VGLZ199555 Repair Fire Station Foundation Bldg. 859 - Selfridge ANGB W50S8525BA006
Summary
AI-generated · Aug 24, 2025Repair of the northern section of Building 859 at Selfridge ANGB to address long-standing settlement, including repair of the floor slab and associated architectural, plumbing, and structural systems, plus replacement of permanently damaged materials. The south portion housing the firefighting apparatus is excluded from any repair designs. Finishes must match existing materials; no new color or material palette is to be selected.
Amendments introduce updates to wage determinations, add RFIs, and modify the drawing package; bidders must acknowledge amendments with their bid package. The bid due date has been adjusted, RFIs from submissions are incorporated, a Bid Abstract for bid opening has been added, and two documents that were not previously transferred from the PI EE module have been included.
The floor slab in the northern part of the building has been settling since the completion of construction in 2001 and continues to settle. These settlements have caused cracks to develop in the floor slabs, as well as in the non-load-bearing masonry wall, resulting in numerous problems as follows: uneven and out of level floors; trip hazards at doorways due to differential settlement up to one inch between doorways and the floor slabs; cracks in the non-load-bearing masonry walls and lintels at the doorways, causing misaligned door frames; horizontal and vertical cracks in the non-load-bearing masonry walls; vertical cracks in non-load-bearing walls at their junctions with load-bearing masonry walls; out of alignment and cracking of restroom area tiles; and miscellaneous cracking of drywall partitions. The scope of this project is the repair of the existing system architectural, plumbing, and structural systems and replacement of permanently damaged materials. The south portion of the building, which contains the firefighting apparatus, has not been compromised and will not be included in any repair designs. Finishes will match existing/original finish and material selections in the affected areas, and design or selection of a new color/material palette is not part of the scope.
From Solicitation posted on Jul 03, 2025The floor slab in the northern part of the building has been settling since the completion of construction in 2001 and continues to settle. These settlements have caused cracks to develop in the floor slabs, as well as in the non-load-bearing masonry wall, resulting in numerous problems as follows: uneven and out of level floors; trip hazards at doorways due to differential settlement up to one inch between doorways and the floor slabs; cracks in the non-load-bearing masonry walls and lintels at the doorways, causing misaligned door frames; horizontal and vertical cracks in the non-load-bearing masonry walls; vertical cracks in non-load-bearing walls at their junctions with load-bearing masonry walls; out of alignment and cracking of restroom area tiles; and miscellaneous cracking of drywall partitions. The scope of this project is the repair of the existing system architectural, plumbing, and structural systems and replacement of permanently damaged materials. The south portion of the building, which contains the firefighting apparatus, has not been compromised and will not be included in any repair designs. Finishes will match existing/original finish and material selections in the affected areas, and design or selection of a new color/material palette is not part of the scope.
From Solicitation posted on Jul 18, 202529 JULY 2025 UPDATE - AMENDMENT 0001 incorporates the recent Wage Determination update, adds in RFIs, and changes to the drawing package. OFFERORS MUST ACKNOWLEDGE AMENDMENTS WITH BID PACKAGE. The floor slab in the northern part of the building has been settling since the completion of construction in 2001 and continues to settle. These settlements have caused cracks to develop in the floor slabs, as well as in the non-load-bearing masonry wall, resulting in numerous problems as follows: uneven and out of level floors; trip hazards at doorways due to differential settlement up to one inch between doorways and the floor slabs; cracks in the non-load-bearing masonry walls and lintels at the doorways, causing misaligned door frames; horizontal and vertical cracks in the non-load-bearing masonry walls; vertical cracks in non-load-bearing walls at their junctions with load-bearing masonry walls; out of alignment and cracking of restroom area tiles; and miscellaneous cracking of drywall partitions. The scope of this project is the repair of the existing system architectural, plumbing, and structural systems and replacement of permanently damaged materials. The south portion of the building, which contains the firefighting apparatus, has not been compromised and will not be included in any repair designs. Finishes will match existing/original finish and material selections in the affected areas, and design or selection of a new color/material palette is not part of the scope.
From Solicitation posted on Jul 29, 20255 AUGUST 2025 3:35pm UPDATE - AMENDMENT 0002 This update changes the bid due date to Friday August 8th 2025 at 0900 EDT. This update also includes updated RFIs from August 8th submissions. Please see RFI document attached. 29 JULY 2025 UPDATE - AMENDMENT 0001 incorporates the recent Wage Determination update, adds in RFIs, and changes to the drawing package. OFFERORS MUST ACKNOWLEDGE AMENDMENTS WITH BID PACKAGE. The floor slab in the northern part of the building has been settling since the completion of construction in 2001 and continues to settle. These settlements have caused cracks to develop in the floor slabs, as well as in the non-load-bearing masonry wall, resulting in numerous problems as follows: uneven and out of level floors; trip hazards at doorways due to differential settlement up to one inch between doorways and the floor slabs; cracks in the non-load-bearing masonry walls and lintels at the doorways, causing misaligned door frames; horizontal and vertical cracks in the non-load-bearing masonry walls; vertical cracks in non-load-bearing walls at their junctions with load-bearing masonry walls; out of alignment and cracking of restroom area tiles; and miscellaneous cracking of drywall partitions. The scope of this project is the repair of the existing system architectural, plumbing, and structural systems and replacement of permanently damaged materials. The south portion of the building, which contains the firefighting apparatus, has not been compromised and will not be included in any repair designs. Finishes will match existing/original finish and material selections in the affected areas, and design or selection of a new color/material palette is not part of the scope.
From Solicitation posted on Aug 05, 20258 August 2025 UPDATE - This update adds in the Bid Abstract from August 8th 9:00am bid opening. 5 August 2025 Cont. Two additional documents have been added that did not transfer from the PIEE solicitation module. These should have been included during the 3:35pm update. 5 AUGUST 2025 3:35pm UPDATE - AMENDMENT 0002 This update changes the bid due date to Friday August 8th 2025 at 0900 EDT. This update also includes updated RFIs from August 8th submissions. Please see RFI document attached. 29 JULY 2025 UPDATE - AMENDMENT 0001 incorporates the recent Wage Determination update, adds in RFIs, and changes to the drawing package. OFFERORS MUST ACKNOWLEDGE AMENDMENTS WITH BID PACKAGE. The floor slab in the northern part of the building has been settling since the completion of construction in 2001 and continues to settle. These settlements have caused cracks to develop in the floor slabs, as well as in the non-load-bearing masonry wall, resulting in numerous problems as follows: uneven and out of level floors; trip hazards at doorways due to differential settlement up to one inch between doorways and the floor slabs; cracks in the non-load-bearing masonry walls and lintels at the doorways, causing misaligned door frames; horizontal and vertical cracks in the non-load-bearing masonry walls; vertical cracks in non-load-bearing walls at their junctions with load-bearing masonry walls; out of alignment and cracking of restroom area tiles; and miscellaneous cracking of drywall partitions. The scope of this project is the repair of the existing system architectural, plumbing, and structural systems and replacement of permanently damaged materials. The south portion of the building, which contains the firefighting apparatus, has not been compromised and will not be included in any repair designs. Finishes will match existing/original finish and material selections in the affected areas, and design or selection of a new color/material palette is not part of the scope.
From Solicitation posted on Aug 08, 2025Notice history
5-
Solicitation Posted Jul 03, 2025
-
Solicitation Posted Jul 18, 2025No changes from previous notice
-
Solicitation Posted Aug 05, 2025View changes (2)
- Description: Description was updated
- Response Deadline: Aug 05, 2025 → Aug 08, 2025
Details
Award Information
Not yet awarded