Contacts, documents and full notice history are available with a subscription.
Solicitation SBA Expired 1 notice 4 documents

VY-MISSISQUOI NWR-PARKING LOT MAINT 140FC226Q0036

Solicitation 140FC226Q0036 Copied Notice ID ada0aef79690493fa360f1b81cfb6726 Copied INTERIOR, DEPARTMENT OF THE — FWS, CONSTRUCTION A/E TEAM 2
SAM.gov
Posted
Jun 10, 2026
Deadline
Jul 03, 2026
Set-aside
SBA
NAICS
237310
PSC
Z1LZ

Summary

AI-generated · Jun 11, 2026

Maintain the approximately 1.0-acre asphalt parking lot at the Missisquoi NWR visitor center and staff parking area to prevent further degradation and restore visibility of the striping. The lot, built in 2006 with last maintenance in 2019, has cracks from freeze-thaw cycles and worn striping. Required work includes cleaning and preparing the surface for seal coating, crack filling with hot rubberized filler, applying one coat of commercial-grade asphalt sealer to the entire surface, re-striping all parking areas to match the existing layout, and providing traffic-management supplies (cones, sawhorses, etc.) to direct visitors to a separate parking area at the refuge shop facility, plus any other requirements outlined in the Scope of Work.

Site visit is scheduled for June 23, 2026 at 10:00 AM EDT. Questions are due by June 24, 2026 at 3:00 PM EDT, and bids are due by July 3, 2026 at 3:00 PM EDT.

VY-MISSISQUOI NWR-PARKING LOT MAINT The Missisquoi NWR requires its visitors center and staff parking lot asphalt surface to be maintained to prevent degradation and improve striping visibility. The ~1.0 acre asphalt parking lot was created when the new refuge office and visitor's center was built in 2006. Maintenance was completed in 2019. Since then, cold winters with freeze-thaw conditions and regular wear and tear have created cracks in the asphalt surface and worn away the parking lot striping on the surface. To prevent continued degradation the refuge requires the asphalt to be sealed, cracks filled and striping reapplied. The work to be completed will be to the ~1.0 acre visitor's center and refuge staff parking lot. The following work will be accomplished: 1. Clean and prepare the entire asphalt surface to be seal coated. 2. Crack fill any cracks as needed with hot rubberized crack filler. 3. Apply one coat of commercial grade asphalt sealer to the entire asphalt surface. 4. Re-stripe all paring areas to match existing layout. 5. Provide cones, sawhorses or other traffic management supplies to direct visitor's to separate parking area at refuge shop facility And other requirements as defined by the attached Scope of Work. Site Visit: June 23,2026, at 10:00 AM EDT. POC: Chris Whitaker, christopher_whitaker@fws.gov, or (802)868-4781 Questions Due: June 24, 2026 at 3:00 PM EDT, to Bill Koski, Contract Specialist, william_koski@ios.doi.gov Quotes Due: July 3, 2026 at 3:00 PM EDT, to Bill Koski, Contract Specialist, william_koski@ios.doi.gov

From Solicitation posted on Jun 10, 2026

Notice history

1
  1. Solicitation LATEST Posted Jun 10, 2026

Details

Solicitation number 140FC226Q0036
Notice ID ada0aef79690493fa360f1b81cfb6726
Notice type Solicitation
Product / Service (PSC) Z1LZ
NAICS 237310
Archive date Jul 18, 2026

Award Information

Not yet awarded

Contacts

primary
Koski, William

Email

Agency

INTERIOR, DEPARTMENT OF THE
US FISH AND WILDLIFE SERVICE
FWS, CONSTRUCTION A/E TEAM 2

Place of Performance

Dates

Posted Jun 10, 2026 1 month ago
Last Updated Aug 06, 2026 2 days ago
Due Jul 03, 2026 1 month ago