VJ Tech Computed Tomography System Preventative Maintenance FA812626Q0029
Summary
AI-generated · Mar 27, 2026Provide all labor, tools, equipment, test equipment, materials, parts, quality control, transportation, and inspection manuals necessary to perform preventive maintenance (PM) on the VJ Tech Computed Tomography System, in accordance with the performance work statement. Perform four (4) PM visits per year on the equipment listed in Appendix A.
The Contractor shall provide all labor, tools, equipment, test equipment, material, parts, quality control, transportation and inspection manuals necessary to perform preventative maintenance (PM) for the VJ Tech Computed Tomography System in accordance with the performance work statement (PWS). The Contractor shall perform four (4) PM per year on the equipment listed within the Appendix A.
From Combined Synopsis/Solicitation posted on Mar 26, 2026Notice history
1-
Combined Synopsis/Solicitation LATEST Posted Mar 26, 2026
Details
Award Information
Not yet awarded
Contacts
Agency
Place of Performance
USA