medical Center and the project focuses on Building 54. The contract requires planning and execution of comprehensive pre-demolition environmental sampling to identify asbestos-containing materials (ACM) and other regulated materials (ORM) across the building and associated areas (exterior, roof, basement/crawl spaces). A Waste Stream Analysis for RCRA 8 metals, lead-based paint, and PCBs in paint must be performed on painted components. The contractor must access all areas present, and note any areas not accessible with size and prior use.
Deliverables include a Pre-Demolition Assessment Report based on the sampling results, with laboratory testing completed within 35 workdays after field activity. The report must quantify contamination and outline removal and disposal methods in accordance with federal, state, and local regulations, and address any inaccessible areas with their extent and prior use. All work must follow the requirements in the PWS and attached documents.
The Veteran?s Administration has tasked the US Army Corps of Engineers Engineering and Support Center, Huntsville to initiate a Facility Reduction requirement at their Veteran?s Medical Center facility in Palo Alto, California. One building is considered excess to the center?s needs. The purpose of this contract is to procure Pre-demolition surveys according to the requirements set forth in this Performance Work Statement (PWS).The objective is to plan and complete the environmental sampling of a facility at the installation. The structure of concern is Building 54. The sampling will determine ACM and ORM materials and complete a Waste Stream Analysis for RCRA 8 metals, lead-based paint (LBP) and PCB?s-in-paint for those parts of the structure currently identified as potentially having any painted components. Following sampling, the Contractor shall be able to completely quantify the environmental contamination present and the methods required to remove and dispose of said contamination in a safe manner. All sampling shall be planned and performed in accordance with Federal, State, and local regulations for the installation. All recommendations for follow-on actions shall also be in accordance with Federal, State, and local regulations. Laboratory testing and analysis shall be completed within 35 workdays following the respective site sampling field activity completion. The results of the site investigation and sampling effort will be provided in an individual Pre-Demolition Assessment Report for the installation that will be submitted within 15 workdays following the receipt of sample results. The intent of this contract effort is to provide comprehensive sampling for all ACM/ORM materials to include the facility exterior, roof, basement/crawl spaces, etc. The Contractor shall make every reasonable effort to access these areas when present in each facility. The Report will specifically address any areas within given structures that were not accessible during the survey and state the size of the area not accessed, and current or immediate previous use of the area not sampled.Refer to the PWS and attached documents for requirement specifics.
From Solicitation posted on Jan 28, 2026The Veteran?s Administration has tasked the US Army Corps of Engineers Engineering and Support Center, Huntsville to initiate a Facility Reduction requirement at their Veteran?s Medical Center facility in Palo Alto, California. One building is considered excess to the center?s needs. The purpose of this contract is to procure Pre-demolition surveys according to the requirements set forth in this Performance Work Statement (PWS).The objective is to plan and complete the environmental sampling of a facility at the installation. The structure of concern is Building 54. The sampling will determine ACM and ORM materials and complete a Waste Stream Analysis for RCRA 8 metals, lead-based paint (LBP) and PCB?s-in-paint for those parts of the structure currently identified as potentially having any painted components. Following sampling, the Contractor shall be able to completely quantify the environmental contamination present and the methods required to remove and dispose of said contamination in a safe manner. All sampling shall be planned and performed in accordance with Federal, State, and local regulations for the installation. All recommendations for follow-on actions shall also be in accordance with Federal, State, and local regulations. Laboratory testing and analysis shall be completed within 35 workdays following the respective site sampling field activity completion. The results of the site investigation and sampling effort will be provided in an individual Pre-Demolition Assessment Report for the installation that will be submitted within 15 workdays following the receipt of sample results. The intent of this contract effort is to provide comprehensive sampling for all ACM/ORM materials to include the facility exterior, roof, basement/crawl spaces, etc. The Contractor shall make every reasonable effort to access these areas when present in each facility. The Report will specifically address any areas within given structures that were not accessible during the survey and state the size of the area not accessed, and current or immediate previous use of the area not sampled.Refer to the PWS and attached documents for requirement specifics.
From Solicitation posted on Feb 12, 2026The Veteran?s Administration has tasked the US Army Corps of Engineers Engineering and Support Center, Huntsville to initiate a Facility Reduction requirement at their Veteran?s Medical Center facility in Palo Alto, California. One building is considered excess to the center?s needs. The purpose of this contract is to procure Pre-demolition surveys according to the requirements set forth in this Performance Work Statement (PWS).The objective is to plan and complete the environmental sampling of a facility at the installation. The structure of concern is Building 54. The sampling will determine ACM and ORM materials and complete a Waste Stream Analysis for RCRA 8 metals, lead-based paint (LBP) and PCB?s-in-paint for those parts of the structure currently identified as potentially having any painted components. Following sampling, the Contractor shall be able to completely quantify the environmental contamination present and the methods required to remove and dispose of said contamination in a safe manner. All sampling shall be planned and performed in accordance with Federal, State, and local regulations for the installation. All recommendations for follow-on actions shall also be in accordance with Federal, State, and local regulations. Laboratory testing and analysis shall be completed within 35 workdays following the respective site sampling field activity completion. The results of the site investigation and sampling effort will be provided in an individual Pre-Demolition Assessment Report for the installation that will be submitted within 15 workdays following the receipt of sample results. The intent of this contract effort is to provide comprehensive sampling for all ACM/ORM materials to include the facility exterior, roof, basement/crawl spaces, etc. The Contractor shall make every reasonable effort to access these areas when present in each facility. The Report will specifically address any areas within given structures that were not accessible during the survey and state the size of the area not accessed, and current or immediate previous use of the area not sampled.Refer to the PWS and attached documents for requirement specifics.
From Solicitation posted on Feb 13, 2026The Veteran?s Administration has tasked the US Army Corps of Engineers Engineering and Support Center, Huntsville to initiate a Facility Reduction requirement at their Veteran?s Medical Center facility in Palo Alto, California. One building is considered excess to the center?s needs. The purpose of this contract is to procure Pre-demolition surveys according to the requirements set forth in this Performance Work Statement (PWS).The objective is to plan and complete the environmental sampling of a facility at the installation. The structure of concern is Building 54. The sampling will determine ACM and ORM materials and complete a Waste Stream Analysis for RCRA 8 metals, lead-based paint (LBP) and PCB?s-in-paint for those parts of the structure currently identified as potentially having any painted components. Following sampling, the Contractor shall be able to completely quantify the environmental contamination present and the methods required to remove and dispose of said contamination in a safe manner. All sampling shall be planned and performed in accordance with Federal, State, and local regulations for the installation. All recommendations for follow-on actions shall also be in accordance with Federal, State, and local regulations. Laboratory testing and analysis shall be completed within 35 workdays following the respective site sampling field activity completion. The results of the site investigation and sampling effort will be provided in an individual Pre-Demolition Assessment Report for the installation that will be submitted within 15 workdays following the receipt of sample results. The intent of this contract effort is to provide comprehensive sampling for all ACM/ORM materials to include the facility exterior, roof, basement/crawl spaces, etc. The Contractor shall make every reasonable effort to access these areas when present in each facility. The Report will specifically address any areas within given structures that were not accessible during the survey and state the size of the area not accessed, and current or immediate previous use of the area not sampled.Refer to the PWS and attached documents for requirement specifics.
From Solicitation posted on Feb 17, 2026Notice history
4-
-
Solicitation Posted Feb 13, 2026No changes from previous notice
-
Solicitation LATEST Posted Feb 17, 2026No changes from previous notice
Details
Award Information
Not yet awarded
Contacts
Phone