USNS COMFORT Integrated Bridge System N3220525Q7054
Summary
AI-generated · Aug 30, 2025Design, build, install, and test a commercial-grade Integrated Bridge System (IBS) for the USNS COMFORT, including upgrades and reconfiguration of the Wheelhouse and related spaces. The base period covers design, with two funded options to follow: Option 1 for procurement/fabrication and testing of major system components aligned with the initial design, and Option 2 for installation of the IBS.
All work must meet applicable standards and requirements from ABS, USCG, IMO, and IEEE. Complete details are provided in the attached documentation.
This item describes the requirements for design, build, installation, and testing of a commercial grade Integrated Bridge System (IBS) including associated upgrades and rearrangement of the Wheelhouse and related spaces. The Base Period of this contract is to be initially awarded for the design with two additional contract options, each to be exercised with subsequent funding. Option 1 will be to perform equipment procurement/fabrication and testing of major system components associated with the design of the initial contract. Option 2 will be for installation of the Integrated Bridge System. System design, fabrication, and installation shall meet applicable American Bureau of Shipping (ABS), US Coast Guard (USCG), International Maritime Organization (IMO), and Institute of Electrical and Electronics Engineers (IEEE) requirements. See attached for complete details
From Combined Synopsis/Solicitation posted on Aug 28, 2025This item describes the requirements for design, build, installation, and testing of a commercial grade Integrated Bridge System (IBS) including associated upgrades and rearrangement of the Wheelhouse and related spaces. The Base Period of this contract is to be initially awarded for the design with two additional contract options, each to be exercised with subsequent funding. Option 1 will be to perform equipment procurement/fabrication and testing of major system components associated with the design of the initial contract. Option 2 will be for installation of the Integrated Bridge System. System design, fabrication, and installation shall meet applicable American Bureau of Shipping (ABS), US Coast Guard (USCG), International Maritime Organization (IMO), and Institute of Electrical and Electronics Engineers (IEEE) requirements. See attached for complete details *PWS added
From Combined Synopsis/Solicitation posted on Sep 03, 2025Notice history
2-
Combined Synopsis/Solicitation Posted Aug 28, 2025
-
Combined Synopsis/Solicitation LATEST Posted Sep 03, 2025View changes (1)
- Description: Description was updated
Details
Award Information
Not yet awarded
Contacts
Phone
Phone