Solicitation 70Z08525Q0020473 Copied Notice ID 2b8af2a3ccf94ef0b54f5592d81e3955 Copied HOMELAND SECURITY, DEPARTMENT OF — SFLC PROCUREMENT BRANCH 2(00085)
SAM.gov
Posted
Jul 23, 2025
Deadline
Jul 28, 2025
Set-aside
SBA
NAICS
336611
PSC
J020

Summary

AI-generated · Aug 24, 2025

Replace both galley ovens in CGC Willow: remove the existing ovens and install new units PN R36C-ATBM and R36C-ATDM. The contractor must disconnect electrical wiring and interferences, remove and dispose of the old ovens, and install and reconnect electrical, piping (if needed), panels, and all interfaces. Include startup and test, and provide access information for FLETC. Site visits are required before quotes are accepted to verify scope. Adhere to OSHA safety requirements (29 CFR 1926), provide barriers and fall protection as needed, keep the site clean, and dispose of waste off Government property. Coordinate with the unit to plan the replacement so the galley can be closed, and complete all work within 30 days of award, with on-site work limited to 14 days and scheduled at least two weeks in advance. If additional work is needed, notify the Engineering Officer for guidance; pricing must certify that the quoted price covers the stated requirements; any damage caused during work must be repaired in kind at the contractor’s expense; access forms and unit points of contact will be provided in the award package.

Change noted: the solicitation posting date has been extended.

DEPARTMENT OF HOMELAND SECURITY UNITED STATES COAST GUARD CGC Willow Galley Range Replacement POP 28July25-31-Jul2025 USCGC WILLOW (WLB-202) 1050 Register St N. Charleston, SC 29405 Project Specification For Replacement of Galley Ovens Scope of Work INTRODUCTION Both ovens in the galley require replacement. Ovens have been procured by CGC WILLOW. SITE VISIT Site visits are necessary before quotes involving services can be accepted and to ensure proper information and accurate scope of work. SCOPE OF WORK The Contractor shall be responsible for the following services, start-up and/or training: Located in the Galley, contractor will remove old ovens and install new ovens PN: R36C-ATBM and R36C-ATDM. Contractor will remove interferences and disconnect electrical wiring, Contractor will remove and dispose of old ovens. Contractor will install and reconnect all connections including electrical, piping if need, panels and all other interferences that were removed. Contractor will perform start up and test. Contractor will haul away any trash that may result from the work and leave the space just as it was before they arrived. Contractor will provide necessary information for access to FLETC. GENERAL DISPOSITIONS 1.0 BASE ENTRY Contractor will receive form from unit to fill out for every contractor to be able to access FLETC. 2.0 WORK SITE CONDITIONS 2.1 The Contractor shall take all necessary precautions to adequately protect all personnel, public and private property from harm within the areas of work. During the execution of this contract, the Contractor shall conform to the rules and regulations as set forth by OSHA Safety and Health Standards, 29 CFR Part 1926 - Safety and Health Regulations for Construction. The contractor shall provide barriers, temporary fencing, covers, fall protection, etc. wherever work could cause injury to workers, visitors, Coast Guard personnel, or dependents. 2.2 The Contractor shall keep the project site clean and free of clutter when work is not performed at the site. Remove rubbish and debris from the site on a daily basis, do not allow it to accumulate inside or outside of the work area. 2.3 Refuse, excess or waste materials resulting from work operations shall become the property of the Contractor and shall be recycled and/or disposed of off Government property. All refuse or recycling disposal shall be done in accordance with federal, state, and local laws and regulations. 3.0 MAINTENANCE SERVICES 3.1 If additional work is required over and above the herein specified, the Contractor shall notify the Engineering Officer for appropriate decision and action. 4.0 PROJECT COMPLETION/PERIOD OF PERFORMACE 4.1 All portion of existing work that has been damaged or altered in any way during performance of work shall be repaired or replaced in kind, in an approved manner, to match existing adjoining work. All work of this nature shall be performed by the Contractor at their expense and left in a condition similar to that which existed prior to the start of the work. 4.2 The Contractor shall have a maximum of thirty (30) calendar days after contract award to complete the project. 4.3 The Contractor shall work with unit to plan the replacement and ensure unit is able to close galley. 4.4 On site work shall last no more than fourteen (14) calendar days and is required to be scheduled a minimum of two (2) weeks in advance. 5.0 PRICING VALIDITY 5.1 Vendor quote must include the following statement: "Vendor has reviewed the customer's SOW and certifies that the price covers the customer's requirement. No additional funds will be required." 6.0 Unit POC 9.1 CGC WILLOW EO, CWO Archibald Newland (843)-529-0158 9.2 CGC WILLOW Aux chief, MKC Andrew Clapp (843)-529-0158 9.3 CGC WILLOW Electrical chief, EMC Calvin Norris (843)-529-0158

From Combined Synopsis/Solicitation posted on Jul 09, 2025

***Extended the Solicitation date to 07/28/2025 at 0800 DEPARTMENT OF HOMELAND SECURITY UNITED STATES COAST GUARD CGC Willow Galley Range Replacement POP 28July25-31-Jul2025 USCGC WILLOW (WLB-202) 1050 Register St N. Charleston, SC 29405 Project Specification For Replacement of Galley Ovens Scope of Work INTRODUCTION Both ovens in the galley require replacement. Ovens have been procured by CGC WILLOW. SITE VISIT Site visits are necessary before quotes involving services can be accepted and to ensure proper information and accurate scope of work. SCOPE OF WORK The Contractor shall be responsible for the following services, start-up and/or training: Located in the Galley, contractor will remove old ovens and install new ovens PN: R36C-ATBM and R36C-ATDM. Contractor will remove interferences and disconnect electrical wiring, Contractor will remove and dispose of old ovens. Contractor will install and reconnect all connections including electrical, piping if need, panels and all other interferences that were removed. Contractor will perform start up and test. Contractor will haul away any trash that may result from the work and leave the space just as it was before they arrived. Contractor will provide necessary information for access to FLETC. GENERAL DISPOSITIONS 1.0 BASE ENTRY Contractor will receive form from unit to fill out for every contractor to be able to access FLETC. 2.0 WORK SITE CONDITIONS 2.1 The Contractor shall take all necessary precautions to adequately protect all personnel, public and private property from harm within the areas of work. During the execution of this contract, the Contractor shall conform to the rules and regulations as set forth by OSHA Safety and Health Standards, 29 CFR Part 1926 - Safety and Health Regulations for Construction. The contractor shall provide barriers, temporary fencing, covers, fall protection, etc. wherever work could cause injury to workers, visitors, Coast Guard personnel, or dependents. 2.2 The Contractor shall keep the project site clean and free of clutter when work is not performed at the site. Remove rubbish and debris from the site on a daily basis, do not allow it to accumulate inside or outside of the work area. 2.3 Refuse, excess or waste materials resulting from work operations shall become the property of the Contractor and shall be recycled and/or disposed of off Government property. All refuse or recycling disposal shall be done in accordance with federal, state, and local laws and regulations. 3.0 MAINTENANCE SERVICES 3.1 If additional work is required over and above the herein specified, the Contractor shall notify the Engineering Officer for appropriate decision and action. 4.0 PROJECT COMPLETION/PERIOD OF PERFORMACE 4.1 All portion of existing work that has been damaged or altered in any way during performance of work shall be repaired or replaced in kind, in an approved manner, to match existing adjoining work. All work of this nature shall be performed by the Contractor at their expense and left in a condition similar to that which existed prior to the start of the work. 4.2 The Contractor shall have a maximum of thirty (30) calendar days after contract award to complete the project. 4.3 The Contractor shall work with unit to plan the replacement and ensure unit is able to close galley. 4.4 On site work shall last no more than fourteen (14) calendar days and is required to be scheduled a minimum of two (2) weeks in advance. 5.0 PRICING VALIDITY 5.1 Vendor quote must include the following statement: "Vendor has reviewed the customer's SOW and certifies that the price covers the customer's requirement. No additional funds will be required." 6.0 Unit POC 9.1 CGC WILLOW EO, CWO Archibald Newland (843)-529-0158 9.2 CGC WILLOW Aux chief, MKC Andrew Clapp (843)-529-0158 9.3 CGC WILLOW Electrical chief, EMC Calvin Norris (843)-529-0158

From Combined Synopsis/Solicitation posted on Jul 23, 2025

Notice history

2
  1. Combined Synopsis/Solicitation Posted Jul 09, 2025 View
  2. Combined Synopsis/Solicitation LATEST Posted Jul 23, 2025
    • Description: Description was updated
    • Response Deadline: Jul 23, 2025Jul 28, 2025

Details

Solicitation number 70Z08525Q0020473
Notice ID 2b8af2a3ccf94ef0b54f5592d81e3955
Notice type Combined Synopsis/Solicitation
Product / Service (PSC) J020
NAICS 336611
Place of performance North Charleston, South Carolina
Archive date Aug 12, 2025

Award Information

Not yet awarded

Documents

1
View on SAM.gov

Contacts

primary
Justin Wooldridge

Email

Phone

secondary
Lindsay Mongiovi

Email

Phone

Agency

HOMELAND SECURITY, DEPARTMENT OF
US COAST GUARD
SFLC PROCUREMENT BRANCH 2(00085)

Place of Performance

North Charleston, South Carolina 29405
USA

Dates

Posted Jul 23, 2025 1 year ago
Last Updated Aug 06, 2026 1 day ago
Due Jul 28, 2025 1 year ago