AI-generated · Aug 24, 2025Replace existing heating boiler systems in Building 105 at the Selfridge Air National Guard Base, Harrison Twp. MI. Schedule and perform the construction to provide complete and operable boiler systems, with high-efficiency condensing boilers featuring stainless steel heat exchangers, in accordance with The Selfridge ANG Base Design Standards. The installation shall include all piping connections, combustion air and venting, power connections, boiler pumps, hot water pumps, and system startup and validation. The new pumps and boilers will operate on a lead/lag loop, which may require piping changes from the existing configuration.
Amendment 0001 updates wage determination, RFIs, and drawings posted July 24, 2025; bidders must acknowledge amendments with the bid package. Bid Abstract was posted August 4, 2025.
The contractor shall schedule and perform a construction task for the replacement ofthe existing heating boiler systems in Building 105 at the Selfridge Air National Guard Base, Harrison Twp. MI. The Contractor will providecomplete and operable boiler systems at Building 105. The replacement boilers shall be high efficiency condensing boilers with stainless steel heatexchangers. The offered boilers shall be in accordance with The Selfridge ANG Base Design Standards. The installation and replacement shallinclude but is not limited to all piping connections, combustion air and venting, power connections, boiler pumps, hot water pumps, and system startupand validation. These new pumps and boilers will operate on a loop with the lead / lag configuration which may require some piping changes fromthe existing configuration
From Solicitation posted on Jun 24, 2025The contractor shall schedule and perform a construction task for the replacement ofthe existing heating boiler systems in Building 105 at the Selfridge Air National Guard Base, Harrison Twp. MI. The Contractor will providecomplete and operable boiler systems at Building 105. The replacement boilers shall be high efficiency condensing boilers with stainless steel heatexchangers. The offered boilers shall be in accordance with The Selfridge ANG Base Design Standards. The installation and replacement shallinclude but is not limited to all piping connections, combustion air and venting, power connections, boiler pumps, hot water pumps, and system startupand validation. These new pumps and boilers will operate on a loop with the lead / lag configuration which may require some piping changes fromthe existing configuration
From Solicitation posted on Jul 16, 2025The contractor shall schedule and perform a construction task for the replacement ofthe existing heating boiler systems in Building 105 at the Selfridge Air National Guard Base, Harrison Twp. MI. The Contractor will providecomplete and operable boiler systems at Building 105. The replacement boilers shall be high efficiency condensing boilers with stainless steel heatexchangers. The offered boilers shall be in accordance with The Selfridge ANG Base Design Standards. The installation and replacement shallinclude but is not limited to all piping connections, combustion air and venting, power connections, boiler pumps, hot water pumps, and system startupand validation. These new pumps and boilers will operate on a loop with the lead / lag configuration which may require some piping changes fromthe existing configuration
From Solicitation posted on Jul 24, 202529 JULY 2025 UPDATE - AMENDMENT 0001 incorporates the recent Wage Determination update, RFIs, and drawing updates, that were posted on 24 July 2025. OFFERORS MUST ACKNOWLEDGE AMENDMENTS WITH BID PACKAGE. The contractor shall schedule and perform a construction task for the replacement of the existing heating boiler systems in Building 105 at the Selfridge Air National Guard Base, Harrison Twp. MI. The Contractor will provide complete and operable boiler systems at Building 105. The replacement boilers shall be high efficiency condensing boilers with stainless steel heat exchangers. The offered boilers shall be in accordance with The Selfridge ANG Base Design Standards. The installation and replacement shall include but is not limited to all piping connections, combustion air and venting, power connections, boiler pumps, hot water pumps, and system startup and validation. These new pumps and boilers will operate on a loop with the lead / lag configuration which may require some piping changes from the existing configuration.
From Solicitation posted on Jul 29, 202504 August 2025 UPDATE - Bid Abstract posted (reference Attachments section). 29 JULY 2025 UPDATE - AMENDMENT 0001 incorporates the recent Wage Determination update, RFIs, and drawing updates, that were posted on 24 July 2025. OFFERORS MUST ACKNOWLEDGE AMENDMENTS WITH BID PACKAGE. The contractor shall schedule and perform a construction task for the replacement of the existing heating boiler systems in Building 105 at the Selfridge Air National Guard Base, Harrison Twp. MI. The Contractor will provide complete and operable boiler systems at Building 105. The replacement boilers shall be high efficiency condensing boilers with stainless steel heat exchangers. The offered boilers shall be in accordance with The Selfridge ANG Base Design Standards. The installation and replacement shall include but is not limited to all piping connections, combustion air and venting, power connections, boiler pumps, hot water pumps, and system startup and validation. These new pumps and boilers will operate on a loop with the lead / lag configuration which may require some piping changes from the existing configuration.
From Solicitation posted on Aug 04, 2025Notice history
5-
Solicitation Posted Jun 24, 2025
-
Solicitation Posted Jul 16, 2025No changes from previous notice
-
Solicitation Posted Jul 24, 2025No changes from previous notice
Details
Award Information
Not yet awarded
Contacts
Phone
Phone
Agency
Place of Performance
48045