Heavy Duty Vehicle Lifts FA481925Q0025
Summary
AI-generated · Aug 23, 2025Two drive-through heavy-duty vehicle lifts (Rotary V Rex lifts or equal) are required for installation at Tyndall AFB, with two units to be delivered and installed under the attached statement of work. Lifts must support a minimum 44,000 lb capacity, have a 28 ft platform, be 4-leg surface-mounted (not a 4-post), and include air-operated rolling bridge axle jacks (22,000 lb each, 2 per lift), safety switches, and a full-length light kit. Requirements cover electrical: 3-phase, 208–230 V, 15 hp minimum; ramp and overall dimensions (maximum 48 ft overall length with 10 ft ramps; 300 in wheelbase; 8 ft wheel track; 7 ft front bumper to front axle; 9 ft 7.5 in rear axle to rear bumper; 13 in minimum vehicle profile); ramp length flexibility with engineering data; surface thickness and lift control unit specifications. Quotes must include freight, installation, and any rental costs, and bidders must provide air/electrical connection requirements, site-readiness, and one-year warranty for parts and labor, along with past performance, country of manufacture, product numbers, and feasible delivery dates. Respondents must be SAM-registered before award and throughout performance, and submissions should address the attached SOW and related documentation.
Amendments and related notices add clarifications: the latest amendment clarifies response dates and evaluation factors, and Q&As have been posted to address bidder questions; bidders should review all attachments (including the SOW and combo solicitation) for full details.
This is a combined synopsis/solicitation for commercial items (supply) prepared inaccordance with FAR Subpart 12.6, as supplemented with additional information including this notice. This announcement constitutes the only solicitation; quotations are requested. The solicitation document, incorporated provisions, and clauses in effect are IAW FAR, DFAR, AFFARS and all other related guidance. This acquisition is a 100 percent Small Business Set-Aside. The North American IndustryClassification System (NAICS) code is 333921, Elevator and Moving Stairway Manufacturing and a ProductService Code (PSC) 4910, Motor Vehicle Maintenance and Repair Shop Specialized Equipment. The 2025 Small Business Size Standard is 1,000 Employees. Off ers (Quotes) received in response to this solicitation will be evaluated IAW FAR 52.212-2(a) using the following factor(s) to determine best value: a. Technical capability of the item/service offered to meet the Government requirement; and b. Price (evaluation of price shall be the sum of all line items, including options if applicable). Salient Characteristics Rotary V Rex Vehicle lifts Or Equal Tyndall AFB is requiring 2 drive thru vehicle lifts. All quotes must include freight, installation and any rental costs needed to install the lifts. Please provide air, electrical connections requirements for the lifts. Provide surface thickness requirements for lift and specifications of lift control unit. Lift cannot be longer than 28ft platform. Cannot be a 4 post. 4-Leg Surface mounted. 44,000 LB Minimum capacity clear floor open base vertical rise vehicle lift. 300" max wheelbase. Overall Lengths With standard 10 approach ramps 48 Maximum. **Shorter length of ramp will be considered, must provide engineering data to prove a shorter ramp will meet end user fleet profile. Lowest vehicle profile if 13 inches. Distance from front bumper to center line of front axle is 7 feet. Distance from center line of rear axle to rear bumper is 9 feet 7.5 inches. Wheel track is 8 feet.** Electrical Standard 3ph, 208-230 Motor 15hp minimum 1-year warranty for parts and labor Air operated rolling bridge axle jack for 22,000LB minimum capacity 2 per lift Lift must have safety switches Each lift needs light kit to illuminate the entire length of the lift Contractors interested in submitting an offer (Quote) must acknowledge the requirement that prospective awardees shall be registered in the System for Award Management (SAM) prior to award, during performance, and through final payment of a contract agreement, IAW FAR 52.204-7, System for Award Management. Also, IAW FAR 52.204-13, System for Award Management Maintenance; a contractor is responsiblefor the accuracy and completeness of the data within the SAM database and is required to review and update their SAM registration on an annual basis. RESPONSES: Responses shall be submitted via e-mail to A1C Alan Vazquez Lopez at Alan.vazquez_lopez.2.mx@us.af.mil, and to SSgt Benjamin Spear at benjamin.spear.1@us.af.mil no later than Tuesday, July 15, 2025 at 1:00 PM CST. Quotes shall include past performance information: other military, commercial, and civilian companies with whom you have done business. Include country of manufacture, product numbers for all items, and include feasible delivery dates. Proprietary information, if any, should be minimized and MUST BE CLEARLY MARKED. To aid the Government, please segregate proprietary information. Please be advised that all submissions become Government property and will not be returned. QUESTIONS: All Questions shall be submitted electronically to A1C Alan Vazquez Lopez atAlan.vazquez_lopez.2.mx@us.af.mil. and SSgt Benjamin Spear at benjamin.spear.1@us.af.mil by Friday, July 8, 2025, at 10:00 AM CST. The Government does not guarantee that questions received after July 8, 2025, will be answered. Late quotes will not be accepted at the Contracting Officer s discretion. Please review all attached documentation for full details of the requested equipment. For additional information/details please see attachments. 1. SOW 2. Combo solicitation
From Combined Synopsis/Solicitation posted on Jun 27, 2025Amendment 0001 - The purpose of this amendment was to provide clarification on response dates and evaluation factors. Please see attached amendment all changes are highlighted. This is a combined synopsis/solicitation for commercial items (supply) prepared inaccordance with FAR Subpart 12.6, as supplemented with additional information including this notice. This announcement constitutes the only solicitation; quotations are requested. The solicitation document, incorporated provisions, and clauses in effect are IAW FAR, DFAR, AFFARS and all other related guidance. Tyndall AFB is requesting quotes for 2 each, Heavy Duty Vehicle Lifts (Rotary V Rex Lifts or Equal) IAW Statement of Work. Please see the attached combined synopsis/solicitation and Statement of Work for full details. QUESTIONS: All Questions shall be submitted electronically to A1C Alan Vazquez Lopez atAlan.vazquez_lopez.2.mx@us.af.mil. and SSgt Benjamin Spear at benjamin.spear.1@us.af.mil by Friday, July 8, 2025, at 10:00 AM CST. The Government does not guarantee that questions received after July 8, 2025, will be answered. Late quotes will not be accepted at the Contracting Officer s discretion. Please review all attached documentation for full details of the requested equipment.
From Combined Synopsis/Solicitation posted on Jul 08, 2025Questions and answers are posted please see attached Q&As Amendment 0001 - The purpose of this amendment was to provide clarification on response dates and evaluation factors. Please see attached amendment all changes are highlighted. This is a combined synopsis/solicitation for commercial items (supply) prepared inaccordance with FAR Subpart 12.6, as supplemented with additional information including this notice. This announcement constitutes the only solicitation; quotations are requested. The solicitation document, incorporated provisions, and clauses in effect are IAW FAR, DFAR, AFFARS and all other related guidance. Tyndall AFB is requesting quotes for 2 each, Heavy Duty Vehicle Lifts (Rotary V Rex Lifts or Equal) IAW Statement of Work. Please see the attached combined synopsis/solicitation and Statement of Work for full details. QUESTIONS: All Questions shall be submitted electronically to A1C Alan Vazquez Lopez atAlan.vazquez_lopez.2.mx@us.af.mil. and SSgt Benjamin Spear at benjamin.spear.1@us.af.mil by Friday, July 8, 2025, at 10:00 AM CST. The Government does not guarantee that questions received after July 8, 2025, will be answered. Late quotes will not be accepted at the Contracting Officer s discretion. Please review all attached documentation for full details of the requested equipment.
From Combined Synopsis/Solicitation posted on Jul 10, 2025Notice history
3-
-
Combined Synopsis/Solicitation Posted Jul 08, 2025View changes (3)
- Title: V Rex vehicle lifts or Equal → Heavy Duty Vehicle Lifts
- Description: Description was updated
- Response Deadline: Jul 11, 2025 → Jul 15, 2025
-
Combined Synopsis/Solicitation LATEST Posted Jul 10, 2025View changes (1)
- Description: Description was updated
Details
Award Information
Not yet awarded
Contacts
Phone
Phone
Agency
Place of Performance
USA