Veterans Point Trail Rehabilitation Project 1240LT26Q0015
Summary
AI-generated · Jan 30, 2026Rehabilitate the Veterans Point Trail at Pactola Reservoir, addressing deterioration of an asphalt trail with steep slopes and limited working area. Work includes crack sealing, asphalt patching, and a seal coat, plus reconstruction of select sections and stabilization of eroding areas. Timber retaining walls will be removed and replaced with segmental concrete block walls; damaged pipe railing will be repaired or removed where not needed. Gabion reinforcements will be installed along the trail edge and at bridge abutments. An overlook near the water will be eliminated, and existing tables, benches, and pedestal grills removed (new seating is planned under separate work). An optional bid item for the Lakeshore Loop (from the bridge to the inlet) includes crack sealing, asphalt seal coat, and 620 square feet of segmental retaining wall.
The trail is about 2,959 feet long with roughly 50 feet of total descent, located on the north side of Pactola Reservoir Dam along Highway 385 in Pennington County, SD. The Lakeshore Loop extends about 1,014 feet and is optional bidding. Site conditions include moderate snowfall from fall through spring. See attachments for the full SOW, specifications, drawings, and related details. Questions and bids have separate deadlines noted in the solicitation.
PROJECT: VETERANS POINT TRAIL REHABILITATION PROJECT - BLACK HILLS NATIONAL FOREST Questions are due by 9:00 a.m. Central Time on February 10, 2026. Quotes are due by 9:00 a.m. Central Time on February 24, 2026 Veterans Point Trail is an asphalt trail with metal railing and timber retaining walls that provide access from the parking area to fishing piers and viewpoints at Pactola Reservoir. As the trail switchbacks its way to from the parking area to the shoreline, the contractor should be aware of the steep slopes and limited working area. The asphalt trail is deteriorating, with severe oxidation, cracks, heaving, and undercutting in the asphalt. The retaining walls are leaning and no longer keep material off the Trail. This project will fill and seal the cracks, reconstruction select sections, stabilize eroding areas, and apply a seal coat to the asphalt. Timber retaining walls will be removed and reconstructed with segmental concrete block retaining walls. The pipe railing is damaged in some areas. This project will also repair the damaged sections of railing and eliminate sections where the railing is not needed. The Project will also construct reinforcement with gabion (wire rock baskets) to repair eroded sections at the trails edge and bridge abutments. Existing timber retaining walls will be removed. New larger retaining walls will be constructed. An overlook near water s edge will be eliminated. Tables, benches, and pedestal fire grills will be removed (though new tables and benches are planned for the site as separate work). From the Bridge, a 1,014 ft loop provides access to an inlet. This Loop is referenced in this project as Lakeshore Loop . Work on this loop is in the OPTIONAL Bid Items and includes crack sealing, asphalt seal coat, and 620 square feet of segmental retaining wall. The Trail is approximately 2,959 feet long, with a descent of approximately 50 feet from the parking lot to the lowest point. It is a paved trail on the North side of Pactola Reservoir Dam, providing access to the water s edge. Veterans Point Trail is located on Highway 385, just North of Pactola Reservoir, Pennington County, South Dakota. The Latitude and Longitude coordinates for the Trailhead are: 44 4'55.88"N, 10329'37.09"W. The elevation of the site is approximately 4,580 feet above mean sea level. The site generally experiences moderate snowfalls beginning in October and November and ending in April. See Attach 1, SOW, SOI, SPECS, and DRAWINGS for more details regarding this project.
From Solicitation posted on Jan 29, 2026PROJECT: VETERANS POINT TRAIL REHABILITATION PROJECT - BLACK HILLS NATIONAL FOREST Questions are due by 9:00 a.m. Central Time on February 10, 2026. Quotes are due by 9:00 a.m. Central Time on February 24, 2026. 02/10/2026: AMENDMENT ONE (AMEND 0001) POSTING: See the Amend 0001_Summary of Changes and read in its entirety. In addition, see Attach 6. the Updated Wage Determination_SD20260001 dated 01.30.2026. This Wage Determination replaces the initial Atach 6, Wage Determination_SD20260032_01.02.26. (See the Attachments/Links for these documents.) Quotes are due by 9:00 a.m. Central Time on Februrary 24, 2026. Refer to Attach 1 - Solicitation for information regarding quote submissions. Veterans Point Trail is an asphalt trail with metal railing and timber retaining walls that provide access from the parking area to fishing piers and viewpoints at Pactola Reservoir. As the trail switchbacks its way to from the parking area to the shoreline, the contractor should be aware of the steep slopes and limited working area. The asphalt trail is deteriorating, with severe oxidation, cracks, heaving, and undercutting in the asphalt. The retaining walls are leaning and no longer keep material off the Trail. This project will fill and seal the cracks, reconstruction select sections, stabilize eroding areas, and apply a seal coat to the asphalt. Timber retaining walls will be removed and reconstructed with segmental concrete block retaining walls. The pipe railing is damaged in some areas. This project will also repair the damaged sections of railing and eliminate sections where the railing is not needed. The Project will also construct reinforcement with gabion (wire rock baskets) to repair eroded sections at the trails edge and bridge abutments. Existing timber retaining walls will be removed. New larger retaining walls will be constructed. An overlook near water s edge will be eliminated. Tables, benches, and pedestal fire grills will be removed (though new tables and benches are planned for the site as separate work). From the Bridge, a 1,014 ft loop provides access to an inlet. This Loop is referenced in this project as Lakeshore Loop . Work on this loop is in the OPTIONAL Bid Items and includes crack sealing, asphalt seal coat, and 620 square feet of segmental retaining wall. The Trail is approximately 2,959 feet long, with a descent of approximately 50 feet from the parking lot to the lowest point. It is a paved trail on the North side of Pactola Reservoir Dam, providing access to the water s edge. Veterans Point Trail is located on Highway 385, just North of Pactola Reservoir, Pennington County, South Dakota. The Latitude and Longitude coordinates for the Trailhead are: 44 4'55.88"N, 10329'37.09"W. The elevation of the site is approximately 4,580 feet above mean sea level. The site generally experiences moderate snowfalls beginning in October and November and ending in April. See Attach 1, SOW, SOI, SPECS, and DRAWINGS for more details regarding this project.
From Solicitation posted on Feb 10, 2026PROJECT: VETERANS POINT TRAIL REHABILITATION PROJECT - BLACK HILLS NATIONAL FOREST Quotes are due by 9:00 a.m. Central Time on February 24, 2026. (Questions were due by 9:00 a.m. Central Time on February 10, 2026.) 02/12/2026: AMENDMENT TWO (AMEND 0002) POSTING: See the Amend 0002_Summary of Changes and read in its entirety. This amendment includes answers to vendor's questions. (See the Attachments/Links for these documents.) Quotes are due by 9:00 a.m. Central Time on Februrary 24, 2026. Refer to Attach 1 - Solicitation for information regarding quote submissions. 02/10/2026: AMENDMENT ONE (AMEND 0001) POSTING: See the Amend 0001_Summary of Changes and read in its entirety. In addition, see Attach 6. the Updated Wage Determination_SD20260001 dated 01.30.2026. This Wage Determination replaces the initial Atach 6, Wage Determination_SD20260032_01.02.26. (See the Attachments/Links for these documents.) Quotes are due by 9:00 a.m. Central Time on Februrary 24, 2026. Refer to Attach 1 - Solicitation for information regarding quote submissions. Veterans Point Trail is an asphalt trail with metal railing and timber retaining walls that provide access from the parking area to fishing piers and viewpoints at Pactola Reservoir. As the trail switchbacks its way to from the parking area to the shoreline, the contractor should be aware of the steep slopes and limited working area. The asphalt trail is deteriorating, with severe oxidation, cracks, heaving, and undercutting in the asphalt. The retaining walls are leaning and no longer keep material off the Trail. This project will fill and seal the cracks, reconstruction select sections, stabilize eroding areas, and apply a seal coat to the asphalt. Timber retaining walls will be removed and reconstructed with segmental concrete block retaining walls. The pipe railing is damaged in some areas. This project will also repair the damaged sections of railing and eliminate sections where the railing is not needed. The Project will also construct reinforcement with gabion (wire rock baskets) to repair eroded sections at the trails edge and bridge abutments. Existing timber retaining walls will be removed. New larger retaining walls will be constructed. An overlook near water s edge will be eliminated. Tables, benches, and pedestal fire grills will be removed (though new tables and benches are planned for the site as separate work). From the Bridge, a 1,014 ft loop provides access to an inlet. This Loop is referenced in this project as Lakeshore Loop . Work on this loop is in the OPTIONAL Bid Items and includes crack sealing, asphalt seal coat, and 620 square feet of segmental retaining wall. The Trail is approximately 2,959 feet long, with a descent of approximately 50 feet from the parking lot to the lowest point. It is a paved trail on the North side of Pactola Reservoir Dam, providing access to the water s edge. Veterans Point Trail is located on Highway 385, just North of Pactola Reservoir, Pennington County, South Dakota. The Latitude and Longitude coordinates for the Trailhead are: 44 4'55.88"N, 10329'37.09"W. The elevation of the site is approximately 4,580 feet above mean sea level. The site generally experiences moderate snowfalls beginning in October and November and ending in April. See Attach 1, SOW, SOI, SPECS, and DRAWINGS for more details regarding this project.
From Solicitation posted on Feb 12, 2026PROJECT: VETERANS POINT TRAIL REHABILITATION PROJECT - BLACK HILLS NATIONAL FOREST 02/18/2026: AMENDMENT THREE (AMEND 0003) POSTING: Additional Site Vist will be held - See A0003 for complete details. The due dates for Questions and Quotes have been extended - See A0003 for complete details. This amendment also includes answers to previous vendor's questions. (See the Attachments/Links for A0003 and previously uploaded documents in association with this project.) 02/12/2026: AMENDMENT TWO (AMEND 0002) POSTING: See the Amend 0002_Summary of Changes and read in its entirety. This amendment includes answers to vendor's questions. (See the Attachments/Links for these documents.) Quotes are due by 9:00 a.m. Central Time on Februrary 24, 2026. Refer to Attach 1 - Solicitation for information regarding quote submissions. 02/10/2026: AMENDMENT ONE (AMEND 0001) POSTING: See the Amend 0001_Summary of Changes and read in its entirety. In addition, see Attach 6. the Updated Wage Determination_SD20260001 dated 01.30.2026. This Wage Determination replaces the initial Atach 6, Wage Determination_SD20260032_01.02.26. (See the Attachments/Links for these documents.) Quotes are due by 9:00 a.m. Central Time on Februrary 24, 2026. Refer to Attach 1 - Solicitation for information regarding quote submissions. Veterans Point Trail is an asphalt trail with metal railing and timber retaining walls that provide access from the parking area to fishing piers and viewpoints at Pactola Reservoir. As the trail switchbacks its way to from the parking area to the shoreline, the contractor should be aware of the steep slopes and limited working area. The asphalt trail is deteriorating, with severe oxidation, cracks, heaving, and undercutting in the asphalt. The retaining walls are leaning and no longer keep material off the Trail. This project will fill and seal the cracks, reconstruction select sections, stabilize eroding areas, and apply a seal coat to the asphalt. Timber retaining walls will be removed and reconstructed with segmental concrete block retaining walls. The pipe railing is damaged in some areas. This project will also repair the damaged sections of railing and eliminate sections where the railing is not needed. The Project will also construct reinforcement with gabion (wire rock baskets) to repair eroded sections at the trails edge and bridge abutments. Existing timber retaining walls will be removed. New larger retaining walls will be constructed. An overlook near water s edge will be eliminated. Tables, benches, and pedestal fire grills will be removed (though new tables and benches are planned for the site as separate work). From the Bridge, a 1,014 ft loop provides access to an inlet. This Loop is referenced in this project as Lakeshore Loop . Work on this loop is in the OPTIONAL Bid Items and includes crack sealing, asphalt seal coat, and 620 square feet of segmental retaining wall. The Trail is approximately 2,959 feet long, with a descent of approximately 50 feet from the parking lot to the lowest point. It is a paved trail on the North side of Pactola Reservoir Dam, providing access to the water s edge. Veterans Point Trail is located on Highway 385, just North of Pactola Reservoir, Pennington County, South Dakota. The Latitude and Longitude coordinates for the Trailhead are: 44 4'55.88"N, 10329'37.09"W. The elevation of the site is approximately 4,580 feet above mean sea level. The site generally experiences moderate snowfalls beginning in October and November and ending in April. See Attach 1, SOW, SOI, SPECS, and DRAWINGS for more details regarding this project.
From Solicitation posted on Feb 18, 2026PROJECT: VETERANS POINT TRAIL REHABILITATION PROJECT - BLACK HILLS NATIONAL FOREST 02/27/2026: AMENDMENT FOUR (AMEND 0004) POSTING: Please read this amendment in its entirety. This amendment includes answers to vendor's questions; the Site Visit's Sign in Sheet of attendees; an update to the estimated POP; Updated Specifications_26FEB2026 (Please use these Updeaed Specifications going forward unless otherwise notified; Updated SOI_26FEB206; incorporation of FAR Clause 52.219-14, Limitation on Subcontracting. (See the Attachments/Links for A0004 and previously uploaded documents in association with this project. See Attach 1, Solicitation, for reqiurements regarding submitting quotes for this project.) 02/18/2026: AMENDMENT THREE (AMEND 0003) POSTING: Additional Site Vist will be held - See A0003 for complete details. The due dates for Questions and Quotes have been extended - See A0003 for complete details. This amendment also includes answers to previous vendor's questions. (See the Attachments/Links for A0003 and previously uploaded documents in association with this project.) 02/12/2026: AMENDMENT TWO (AMEND 0002) POSTING: See the Amend 0002_Summary of Changes and read in its entirety. This amendment includes answers to vendor's questions. (See the Attachments/Links for these documents.) Quotes are due by 9:00 a.m. Central Time on Februrary 24, 2026. Refer to Attach 1 - Solicitation for information regarding quote submissions. 02/10/2026: AMENDMENT ONE (AMEND 0001) POSTING: See the Amend 0001_Summary of Changes and read in its entirety. In addition, see Attach 6. the Updated Wage Determination_SD20260001 dated 01.30.2026. This Wage Determination replaces the initial Atach 6, Wage Determination_SD20260032_01.02.26. (See the Attachments/Links for these documents.) Quotes are due by 9:00 a.m. Central Time on Februrary 24, 2026. Refer to Attach 1 - Solicitation for information regarding quote submissions. Veterans Point Trail is an asphalt trail with metal railing and timber retaining walls that provide access from the parking area to fishing piers and viewpoints at Pactola Reservoir. As the trail switchbacks its way to from the parking area to the shoreline, the contractor should be aware of the steep slopes and limited working area. The asphalt trail is deteriorating, with severe oxidation, cracks, heaving, and undercutting in the asphalt. The retaining walls are leaning and no longer keep material off the Trail. This project will fill and seal the cracks, reconstruction select sections, stabilize eroding areas, and apply a seal coat to the asphalt. Timber retaining walls will be removed and reconstructed with segmental concrete block retaining walls. The pipe railing is damaged in some areas. This project will also repair the damaged sections of railing and eliminate sections where the railing is not needed. The Project will also construct reinforcement with gabion (wire rock baskets) to repair eroded sections at the trails edge and bridge abutments. Existing timber retaining walls will be removed. New larger retaining walls will be constructed. An overlook near water s edge will be eliminated. Tables, benches, and pedestal fire grills will be removed (though new tables and benches are planned for the site as separate work). From the Bridge, a 1,014 ft loop provides access to an inlet. This Loop is referenced in this project as Lakeshore Loop . Work on this loop is in the OPTIONAL Bid Items and includes crack sealing, asphalt seal coat, and 620 square feet of segmental retaining wall. The Trail is approximately 2,959 feet long, with a descent of approximately 50 feet from the parking lot to the lowest point. It is a paved trail on the North side of Pactola Reservoir Dam, providing access to the water s edge. Veterans Point Trail is located on Highway 385, just North of Pactola Reservoir, Pennington County, South Dakota. The Latitude and Longitude coordinates for the Trailhead are: 44 4'55.88"N, 10329'37.09"W. The elevation of the site is approximately 4,580 feet above mean sea level. The site generally experiences moderate snowfalls beginning in October and November and ending in April. See Attach 1, SOW, SOI, SPECS, and DRAWINGS for more details regarding this project.
From Solicitation posted on Feb 27, 2026NOTICE OF AWARD This notification is being issued to inform contractors that the Veterans Point Trail Rehabilitation Project (Solicitation #: 1240LT26Q0015/Contract #: 1240LT26C0006) was awarded on April 24, 2026. Nine (9) contractors responded to the Solicitation. The awarded contractor was ICD Builders, Incorporated with an overall bid of $331,749.00.
From Award Notice posted on Apr 29, 2026Notice history
6-
Solicitation Posted Jan 29, 2026
-
Solicitation Posted Feb 18, 2026View changes (2)
- Description: Description was updated
- Response Deadline: Feb 24, 2026 → Mar 24, 2026
-
Award Notice LATEST Posted Apr 29, 2026
Details
Award Information
Award Notices
Posted: Apr 29, 2026
NOTICE OF AWARD This notification is being issued to inform contractors that the Veterans Point Trail Rehabilitation Project (Solicitation #: 1240LT26Q0015/Contract #: 1240LT26C0006) was awarded on April 24, 2026. Nine (9) contractors responded to the Solicitation. The awarded contractor was ICD Bui...
Awardees
| Company Name | UEI | CAGE Code | Location |
|---|---|---|---|
| ICD Builders, Incorporated | YF4NRZ7U2XG8 | 516R1 | Fargo, ND |
Contacts
Agency
Place of Performance