AI-generated · Aug 24, 2025Provide all labor, equipment, and materials to drain boiler (estimated 3,000 gallons) and chiller (estimated 2,000 gallons) closed-loop systems, flush the systems using a power flush product, refill with 30% propylene glycol, fill the feeder/hopper with propylene, and perform testing and balancing on pumps in the Mechanical Room, Building 407, Maintenance Group, West Virginia Air National Guard at McLaughlin Air National Guard Base.
Amendment 0002 updates the Statement of Work by removing old language from a previous project; Amendment 0001 revises the Davis-Bacon wage determination to a newer version. An SF30 for Amendment 0002 was uploaded along with the Q&A.
Update: Uploaded SF30 for Solicitation Amendment 0002 along with the Q&A. Solicitation Amendment 0002 - posted to update the SOW to remove old language from a previous project. Solicitation Amendment 0001 - posted to update the Davis Bacon Wage from WV20250038 DATED 05/30/2025 TO WV20250038 DATED 06/06/2025 through the solicitation. The proposed work on this project consists of providing all labor, equipment, and materials to drain boiler (estimated 3,000 gal) and chiller (estimated 2,000 gal) closed looped systems, flush system using power flush product, refill systems with 30% propylene glycol, fill feeder/hopper with propylene, and perform testing and balancing on pumps at Mechanical Room, Building 407, Maintenance Group of The West Virginia Air National Guard (ANG) at McLaughlin Air National Guard Base. Please see attached Solicitation and Statement of Work for additional details.
From Solicitation posted on Jun 24, 2025Update: Uploaded SF30 for Solicitation Amendment 0002 along with the Q&A. Solicitation Amendment 0002 - posted to update the SOW to remove old language from a previous project. Solicitation Amendment 0001 - posted to update the Davis Bacon Wage from WV20250038 DATED 05/30/2025 TO WV20250038 DATED 06/06/2025 through the solicitation. The proposed work on this project consists of providing all labor, equipment, and materials to drain boiler (estimated 3,000 gal) and chiller (estimated 2,000 gal) closed looped systems, flush system using power flush product, refill systems with 30% propylene glycol, fill feeder/hopper with propylene, and perform testing and balancing on pumps at Mechanical Room, Building 407, Maintenance Group of The West Virginia Air National Guard (ANG) at McLaughlin Air National Guard Base. Please see attached Solicitation and Statement of Work for additional details.
From Solicitation posted on Jul 02, 2025Notice history
2-
-
Solicitation LATEST Posted Jul 02, 2025No changes from previous notice
Details
Award Information
Not yet awarded
Documents
7Contacts
Phone
3043416076
Phone
3043416076
Agency
Place of Performance
USA