Contacts, documents and full notice history are available with a subscription.
Solicitation NONE Expired 1 notice 1 document

VALVE ASSEMBLY N0010426QLB46

Solicitation N0010426QLB46 Copied Notice ID 75f92c370f2745ffb2523f8f0397be41 Copied DEPT OF DEFENSE — NAVSUP WEAPON SYSTEMS SUPPORT MECH
SAM.gov
Posted
Apr 23, 2026
Deadline
May 13, 2026
Set-aside
NONE
NAICS
332911
PSC
4810

Summary

AI-generated · Apr 24, 2026

Repair of valve assemblies is requested under an RFQ. Verify exact nomenclature, part number, and NSN before bidding. The award will be bilateral, requiring the contractor’s written acceptance prior to execution, and the Government targets a 63-day Repair Turnaround Time (RTAT) with Government Source Inspection required. All freight is FOB origin and Navy entities handle freight under specified CAV procedures. Accelerated delivery is encouraged at no additional cost, and the contract leverages Emergency Acquisition Flexibilities (EAF).

Submit a quote that includes your quote amount and the RTAT, and indicate whether the price is firm-fixed-price, estimated, or not-to-exceed, with unit price and total price. If you cannot meet the required RTAT, disclose capacity constraints. The asset will be returned to the contractor, who must report CAV transactions and obtain final government acceptance within the RTAT. Include Return Material Authorization information, any testing/price considerations for BR/BER determinations, and note that a price reduction per unit per month applies if RTAT is missed (with a specified maximum). The government may exercise an option to add quantity, to be delivered at the same rate as the base items, with inspection and acceptance at origin.

CONTACT INFORMATION|4|N713.26|GL0|(771) 229-1473|JOSEPH.D.WEAVER22.CIV@US.NAVY.MIL|ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2|||WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|COMBO INVOICE & RECEIVING||TBD|N00104|TBD|TBD|SEE SCHEDULE|TBD|||TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| NOTICE OF CYBERSECURITY MATURITY MODEL CERTIFICATION LEVEL REQUIREMENTS (NOV 2025))|1|| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)-BASIC (DEV 2026-O0037)(FEB 2026))|2||| CONTRACTOR PURCHASING SYSTEM ADMINISTRATION-BASIC (DEVIATION 2026-O0015)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X|This solicitation is issued pursuant to Emergency Acquisition Flexibilities (EAF). ** CASREP ** ACCELERATED DELIVERY IS ENCOURAGED AND ACCEPTED AT NO ADDITIONAL COST TO GOVERNMENT. All freight is FOB Origin. This RFQ is for repair. The resultant award of this solicitation will be issued bilaterally, requiring the contractor s written acceptance prior to execution. Verify nomenclature, part number, and NSN prior to responding. The Government is seeking a Repair Turnaround Time (RTAT) of: 63 Days Government Source Inspection (GSI) is required. Please note freight is handled by Navy CAV or Proxy CAV as stated in NAVSUPWSSFA24 or NAVSUPWSSFA25. Your quote should include the following information: ***************QUOTE AMOUNT AND RTAT *************** *Check one: Firm-fixed-Price ___ Estimated ___ NTE ___ Unit Price:__________ Total Price:__________ Repair Turnaround Time (RTAT): _______ days If your company is not quoting the Government s Required Repair TurnaroundTime (RTAT) or earlier, provide your company s capacity constraints? _________________________________________________________________ _________________________________________________________________ _________________________________________________________________ Repair Turnaround Time (RTAT): the resultant contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor s facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in this contract. *Return Material Authorization # (RMA), if applicable:__________ *Delivery Vehicle (if Delivery Order requested) (if your company has a current BOA/IDIQ, for example) :__________________ ***************TESTING AND EVALUATION IF BEYOND REPAIR*************** * T&E fee/price (if asset is determined BR/BER): If an item is determined BR, and the contractor provides documentation that costs were incurred during evaluation and determination of BR, the contracting officer will negotiate a reduced contract price, not-to exceed (NTE) $___________associated with the repair effort to reflect the BR status of the equipment. * The T&E fee (if asset is determined BR/BER) was determined/computed based on:______________________________________. ***************AWARDEE INFO & PERFORMANCE LOCATION*************** Awardee CAGE: __________ *Inspection & Acceptance CAGE, if not same as ""awardee CAGE"": __________ * Facility/Subcontractor CAGE (where the asset should be shipped), if not same as ""awardee CAGE"":__________ *************** IOT COMPARE REPAIR PRICE TO PRICE TO BUY NEW*************** *New unit price:__________ *New unit delivery lead-time:__________ IMPORTANT NOTE: Any asset for which the contractor does not meet the required RTAT will incur a price reduction per unit/per month the contractor is late - any delay determined to be excusable (e.g. Government Delay) will not result in a price reduction. If a price reduction is required due to unexcusable contractor delay, the Contracting Officer will implement the aforementioned price reduction via a ""reconciliation modification"" at the end of the contract performance. Price reductions made pursuant to this section shall not limit other remedies available to the Government for failure to meet required RTATs, including but not limited to the Government s right toterminate for default. In reference to the above important note, the contractor provides the following price reduction amount per unit per month the contractor does not meet the RTAT: $__________, up to a maximum of: $_________. The Government intends to add an option quantity to the resultant contract. In reference to the option quantity, the Government may increase the quantity of supplies called for in the Schedule at the unit price specified. The Contracting Officer may exercise the option by written notice to the Contractor within the number of days in FAR 52.217-6 herein. Delivery of the added items shall continue at the same rate as the like items called for under the contract, unless the parties otherwise agree. Yes______ No____ INSPECTION AT ORIGIN ACCEPTANCE AT ORIGIN POC EMAIL: JOSEPH.D.WEAVER22.CIV@US.NAVY.MIL

From Solicitation posted on Apr 23, 2026

Notice history

1
  1. Solicitation LATEST Posted Apr 23, 2026 View

Details

Solicitation number N0010426QLB46
Notice ID 75f92c370f2745ffb2523f8f0397be41
Notice type Solicitation
Product / Service (PSC) 4810
NAICS 332911
Set-aside No Set aside used
Archive date May 28, 2026

Award Information

Not yet awarded

Documents

1
View on SAM.gov

Contacts

primary
Joseph D. Weaver

Email

Phone

Agency

DEPT OF DEFENSE
DEPT OF THE NAVY
NAVSUP
NAVSUP WEAPON SYSTEMS SUPPORT
NAVSUP WSS MECHANICSBURG
NAVSUP WEAPON SYSTEMS SUPPORT MECH

Dates

Posted Apr 23, 2026 3 months ago
Last Updated Aug 06, 2026 1 day ago
Due May 13, 2026 2 months ago