USDB Steam Boiler Bldg. 1140 Ft. Leavenworth W91QF4-25-B-A014
Summary
AI-generated · Aug 24, 2025Demolish and replace the existing steam boiler and related equipment in the E134 mechanical room of the USDB Prison, providing all labor, equipment, and materials per the project plans and specifications.
Also replace three corroded electrical panels (one 150A MCB and two 600A MLO) and one 45 kVA step-down transformer located in the boiler room. The equipment has degraded due to exposure to steam, chemicals, and humidity; install NEMA 4X-rated stainless steel components to mitigate environmental damage and ensure compliance with NEC 110.11 and 450.9.
The work consists of furnishing all plant, labor, equipment, and materials to perform all work in strict accordance with the plans and specification to perform all work in strict accordance with the plans and specification to demolish and replace the existing steam boiler and associated equipment in The USDB Prison s E134 mechanical room. In addition to the steam boiler replacement, the work will also include the replacement of three corroded electrical panels (one 150A MCB and two 600A MLO) and one 45 kVA step-down transformer located in a boiler room. The existing equipment is deteriorating due to direct exposure to steam, chemicals and high humidity conditions. The replacement work will include furnishing and installing NEMA 4X-rated stainless steel equipment to mitigate environmental damage and comply with NEC 110.11 and 450.9.
From Solicitation posted on Aug 11, 2025Notice history
1-
Solicitation LATEST Posted Aug 11, 2025
Details
Award Information
Not yet awarded