Contacts, documents and full notice history are available with a subscription.
Combined Synopsis/Solicitation SBA Expired 1 notice 2 documents

UV Vis-NIR Spectrometer 2031ZA25Q00195

Solicitation 2031ZA25Q00195 Copied Notice ID dae5a203fa184d7abcf8ca4d2d252cd7 Copied TREASURY, DEPARTMENT OF THE — OFFICE OF THE CHIEF PROCUREMENT OFFICER
SAM.gov
Posted
Aug 04, 2025
Deadline
Aug 18, 2025
Set-aside
SBA
NAICS
334516
PSC
6640

Summary

AI-generated · Aug 24, 2025

Two new UV-Vis-NIR spectrophotometers are required for BEP’s quality laboratories at the District Currency Facility in Washington, DC, to measure the optical properties of incoming ink and paper materials. These instruments will ensure the materials’ optical properties meet production specifications for currency, replacing end-of-life units.

The contract covers delivery, installation, and commissioning of the equipment, with BEP personnel to be trained by qualified contractors.

The Bureau of Engraving and Printing (BEP) is a component of the Department of the Treasury that designs, engraves, and prints U.S. banknote currency and other U.S. security products. In support of these operations at BEP's District Currency Facility (DCF), located in Washington, DC, the BEP, Office of Quality Operations (OQO) requires two (2) UV-Vis-NIR Spectrophotometers. The spectrophotometers are required to measure the optical properties of ink and paper. The purpose of this acquisition is to purchase two (2) new UV-Vis-NIR spectrophotometer that is capable of performing inspection of incoming ink and paper materials for their specified optical properties. In the quality laboratories, the spectrophotometer is used to measure optical properties of incoming ink and paper materials. These optical properties need to meet certain specifications in order to ensure the materials are of sufficient quality to be used in production. Therefore, a spectrophotometer capable of accurately measuring these qualities is essential for the currency production process. The current spectrophotometer units have reached end-of-life and must be replaced. The new spectrophotometer units need to be purchased, delivered, and installed. BEP personnel must be trained by qualified contractors. As a result, BEP needs to complete the acquisition and qualification of new equipment to replace the current units.

From Combined Synopsis/Solicitation posted on Aug 04, 2025

Notice history

1
  1. Combined Synopsis/Solicitation LATEST Posted Aug 04, 2025

Details

Solicitation number 2031ZA25Q00195
Notice ID dae5a203fa184d7abcf8ca4d2d252cd7
Notice type Combined Synopsis/Solicitation
Product / Service (PSC) 6640
NAICS 334516
Place of performance Washington, District of Columbia
Archive date Aug 19, 2025

Award Information

Not yet awarded

Contacts

primary
Naweed Nezam

Email

Agency

TREASURY, DEPARTMENT OF THE
BUREAU OF ENGRAVING AND PRINTING
OFFICE OF THE CHIEF PROCUREMENT OFFICER

Place of Performance

Washington, District of Columbia 20228
USA

Dates

Posted Aug 04, 2025 1 year ago
Last Updated Aug 06, 2026 1 day ago
Due Aug 18, 2025 11 months ago