Contacts, documents and full notice history are available with a subscription.
Solicitation SBA Expired 7 notices 11 documents

W9127N25BA010 Rogue River South Jetty Partial Repair 2025 W9127N25BA010

Solicitation W9127N25BA010 Copied Notice ID 02abbb34f8074f84a7aafb2a7d155f9d Copied DEPT OF DEFENSE — W071 ENDIST PORTLAND
SAM.gov
Posted
Sep 11, 2025
Deadline
Sep 11, 2025
Set-aside
SBA
NAICS
237990
PSC
Y1KZ

Summary

AI-generated · Aug 24, 2025

Procurement for Rogue River South Jetty Partial Repair requires competitive firm-fixed-price bids to procure, transport, and place jetty armor stone between stations 7+10 and 11+40 at the Rogue River inlet in Gold Beach, Oregon. Mandatory work repairs a channel-side damage zone from 8+50 to 9+50 with a 50-foot buffer on each side (about 200 feet of construction). Optional repairs add 90 feet on the channel side (7+60 to 8+50) and 140 feet on the ocean side (9+50 to 10+90). Because the core appears unstable and interlocking is lacking on the south cross-section, full cross-section rework or reconstruction may be required, potentially involving excavating the south toe and resetting stone. Design stone is specified as W50 (18 tons) with a minimum density of 170 pcf. The contract will be a single fixed-price contract under an Invitation for Bid, with priced options and evaluation based on price.

Changes across notices include a plan set loading issue reported with the initial posting (no scope change) and, in a later notice, addition of a Site Visit Roster attachment to support pre-bid site visits. Plans and specifications will be posted on beta.SAM.gov, and bidders must be registered in SAM prior to bid submission and award. The project is estimated to be in the $1–$5 million range.

The U.S. Army Corps of Engineer (USACE) Portland District intends to solicit construction firms who are interested in submitting a competitive firm-fixed-price proposal for this project. This PRESOLICITATION announcement is for the construction/modification of the Rogue River South Jetty located at the mouth of Rogue River at Gold Beach, Curry County, Oregon. Project Scope: The project is located on the Southern Oregon Coast at the inlet to Rogue River in Gold Beach, Curry County, Oregon. The project consists of procurement, delivery, and placement of jetty armor stone between stations 7+10 and 11+40. The mandatory work includes toe and side slope repairs to address a channel-side damage zone from station 8+50 to 9+50 with a 50-foot buffer on either side of the work area for a total construction length of approximately 200 ft. Optional repairs include an additional 90 ft of reconstruction on the channel side of the jetty from station 7+60 to 8+50 and 140 ft of reconstruction on the ocean side of the jetty from station 9+50 to 10+90. The 50-foot buffer will be adjusted to start at the ending station on each side of the full repair area, depending on whether optional work is exercised. Due to apparent instability of the core and lack of interlocking on the south side of the cross-section, rework and/or reconstruction of the full cross-section may be needed along at least a partial length of the mandatory repair zone. To accomplish that effectively, the toe of the jetty on the south side may need to be excavated and the stone/cross-section reset. Design stone W50 is 18 tons, with a minimum density of 170 pcf. Acquisition Strategy: The solicitation will be an Invitation for Bid (IFB). The lowest price and pricing factors only will be used to evaluate proposals. The Government will include options in the IFB which shall be priced. This acquisition will result in a single fixed-price contract. Magnitude of Construction: The estimated cost of the project is between $1,000,000.00 and $5,000,000.00 (Ref. FAR 36.204 Disclosure of Magnitude and DFARS 236.204 Disclosure of Magnitude). Set Asides and Codes: This is a Total Small Business Set-Aside. The North American Industrial Classification Code (NAICS) for this potential requirement would be 237990 Other Heavy and Civil Engineering Construction . The related size standard is $45.0 million. The PSC is Y1KZ Construction of other Conservations and Development Facilities. Bid Procedures: The solicitation will be posted on SAM.gov website once it is issued. Firms are requested to register electronically to receive a copy of the solicitation when it is issued. Bid Period: The solicitation is tentatively scheduled for release on or about 15 July 2025. The tentative date for receipt of proposals is on or about 29 August 2025. Plans and Specifications: The Plans and Specifications will also be posted on beta.SAM.gov website once it is issued. System for Award Management (SAM): Offerors must register in the SAM at https://www.sam.gov/portal/public/SAM/ prior to submission of bids and prior to receiving an award. Point of Contact: The USACE-NWP Contracting Office will be the sole point of contact for this action. E-mail responses to the Primary Point of Contact, Brian Johnson at brian.m.johnson@usace.army.mil. E-mail is the preferred method for receiving responses to this pre-solicitation notice. THIS PRE-SOLICITATION NOTICE IS FOR THE PURPOSE OF INFORMING INDUSTRY THAT THIS SOLICITATION WILL BE POSTED ON SAM.gov ON OR ABOUT 15 July 2025. THIS NOTICE IS NOT AN INVITATION FOR BIDS, AND ANY BIDS RECEIVED AS A RESULT OF THIS PRE-SOLICITATION NOTICE WILL NOT BE ACCEPTED OR EVALUATED. THE GOVERNMENT RESERVES THE RIGHT TO CANCEL THIS SOLICITATION EITHER BEFORE OR AFTER THE CLOSING DATE. NO REIMBURSEMENT WILL BE MADE FOR ANY COSTS ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO THIS PRESOLICITATION NOTICE OR ANY FOLLOW-UP INFORMATION REQUEST.

From Presolicitation posted on Jun 30, 2025

The U.S. Army Corps of Engineer (USACE) Portland District intends to solicit construction firms who are interested in submitting a competitive firm-fixed-price proposal for this project. This PRESOLICITATION announcement is for the construction/modification of the Rogue River South Jetty located at the mouth of Rogue River at Gold Beach, Curry County, Oregon. Project Scope: The project is located on the Southern Oregon Coast at the inlet to Rogue River in Gold Beach, Curry County, Oregon. The project consists of procurement, delivery, and placement of jetty armor stone between stations 7+10 and 11+40. The mandatory work includes toe and side slope repairs to address a channel-side damage zone from station 8+50 to 9+50 with a 50-foot buffer on either side of the work area for a total construction length of approximately 200 ft. Optional repairs include an additional 90 ft of reconstruction on the channel side of the jetty from station 7+60 to 8+50 and 140 ft of reconstruction on the ocean side of the jetty from station 9+50 to 10+90. The 50-foot buffer will be adjusted to start at the ending station on each side of the full repair area, depending on whether optional work is exercised. Due to apparent instability of the core and lack of interlocking on the south side of the cross-section, rework and/or reconstruction of the full cross-section may be needed along at least a partial length of the mandatory repair zone. To accomplish that effectively, the toe of the jetty on the south side may need to be excavated and the stone/cross-section reset. Design stone W50 is 18 tons, with a minimum density of 170 pcf. Acquisition Strategy: The solicitation will be an Invitation for Bid (IFB). The lowest price and pricing factors only will be used to evaluate proposals. The Government will include options in the IFB which shall be priced. This acquisition will result in a single fixed-price contract. Magnitude of Construction: The estimated cost of the project is between $1,000,000.00 and $5,000,000.00 (Ref. FAR 36.204 Disclosure of Magnitude and DFARS 236.204 Disclosure of Magnitude). Set Asides and Codes: This is a Total Small Business Set-Aside. The North American Industrial Classification Code (NAICS) for this potential requirement would be 237990 Other Heavy and Civil Engineering Construction . The related size standard is $45.0 million. The PSC is Y1KZ Construction of other Conservations and Development Facilities. Bid Procedures: The solicitation will be posted on SAM.gov website once it is issued. Firms are requested to register electronically to receive a copy of the solicitation when it is issued. Bid Period: The solicitation is tentatively scheduled for release on or about 7 August 2025. The tentative date for receipt of proposals is on or about 22 September 2025. Plans and Specifications: The Plans and Specifications will also be posted on beta.SAM.gov website once it is issued. System for Award Management (SAM): Offerors must register in the SAM at https://www.sam.gov/portal/public/SAM/ prior to submission of bids and prior to receiving an award. Point of Contact: The USACE-NWP Contracting Office will be the sole point of contact for this action. E-mail responses to the Primary Point of Contact, Brian Johnson at brian.m.johnson@usace.army.mil. E-mail is the preferred method for receiving responses to this pre-solicitation notice. THIS PRE-SOLICITATION NOTICE IS FOR THE PURPOSE OF INFORMING INDUSTRY THAT THIS SOLICITATION WILL BE POSTED ON SAM.gov ON OR ABOUT 7 AUGUST 2025. THIS NOTICE IS NOT AN INVITATION FOR BIDS, AND ANY BIDS RECEIVED AS A RESULT OF THIS PRE-SOLICITATION NOTICE WILL NOT BE ACCEPTED OR EVALUATED. THE GOVERNMENT RESERVES THE RIGHT TO CANCEL THIS SOLICITATION EITHER BEFORE OR AFTER THE CLOSING DATE. NO REIMBURSEMENT WILL BE MADE FOR ANY COSTS ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO THIS PRESOLICITATION NOTICE OR ANY FOLLOW-UP INFORMATION REQUEST.

From Presolicitation posted on Jul 14, 2025

11AUG2025: Plan Set did not load with orginal posting. No other changes. Solicitation Notice W9127N25BA010 Rogue River South Jetty Partial Repair 2025 The project is located on the Southern Oregon Coast at the inlet to Rogue River in Gold Beach, Curry County, Oregon. The project consists of procurement, delivery, and placement of jetty armor stone this includes toe and side slope repairs with a 50-foot buffer on either side of the work area. Optional repairs include reconstruction on the channel side of the jetty and on the ocean side of the. The 50-foot buffer will be adjusted to start at the ending station on each side of the full repair area, depending on whether optional work is exercised. Rework and/or reconstruction of the full cross-section may be needed along at least a partial length of the mandatory repair zone. This solicitation will be an Invitation for Bid (IFB). The lowest price and pricing factors only will be used to evaluate proposals. This acquisition will result in a single fixed-price contract. The North American Industrial Classification Code (NAICS) for this potential requirement would be 237990 Other Heavy and Civil Engineering Construction . The related size standard is $45.0 million. The PSC is Y1KZ Construction of other Conservations and Development Facilities. Point of Contact: The USACE-NWP Contracting Office will be the sole point of contact for this action. E-mail responses to the Primary Point of Contact, Brian Johnson at brian.m.johnson@usace.army.mil. E-mail is the preferred method for receiving responses to this Solicitation. THE GOVERNMENT RESERVES THE RIGHT TO CANCEL THIS SOLICITATION EITHER BEFORE OR AFTER THE CLOSING DATE. NO REIMBURSEMENT WILL BE MADE FOR ANY COSTS ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO THIS SOLICITATION OR ANY FOLLOW-UP INFORMATION REQUESTS.

From Solicitation posted on Aug 11, 2025

22AUG25: Adding the Site Visit Roster to the attachments. No other changes. 11AUG2025: Plan Set did not load with orginal posting. No other changes. Solicitation Notice W9127N25BA010 Rogue River South Jetty Partial Repair 2025 The project is located on the Southern Oregon Coast at the inlet to Rogue River in Gold Beach, Curry County, Oregon. The project consists of procurement, delivery, and placement of jetty armor stone this includes toe and side slope repairs with a 50-foot buffer on either side of the work area. Optional repairs include reconstruction on the channel side of the jetty and on the ocean side of the. The 50-foot buffer will be adjusted to start at the ending station on each side of the full repair area, depending on whether optional work is exercised. Rework and/or reconstruction of the full cross-section may be needed along at least a partial length of the mandatory repair zone. This solicitation will be an Invitation for Bid (IFB). The lowest price and pricing factors only will be used to evaluate proposals. This acquisition will result in a single fixed-price contract. The North American Industrial Classification Code (NAICS) for this potential requirement would be 237990 Other Heavy and Civil Engineering Construction . The related size standard is $45.0 million. The PSC is Y1KZ Construction of other Conservations and Development Facilities. Point of Contact: The USACE-NWP Contracting Office will be the sole point of contact for this action. E-mail responses to the Primary Point of Contact, Brian Johnson at brian.m.johnson@usace.army.mil. E-mail is the preferred method for receiving responses to this Solicitation. THE GOVERNMENT RESERVES THE RIGHT TO CANCEL THIS SOLICITATION EITHER BEFORE OR AFTER THE CLOSING DATE. NO REIMBURSEMENT WILL BE MADE FOR ANY COSTS ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO THIS SOLICITATION OR ANY FOLLOW-UP INFORMATION REQUESTS.

From Solicitation posted on Aug 22, 2025

27AUG25: Addition of Amendment W9127N25BA010 0001 (See Attachment). This amendment updates the wage determination to OR20250065 Dated 22AUG25 and to adds clause: DFARS 252.232-7003 No other changes. 22AUG25: Adding the Site Visit Roster to the attachments. No other changes. 11AUG2025: Plan Set did not load with orginal posting. No other changes. Solicitation Notice W9127N25BA010 Rogue River South Jetty Partial Repair 2025 The project is located on the Southern Oregon Coast at the inlet to Rogue River in Gold Beach, Curry County, Oregon. The project consists of procurement, delivery, and placement of jetty armor stone this includes toe and side slope repairs with a 50-foot buffer on either side of the work area. Optional repairs include reconstruction on the channel side of the jetty and on the ocean side of the. The 50-foot buffer will be adjusted to start at the ending station on each side of the full repair area, depending on whether optional work is exercised. Rework and/or reconstruction of the full cross-section may be needed along at least a partial length of the mandatory repair zone. This solicitation will be an Invitation for Bid (IFB). The lowest price and pricing factors only will be used to evaluate proposals. This acquisition will result in a single fixed-price contract. The North American Industrial Classification Code (NAICS) for this potential requirement would be 237990 Other Heavy and Civil Engineering Construction . The related size standard is $45.0 million. The PSC is Y1KZ Construction of other Conservations and Development Facilities. Point of Contact: The USACE-NWP Contracting Office will be the sole point of contact for this action. E-mail responses to the Primary Point of Contact, Brian Johnson at brian.m.johnson@usace.army.mil. E-mail is the preferred method for receiving responses to this Solicitation. THE GOVERNMENT RESERVES THE RIGHT TO CANCEL THIS SOLICITATION EITHER BEFORE OR AFTER THE CLOSING DATE. NO REIMBURSEMENT WILL BE MADE FOR ANY COSTS ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO THIS SOLICITATION OR ANY FOLLOW-UP INFORMATION REQUESTS.

From Solicitation posted on Aug 27, 2025

04SEP25: Addition of Amendment W9127N25BA010 0002 Updated Plan Sheets G-004 and LS 101 Bidder Inquiry Question and Answers WD 20250065 Dated 28AUG25 Update Offer Due date from 0300 PM on 11SEP25 to 0:200 PM on 11SEP25. Bid Opening remains at 0:300 11SEP25. 27AUG25: Addition of Amendment W9127N25BA010 0001 (See Attachment). This amendment updates the wage determination to OR20250065 Dated 22AUG25 and to adds clause: DFARS 252.232-7003 No other changes. 22AUG25: Adding the Site Visit Roster to the attachments. No other changes. 11AUG2025: Plan Set did not load with orginal posting. No other changes. Solicitation Notice W9127N25BA010 Rogue River South Jetty Partial Repair 2025 The project is located on the Southern Oregon Coast at the inlet to Rogue River in Gold Beach, Curry County, Oregon. The project consists of procurement, delivery, and placement of jetty armor stone this includes toe and side slope repairs with a 50-foot buffer on either side of the work area. Optional repairs include reconstruction on the channel side of the jetty and on the ocean side of the. The 50-foot buffer will be adjusted to start at the ending station on each side of the full repair area, depending on whether optional work is exercised. Rework and/or reconstruction of the full cross-section may be needed along at least a partial length of the mandatory repair zone. This solicitation will be an Invitation for Bid (IFB). The lowest price and pricing factors only will be used to evaluate proposals. This acquisition will result in a single fixed-price contract. The North American Industrial Classification Code (NAICS) for this potential requirement would be 237990 Other Heavy and Civil Engineering Construction . The related size standard is $45.0 million. The PSC is Y1KZ Construction of other Conservations and Development Facilities. Point of Contact: The USACE-NWP Contracting Office will be the sole point of contact for this action. E-mail responses to the Primary Point of Contact, Brian Johnson at brian.m.johnson@usace.army.mil. E-mail is the preferred method for receiving responses to this Solicitation. THE GOVERNMENT RESERVES THE RIGHT TO CANCEL THIS SOLICITATION EITHER BEFORE OR AFTER THE CLOSING DATE. NO REIMBURSEMENT WILL BE MADE FOR ANY COSTS ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO THIS SOLICITATION OR ANY FOLLOW-UP INFORMATION REQUESTS.

From Solicitation posted on Sep 04, 2025

11SEP25: Addition of Bid Abstract - Sam - W9127N25BA010 Rogue River South Jetty Partial Repair 2025 04SEP25: Addition of Amendment W9127N25BA010 0002 Updated Plan Sheets G-004 and LS 101 Bidder Inquiry Question and Answers WD 20250065 Dated 28AUG25 Update Offer Due date from 0300 PM on 11SEP25 to 0:200 PM on 11SEP25. Bid Opening remains at 0:300 11SEP25. 27AUG25: Addition of Amendment W9127N25BA010 0001 (See Attachment). This amendment updates the wage determination to OR20250065 Dated 22AUG25 and to adds clause: DFARS 252.232-7003 No other changes. 22AUG25: Adding the Site Visit Roster to the attachments. No other changes. 11AUG2025: Plan Set did not load with orginal posting. No other changes. Solicitation Notice W9127N25BA010 Rogue River South Jetty Partial Repair 2025 The project is located on the Southern Oregon Coast at the inlet to Rogue River in Gold Beach, Curry County, Oregon. The project consists of procurement, delivery, and placement of jetty armor stone this includes toe and side slope repairs with a 50-foot buffer on either side of the work area. Optional repairs include reconstruction on the channel side of the jetty and on the ocean side of the. The 50-foot buffer will be adjusted to start at the ending station on each side of the full repair area, depending on whether optional work is exercised. Rework and/or reconstruction of the full cross-section may be needed along at least a partial length of the mandatory repair zone. This solicitation will be an Invitation for Bid (IFB). The lowest price and pricing factors only will be used to evaluate proposals. This acquisition will result in a single fixed-price contract. The North American Industrial Classification Code (NAICS) for this potential requirement would be 237990 Other Heavy and Civil Engineering Construction . The related size standard is $45.0 million. The PSC is Y1KZ Construction of other Conservations and Development Facilities. Point of Contact: The USACE-NWP Contracting Office will be the sole point of contact for this action. E-mail responses to the Primary Point of Contact, Brian Johnson at brian.m.johnson@usace.army.mil. E-mail is the preferred method for receiving responses to this Solicitation. THE GOVERNMENT RESERVES THE RIGHT TO CANCEL THIS SOLICITATION EITHER BEFORE OR AFTER THE CLOSING DATE. NO REIMBURSEMENT WILL BE MADE FOR ANY COSTS ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO THIS SOLICITATION OR ANY FOLLOW-UP INFORMATION REQUESTS.

From Solicitation posted on Sep 11, 2025

Notice history

7
  1. Presolicitation Posted Jun 30, 2025 View
  2. Presolicitation Posted Jul 14, 2025
    • Description: Description was updated
    • Response Deadline: Jul 15, 2025Aug 07, 2025
  3. Solicitation Posted Aug 11, 2025
    • Description: Description was updated
    • Notice Type: PresolicitationSolicitation
    • Response Deadline: Aug 07, 2025Sep 11, 2025
  4. Solicitation Posted Aug 22, 2025
    • Description: Description was updated
  5. Solicitation Posted Aug 27, 2025
    • Description: Description was updated
  6. Solicitation Posted Sep 04, 2025
    • Description: Description was updated
  7. Solicitation LATEST Posted Sep 11, 2025
    • Description: Description was updated

Details

Solicitation number W9127N25BA010
Notice ID 02abbb34f8074f84a7aafb2a7d155f9d
Notice type Solicitation
Product / Service (PSC) Y1KZ
NAICS 237990
Place of performance Gold Beach, Oregon
Archive date Sep 26, 2025

Award Information

Not yet awarded

Contacts

primary
Brian Johnson

Email

Phone

secondary
Christopher Burroughs

Email

Agency

DEPT OF DEFENSE
DEPT OF THE ARMY
US ARMY CORPS OF ENGINEERS
ENGINEER DIVISION NORTHWESTERN
W071 ENDIST PORTLAND

Place of Performance

Gold Beach, Oregon
USA

Dates

Posted Sep 11, 2025 10 months ago
Last Updated Aug 06, 2026 2 days ago
Due Sep 11, 2025 10 months ago