USCGC Walnut Door and Scuttles 70Z08525Q0020638
Summary
AI-generated · Aug 25, 2025Fabricate watertight components for CGC Walnut as listed in Table 1: one weather-tight steel door (26 x 66, right-hand, with hasp) to be installed at the Buoy Deck Control Booth (PN 01-26-0-C, quantity 1) and one raised, quick-acting watertight scuttle (21 in. dia, at Escape Trunk) (PN 1-19-2-T, quantity 1). Construction must follow the referenced Coast Guard drawings (225 WLM 167-001, Rev W; 225 WLM 631-002, Rev B) and comply with the Surface Forces Logistics Center standards and related specifications listed in the SOW (SFLC 0000 General Requirements, SFLC 0740 Welding and Allied Processes, SFLC 6310 Preservation of Ship Structures), as well as applicable coatings, blasting media, and surface-prep references.
All fabrication and testing must be performed per the listed references, with testing conducted in accordance with SFLC Std Spec 0740. The contractor must construct a shipping container for the doors and hatches and provide shipping pricing to CGC Walnut, Pensacola, FL 32508. Government-furnished drawings will be provided free of charge, and no government property is listed as required.
CGC Walnut doors and scuttles RDD: 1/13/2026 Please see SOW in attachments Consolidated List of References The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at the time of specification writing and during contract execution. All Coast guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed free of charge from links located on the SFLC website. Commercial sites provide access to their respective documents. COAST GUARD DRAWINGS Coast Guard Drawing 225 WLM 167-001, Rev W, 1997, Structural Closures Coast Guard Drawing 225 WLM 631-002, Rev B, 2019, Paint Schedule COAST GUARD PUBLICATIONS Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors Manual Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and Allied Processes Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures OTHER REFERENCES Code of Federal Regulations (CFR) Title 29, Part 1915, Occupational Safety and Health Standards for Shipyard Employment Commercial Item Description (CID) A-A-59316, 2016, Abrasive Materials; for Blasting Military Specification MIL-A-22262B, March 1996, Abrasive Blasting Media Ship Hull Blast Cleaning NAVSEA Technical Publication T9074-AD-GIB-010/1688, (TP 1688), July 2012, Requirements for Fabrication, Welding, and Inspection of Submarine Structure The Society for Protective Coatings (SSPC) Surface Preparation Standard No. 11 (SSPC-SP 11), 2013, Power-Tool Cleaning to Bare Metal The Society for Protective Coatings (SSPC)/NACE International (NACE) 2007, Joint Surface Preparation Standard SSPC-SP 10/NACE No. 2, Near-White Metal Blast Cleaning ITEM 1: Fabrication of Watertight Door and Scuttle 1. SCOPE 1.1 Intent. This work item describes the requirements for the Contractor to fabricate watertight doors, hatches, and scuttles identified in Table 1 in accordance with drawings and references. Table 1 - Watertight Doors and Scuttle locations Description Location P/N and Description QTY Drawing Weathertight Door (01-27-1) 01-26-0-C Buoy Deck Control Booth PN: 20 Weathertight Steel Door 26 x66 , Right Hand, w/ hasp and staple 01 Each 225 WLM 167-001 Raised Watertight Quick Acting Scuttle (01-20-2) Escape Trunk (1-19-2-T) PN: 6 Scuttle 21 Dia C.O. Raised, Quick-acting, Watertight 01 Each 225 WLM 167-001 1.2 Government-furnished property None 2. REFERENCES Coast Guard Drawings Coast Guard Drawing 225 WLM 167-001, Rev W, 1997, Structural Closures Coast Guard Drawing 225 WLM 631-002, Rev B, 2019, Paint Schedule Coast Guard Publications Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and Allied Processes Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures Other References Commercial Item Description (CID) A-A-59316, 2016, Abrasive Materials; for Blasting Military Specification MIL-A-22262B, March 1996, Abrasive Blasting Media Ship Hull Blast Cleaning The Society for Protective Coatings (SSPC)/NACE International (NACE) 2007, Joint Surface Preparation Standard SSPC-SP 10/NACE No. 2, Near-White Metal Blast Cleaning The Society for Protective Coatings (SSPC) Surface Preparation Standard No. 11 (SSPC-SP 11), 2013, Power-Tool Cleaning to Bare Metal 3. REQUIREMENTS 3.1 General. 3.1.1 CIR. None. 3.1.2 Tech Rep. Not applicable. 3.1.3 Protective measures. Not Applicable 3.1.4 Interferences. Not Applicable 3.1.5 Fabrication. Contractor shall fabricate the door and scuttle listed in Table 1 and in accordance with the references listed in section 2 of this document. 3.1.6 Testing. All testing to be completed in accordance with drawings and Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and Allied Processes. 3.1.7 Shipping. Contractor shall construct container to ship doors and hatches and must include pricing for shipping to CGC WALNUT, CO LTJG Daniel Zarillo, USCGC WALNUT (WLB 205), 211 South Ave Suite C, Pensacola, FL, 32508. 4. NOTES None.
From Combined Synopsis/Solicitation posted on Jul 21, 2025Notice history
1Details
Award Information
Not yet awarded
Contacts
Phone
Phone
Agency
Place of Performance
USA