Contacts, documents and full notice history are available with a subscription.
Solicitation Expired 5 notices 2 documents

W912DW25R0018: Lake Washington Ship Canal Emergency Closure System W912DW25R0018

Solicitation W912DW25R0018 Copied Notice ID 34bd40619c084d06a8bb3629428df3d8 Copied DEPT OF DEFENSE — W071 ENDIST SEATTLE
SAM.gov
Posted
Jul 22, 2025
Deadline
Jul 23, 2025
Set-aside
None
NAICS
237990
PSC
Y1PZ

Summary

AI-generated · Aug 23, 2025

Install a new emergency closure system at the Hiram M. Chittenden Locks, Lake Washington Ship Canal, Seattle, WA. An emergency closure system is a closure structure plus all equipment necessary to install the structure in rapidly flowing water under differential head to prevent pool loss if the lock miter gates are damaged and can no longer function to control the pool.

Bidders should expect a series of amendments; the initial amendment extended the proposal due date, while subsequent amendments state the due date will not be extended further. Offerors must acknowledge receipt of each amendment by number and date with their proposal. No changes to the scope are noted in the amendments.

June 24, 2025-Amendment R0001-The following action was taking on June 24, 2025. The due date for the receipt of proposals is extended. Quotes are due 23 July 2025 at 10:00 AM Pacific Time. Please see the attached Amendment W912DW25R0018R0001. Offerors must acknowledge receipt of this amendment by number and date on offer. No further actions were taken on this updateThe purpose of this project is to install a new emergency closure system at the Hiram M. Chittenden Locks, Lake Washington Ship Canal, Seattle, WA. An emergency closure structure is any device designed to be placed in rapidly flowing water under differential head to prevent the loss of pool if the lock miter gates are damaged and can no longer function to control the pool. An emergency closure system consists of a closure structure and all the associated equipment necessary to install the closure structure in flowing water.

From Solicitation posted on Jun 25, 2025

July 11, 2025-Amendment R0002-The following action was taking on July 11, 2025. The due date for the receipt of proposals is NOT extended. Quotes are due 23 July 2025 at 10:00 AM Pacific Time. Please see the attached Amendment W912DW25R0018R0002. Offerors must acknowledge receipt of this amendment by number and date on offer. The purpose of this project is to install a new emergency closure system at the Hiram M. Chittenden Locks, Lake Washington Ship Canal, Seattle, WA. An emergency closure structure is any device designed to be placed in rapidly flowing water under differential head to prevent the loss of pool if the lock miter gates are damaged and can no longer function to control the pool. An emergency closure system consists of a closure structure and all the associated equipment necessary to install the closure structure in flowing water. *****June 24, 2025-Amendment R0001-The following action was taking on June 24, 2025. The due date for the receipt of proposals is extended. Quotes are due 23 July 2025 at 10:00 AM Pacific Time. Please see the attached Amendment W912DW25R0018R0001. Offerors must acknowledge receipt of this amendment by number and date on offer. No further actions were taken on this update. The purpose of this project is to install a new emergency closure system at the Hiram M. Chittenden Locks, Lake Washington Ship Canal, Seattle, WA. An emergency closure structure is any device designed to be placed in rapidly flowing water under differential head to prevent the loss of pool if the lock miter gates are damaged and can no longer function to control the pool. An emergency closure system consists of a closure structure and all the associated equipment necessary to install the closure structure in flowing water.

From Solicitation posted on Jul 11, 2025

*****July 15, 2025- Amendment R0003-The following action was taking on July 15, 2025. The due date for the receipt of proposals is NOT extended. Quotes are due 23 July 2025 at 10:00 AM Pacific Time. Please see the attached Amendment W912DW25R0018R0003. Offerors must acknowledge receipt of this amendment by number and date on offer. The purpose of this project is to install a new emergency closure system at the Hiram M. Chittenden Locks, Lake Washington Ship Canal, Seattle, WA. An emergency closure structure is any device designed to be placed in rapidly flowing water under differential head to prevent the loss of pool if the lock miter gates are damaged and can no longer function to control the pool. An emergency closure system consists of a closure structure and all the associated equipment necessary to install the closure structure in flowing water. ***** *****July 11, 2025- Amendment R0002-The following action was taking on July 11, 2025. The due date for the receipt of proposals is NOT extended. Quotes are due 23 July 2025 at 10:00 AM Pacific Time. Please see the attached Amendment W912DW25R0018R0002. Offerors must acknowledge receipt of this amendment by number and date on offer. The purpose of this project is to install a new emergency closure system at the Hiram M. Chittenden Locks, Lake Washington Ship Canal, Seattle, WA. An emergency closure structure is any device designed to be placed in rapidly flowing water under differential head to prevent the loss of pool if the lock miter gates are damaged and can no longer function to control the pool. An emergency closure system consists of a closure structure and all the associated equipment necessary to install the closure structure in flowing water. ***** *****June 24, 2025- Amendment R0001-The following action was taking on June 24, 2025. The due date for the receipt of proposals is extended. Quotes are due 23 July 2025 at 10:00 AM Pacific Time. Please see the attached Amendment W912DW25R0018R0001. Offerors must acknowledge receipt of this amendment by number and date on offer. No further actions were taken on this update. The purpose of this project is to install a new emergency closure system at the Hiram M. Chittenden Locks, Lake Washington Ship Canal, Seattle, WA. An emergency closure structure is any device designed to be placed in rapidly flowing water under differential head to prevent the loss of pool if the lock miter gates are damaged and can no longer function to control the pool. An emergency closure system consists of a closure structure and all the associated equipment necessary to install the closure structure in flowing water.

From Solicitation posted on Jul 15, 2025

*****July 17, 2025- Amendment R0004-The following action was taking on July 14, 2025. The due date for the receipt of proposals is NOT extended. Quotes are due 23 July 2025 at 10:00 AM Pacific Time. Please see the attached Amendment W912DW25R0018R0004. Offerors must acknowledge receipt of this amendment by number and date on offer. The purpose of this project is to install a new emergency closure system at the Hiram M. Chittenden Locks, Lake Washington Ship Canal, Seattle, WA. An emergency closure structure is any device designed to be placed in rapidly flowing water under differential head to prevent the loss of pool if the lock miter gates are damaged and can no longer function to control the pool. An emergency closure system consists of a closure structure and all the associated equipment necessary to install the closure structure in flowing water. ***** *****July 15, 2025- Amendment R0003-The following action was taking on July 15, 2025. The due date for the receipt of proposals is NOT extended. Quotes are due 23 July 2025 at 10:00 AM Pacific Time. Please see the attached Amendment W912DW25R0018R0003. Offerors must acknowledge receipt of this amendment by number and date on offer. The purpose of this project is to install a new emergency closure system at the Hiram M. Chittenden Locks, Lake Washington Ship Canal, Seattle, WA. An emergency closure structure is any device designed to be placed in rapidly flowing water under differential head to prevent the loss of pool if the lock miter gates are damaged and can no longer function to control the pool. An emergency closure system consists of a closure structure and all the associated equipment necessary to install the closure structure in flowing water. ***** *****July 11, 2025- Amendment R0002-The following action was taking on July 11, 2025. The due date for the receipt of proposals is NOT extended. Quotes are due 23 July 2025 at 10:00 AM Pacific Time. Please see the attached Amendment W912DW25R0018R0002. Offerors must acknowledge receipt of this amendment by number and date on offer. The purpose of this project is to install a new emergency closure system at the Hiram M. Chittenden Locks, Lake Washington Ship Canal, Seattle, WA. An emergency closure structure is any device designed to be placed in rapidly flowing water under differential head to prevent the loss of pool if the lock miter gates are damaged and can no longer function to control the pool. An emergency closure system consists of a closure structure and all the associated equipment necessary to install the closure structure in flowing water. ***** *****June 24, 2025- Amendment R0001-The following action was taking on June 24, 2025. The due date for the receipt of proposals is extended. Quotes are due 23 July 2025 at 10:00 AM Pacific Time. Please see the attached Amendment W912DW25R0018R0001. Offerors must acknowledge receipt of this amendment by number and date on offer. No further actions were taken on this update. The purpose of this project is to install a new emergency closure system at the Hiram M. Chittenden Locks, Lake Washington Ship Canal, Seattle, WA. An emergency closure structure is any device designed to be placed in rapidly flowing water under differential head to prevent the loss of pool if the lock miter gates are damaged and can no longer function to control the pool. An emergency closure system consists of a closure structure and all the associated equipment necessary to install the closure structure in flowing water.

From Solicitation posted on Jul 17, 2025

*****July 22, 2025- Amendment R0005-The following action was taking on July 22, 2025. The due date for the receipt of proposals is NOT extended. Quotes are due 23 July 2025 at 10:00 AM Pacific Time. Please see the attached Amendment W912DW25R0018R0005. Offerors must acknowledge receipt of this amendment by number and date on offer. The purpose of this project is to install a new emergency closure system at the Hiram M. Chittenden Locks, Lake Washington Ship Canal, Seattle, WA. An emergency closure structure is any device designed to be placed in rapidly flowing water under differential head to prevent the loss of pool if the lock miter gates are damaged and can no longer function to control the pool. An emergency closure system consists of a closure structure and all the associated equipment necessary to install the closure structure in flowing water. ***** *****July 17, 2025- Amendment R0004-The following action was taking on July 17, 2025. The due date for the receipt of proposals is NOT extended. Quotes are due 23 July 2025 at 10:00 AM Pacific Time. Please see the attached Amendment W912DW25R0018R0004. Offerors must acknowledge receipt of this amendment by number and date on offer. The purpose of this project is to install a new emergency closure system at the Hiram M. Chittenden Locks, Lake Washington Ship Canal, Seattle, WA. An emergency closure structure is any device designed to be placed in rapidly flowing water under differential head to prevent the loss of pool if the lock miter gates are damaged and can no longer function to control the pool. An emergency closure system consists of a closure structure and all the associated equipment necessary to install the closure structure in flowing water. ***** *****July 15, 2025- Amendment R0003-The following action was taking on July 15, 2025. The due date for the receipt of proposals is NOT extended. Quotes are due 23 July 2025 at 10:00 AM Pacific Time. Please see the attached Amendment W912DW25R0018R0003. Offerors must acknowledge receipt of this amendment by number and date on offer. The purpose of this project is to install a new emergency closure system at the Hiram M. Chittenden Locks, Lake Washington Ship Canal, Seattle, WA. An emergency closure structure is any device designed to be placed in rapidly flowing water under differential head to prevent the loss of pool if the lock miter gates are damaged and can no longer function to control the pool. An emergency closure system consists of a closure structure and all the associated equipment necessary to install the closure structure in flowing water. ***** *****July 11, 2025- Amendment R0002-The following action was taking on July 11, 2025. The due date for the receipt of proposals is NOT extended. Quotes are due 23 July 2025 at 10:00 AM Pacific Time. Please see the attached Amendment W912DW25R0018R0002. Offerors must acknowledge receipt of this amendment by number and date on offer. The purpose of this project is to install a new emergency closure system at the Hiram M. Chittenden Locks, Lake Washington Ship Canal, Seattle, WA. An emergency closure structure is any device designed to be placed in rapidly flowing water under differential head to prevent the loss of pool if the lock miter gates are damaged and can no longer function to control the pool. An emergency closure system consists of a closure structure and all the associated equipment necessary to install the closure structure in flowing water. ***** *****June 24, 2025- Amendment R0001-The following action was taking on June 24, 2025. The due date for the receipt of proposals is extended. Quotes are due 23 July 2025 at 10:00 AM Pacific Time. Please see the attached Amendment W912DW25R0018R0001. Offerors must acknowledge receipt of this amendment by number and date on offer. No further actions were taken on this update. The purpose of this project is to install a new emergency closure system at the Hiram M. Chittenden Locks, Lake Washington Ship Canal, Seattle, WA. An emergency closure structure is any device designed to be placed in rapidly flowing water under differential head to prevent the loss of pool if the lock miter gates are damaged and can no longer function to control the pool. An emergency closure system consists of a closure structure and all the associated equipment necessary to install the closure structure in flowing water.

From Solicitation posted on Jul 22, 2025

Notice history

5
  1. Solicitation Posted Jun 25, 2025 View
  2. Solicitation Posted Jul 11, 2025
    • Description: Description was updated
  3. Solicitation Posted Jul 15, 2025
    • Description: Description was updated
  4. Solicitation Posted Jul 17, 2025
    • Description: Description was updated
  5. Solicitation LATEST Posted Jul 22, 2025
    • Description: Description was updated

Details

Solicitation number W912DW25R0018
Notice ID 34bd40619c084d06a8bb3629428df3d8
Notice type Solicitation
Product / Service (PSC) Y1PZ
NAICS 237990
Place of performance Seattle, Washington
Archive date May 29, 2026

Award Information

Not yet awarded

Contacts

primary
Mckenna Rain

Email

Phone

secondary
Alex Marcinkiewicz

Email

Phone

Agency

DEPT OF DEFENSE
DEPT OF THE ARMY
US ARMY CORPS OF ENGINEERS
ENGINEER DIVISION NORTHWESTERN
W071 ENDIST SEATTLE

Place of Performance

Hiram M. Chittenden Locks, Hiram M. Chittenden, 3015 NW 54th St. Seattle, WA 98107
Seattle, Washington 98107
USA

Dates

Posted Jul 22, 2025 1 year ago
Last Updated Aug 06, 2026 1 day ago
Due Jul 23, 2025 1 year ago