Contacts, documents and full notice history are available with a subscription.
Combined Synopsis/Solicitation SBA Expired 1 notice 1 document

USCGC Willow Towing 70Z08525Q0030284

Solicitation 70Z08525Q0030284 Copied Notice ID d550c4c7f6da4309b0326ae5a1681228 Copied HOMELAND SECURITY, DEPARTMENT OF — SFLC PROCUREMENT BRANCH 2(00085)
SAM.gov
Posted
Sep 09, 2025
Deadline
Sep 16, 2025
Set-aside
SBA
NAICS
336611
PSC
J020

Summary

AI-generated · Sep 10, 2025

Towing services are required to move USCGC Willow from Charleston, SC to the US Coast Guard Yard in Baltimore, MD due to a propulsion casualty (Willow currently has no propulsion and a removed propulsion shaft). The contractor must provide the tow vessel, all towing equipment and rigging, install towing fittings, prepare the vessel for tow, supply a qualified pilot, riding crew, and assist tugs, and conduct the tow in accordance with applicable Coast Guard rules and the SFLC standard specifications. Do not use shipboard winches to control the tow; ensure protective measures and interference handling per the specified standards.

Before towing, a Pre-tow Conference must be held at least 48 hours ahead, with the tow vessel and equipment available for review and planning. A written towing plan and emergency procedures must be submitted at least 48 hours prior, detailing two tow connection methods (main and emergency) with connection points and line sizes, operating procedures, safety requirements, communications, staffing, and any special precautions. The contractor must present a sailing plan, coordinate with the cutter on route and weather contingencies, commence the tow during daylight hours (towing may continue at night if compliant), maintain a continuous lookout on tow connections, monitor weather with a forecast 24 hours prior for at least 48 hours along the route, ensure wind does not exceed 25 knots and vessel speed does not exceed 6 knots, and use standard signaling. If contractor personnel are onboard, they must stay in radio contact with Coast Guard crew and follow instructions. Subcontracting to a qualified tow captain is allowed with fair wage arrangements, and the submission should note this arrangement if chosen.

ITEM 1: Towing Services, Charleston, SC to Baltimore, MD 1. SCOPE 1.1 Intent/Background. This work item describes the requirements for the Contractor to provide towing services for CGC Willow while they transit to and from the locations in table 1. They currently do not have any means of propulsion, with a known engineering casualty to their reduction gear, and their only propulsion shaft is removed with stern tube blanked. The intent of this work is to get tug service that has the capability to transit them from Charleston, SC to the US Coast Guard Yard while they await repairs. Table 1 - Transit Locations POINT OF DEPARTURE POINT OF ARRIVAL Pier Port Country Pier Port Country Pier Papa; BASE FLETC Charleston, SC USA US Coast Guard Yard Baltimore, MD USA/ 600NM 1.2 Government-furnished property. None. 2. REFERENCES Coast Guard Drawings None Coast Guard Publications Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements Coast Guard Commandant Instruction (COMDTINST) M16672.2D, Mar 1999, Navigation Rules, International-Inland Other References None 3. REQUIREMENTS 3.1 General. The Contractor must provide the necessary towing equipment and rigging, install towing fittings on the vessel, prepare the vessel for the tow, provide a towing vessel, qualified pilot, riding crew and assist tugs, and accomplish tow of vessel from the point of departure to the point of arrival designated in paragraph 1.1 (Intent). Towing operations must be conducted in accordance with COMDTINST M16672.2D and all federal, State, and local regulations. The Contractor must not use shipboard winches or any other deck machinery to control or winch the vessel for towing operations but may use appropriate attachment points on the vessel to secure and control the vessel during towing operations. 3.1.1 CIR. None. 3.1.2 Tech Rep. Not applicable. 3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection). 3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). 3.2 Pre-towing conference. Prior to conducting towing operations, the Contractor must convene a Pre-towing Conference a minimum of 48 hours prior to the scheduled tow date. The Contractor must notify the cutter and IBCT Product Line of the intended conference to discuss, and location, a minimum of three business days in advance of the departure. The Contractor must have all towing equipment and rigging, including the tow vessel, available at the conference to allow the cutter or COR to work out any questions or plans for towing capabilities and strategy. Discuss all towing plan details to the satisfaction of the cutters commanding officer. NOTE Pre-towing Conference is not required to convene at the point of departure. But a walk around of both the tow vessel and the vessel being towed is required to ensure both parties understand their roles and responsibilities. 3.3 Towing plan. The Contractor must submit a written towing plan and emergency procedure for the cutter for review and approval a minimum of 48 hours prior to the scheduled Towing evolution. This plan must include two methods of tow connection: (a) Main Tow Connection and (b) Emergency Tow Connection, both of which must include all details such as connection points, and size of lines. The towing plan must also include but is not limited to the following: A statement of operating procedure and safety requirements. Communication plan. Any special precautions or actions required because of characteristics or conditions of vessel. Description of all stations to be manned and functions to be performed. 3.4 Sailing plan. The Contractor must contact the ship prior to departure and ensure they agree with the planned transit route and ensure they have a plan for emergency weather conditions. 3.5 Towing requirements. 3.5.1 Daylight towing. Upon COR approval of Towing Plan, the Contractor must ensure the tow tug arrives and departs the point of departure during daylight hours. NOTE While the vessel is required to leave the point of departure during daylight hours, towing operations may continue through the night provided operations are conducted in accordance with COMDTINST M16672.2D and all Federal, State, and local regulations. 3.5.2 Watch. The Contractor must provide continuous watch on tow connections when in operation and apply grease to applicable chocks on their vessel. 3.5.3 Weather. The Contractor must coordinate with Willow frequently prior to and during the transit to identify any hazardous weather conditions that need to be avoided. The Contractor must obtain a weather report 24 hours before departure for a period of at least 48 hours after departure over the intended route. Submit CFR. Wind speeds must not exceed 25 knots for the entire duration of towing operations. The maximum speed of the vessel must not exceed six knots at any time during towing operations. 3.5.4 Signaling. The Contractor must use light and sound signals in accordance with COMDTINST M16672.2D. 3.5.5 Personnel onboard vessel. The cutter will be manned while making the transit and be able to assist with hooking up any tow lines or equipment as needed on board Willow. If contractor personnel are onboard the vessel during tow operations, the Contractor must be aware of all personnel onboard, including both Coast Guard and civilian. The Contractor must have direct contact via radio with the personnel and must provide them direction as necessary if tow operations are needed. 4. NOTES NOTE 1: PLANNED DEPARTURE DATE WILL BE 29SEP25 & SECONDARY DEPARTURE DATE WILL 06OCT25 BE IF CTR IS INTERESTED IN THE WORK BUT UNABLE TO MEET THESE DATES PLEASE SUBMIT A PROPOSAL WITH DATES PROVIDED TO ALLOW THE POINTS OF CONTACT BELOW TO REVIEW NOTE 2: THE CONTRACT MAY BE SUBCONTRACTED TO A QUALIFIED TOW CAPTAIN AND COMPANY AND PAY WILL BE PROVIDED TO THE PRIMARY CONTRACTOR AND THEY WILL BE REQUIRED TO PAY AND ENSURE FAIR WAGE FOR THE TOW SERVICE. IF THIS IS THE ROUTE THE CONTRACTOR IS TAKING IT SHOULD BE NOTED IN THE SUBMISSION OF THEIR PROPOSAL. Points of Contact: CWO Archibald Newland Engineer Officer USCGC WILLOW (WLB 202) 1050 Register St. North Charleston, SC 29405 Work 843-529-0158 Email: Archibald.Newland@uscg.mil LCDR Rober M Tolliver Commanding Officer USCGC WILLOW (WLB 202) 1050 Register St North Charleston, SC. 29405 Work- 202-372-1506 Email: robert.m.tolliver2@uscg.mil Product Line Support: LT Maxwell Regan 443-764-4921 Maxwell.j.regan@uscg.mil

From Combined Synopsis/Solicitation posted on Sep 09, 2025

Notice history

1
  1. Combined Synopsis/Solicitation LATEST Posted Sep 09, 2025 View

Details

Solicitation number 70Z08525Q0030284
Notice ID d550c4c7f6da4309b0326ae5a1681228
Notice type Combined Synopsis/Solicitation
Product / Service (PSC) J020
NAICS 336611
Place of performance South Carolina
Archive date Oct 01, 2025

Award Information

Not yet awarded

Documents

1
View on SAM.gov

Contacts

primary
Justin Wooldridge

Email

Phone

secondary
Lindsay Mongiovi

Email

Phone

Agency

HOMELAND SECURITY, DEPARTMENT OF
US COAST GUARD
SFLC PROCUREMENT BRANCH 2(00085)

Place of Performance

South Carolina 29405
USA

Dates

Posted Sep 09, 2025 10 months ago
Last Updated Aug 06, 2026 1 day ago
Due Sep 16, 2025 10 months ago