Contacts, documents and full notice history are available with a subscription.
Combined Synopsis/Solicitation SBA Expired 4 notices 11 documents

USCGC WAESCHE FQ3 FY26 Dock Side (DS) 70Z08526QLREP0007

Solicitation 70Z08526QLREP0007 Copied Notice ID 6d136cc25d1c4aaab080fc7ca04ba1f4 Copied HOMELAND SECURITY, DEPARTMENT OF — SFLC PROCUREMENT BRANCH 2(00085)
SAM.gov
Posted
Jan 28, 2026
Deadline
Jan 30, 2026
Set-aside
SBA
NAICS
336611
PSC
J020

Summary

AI-generated · Jan 09, 2026

Contractor shall provide all labor, services, supplies, materials, equipment power, accessories, personnel, and other items necessary to perform dockside repairs to the USCGC WAESCHE (WMSL-751), a 418-foot National Security Cutter, in accordance with the solicitation, schedule, and specifications.

Work spans multiple systems and spaces, including cleaning and inspecting aviation fuel service tanks, MP fuel tanks, ballast tanks, grey-water and sewage holding tanks and associated piping; cleaning, flushing, and piping repairs; inspection and testing of the Talon Grid and fire detection system; fore-deck tenting; renewal or installation of deck coverings (slip-resistant and polymeric); deck repair and sealing; full preservation of decks; dry provision storeroom modifications; fire-prevention measures; and provision of temporary services.

This requirement is for the Contractor to provide all necessary labor, services, supplies, materials, equipment power, accessories, personnel, and other things as necessary, except otherwise specified to perform dockside repairs to the USCGC WAESCHE (WMSL-751), a 418-foot National Security Cutter in accordance with the solicitation, schedule, and specifications. Work includes, but is not limited to the following: D-001 Tanks (Aviation Fuel Service), Clean and Inspect O-002 Tanks, Partial Preserve (30%) D-003 Tanks (MP Fuel Stowage and Overflow), Clean and Inspect D-004 Tanks (MP Fuel Service), Clean and Inspect D-005 Tanks (Ballast), Clean and Inspect D-006 Grey Water Holding Tank(s) and Lift Stations, Clean and Inspect D-007 Sewage Holding Tank(s), Clean and Inspect D-008 Sewage Piping, Clean, Flush and Pipe Repair D-009 Talon Grid (Type 18-08), Inspect and Test D-010 Fire Detection System Inspect and Test D-011 Tenting (Fore Deck), Provide D-012 Deck Covering (Slip-Resistant) Fore Deck, Renew D-013 Deck Covering (Polymeric), Renew D-014 Deck Covering (Polymeric), Repair and Seal D-015 Decks, Full Preservation D-016 Dry Provision Storeroom, Modify D-017 Fire Prevention, Provide D-018 Temporary Services, Provide

From Combined Synopsis/Solicitation posted on Jan 08, 2026

This requirement is for the Contractor to provide all necessary labor, services, supplies, materials, equipment power, accessories, personnel, and other things as necessary, except otherwise specified to perform dockside repairs to the USCGC WAESCHE (WMSL-751), a 418-foot National Security Cutter in accordance with the solicitation, schedule, and specifications. Work includes, but is not limited to the following: D-001 Tanks (Aviation Fuel Service), Clean and Inspect O-002 Tanks, Partial Preserve (30%) D-003 Tanks (MP Fuel Stowage and Overflow), Clean and Inspect D-004 Tanks (MP Fuel Service), Clean and Inspect D-005 Tanks (Ballast), Clean and Inspect D-006 Grey Water Holding Tank(s) and Lift Stations, Clean and Inspect D-007 Sewage Holding Tank(s), Clean and Inspect D-008 Sewage Piping, Clean, Flush and Pipe Repair D-009 Talon Grid (Type 18-08), Inspect and Test D-010 Fire Detection System Inspect and Test D-011 Tenting (Fore Deck), Provide D-012 Deck Covering (Slip-Resistant) Fore Deck, Renew D-013 Deck Covering (Polymeric), Renew D-014 Deck Covering (Polymeric), Repair and Seal D-015 Decks, Full Preservation D-016 Dry Provision Storeroom, Modify D-017 Fire Prevention, Provide D-018 Temporary Services, Provide Amendment 0001: the following questions were received in response to this solicitation. A revised Specification file is added to the files. The three (3) questions and responses received are: Item 18, Table 1 has both Storage General and Dry Stores selected for KTR to provide. Does USG intend for KTR to provide a storage facility for each of these Table 1-line items, or only one storage facility that satisfies SFLC Std Spec 8635 para 3.3.14.5 and Table 7 (Dry Stores)? KTR may use one facility that satisfies those requirements for Storage General and Dry Stores in 8635 para 3.3.14.5 Table 7. D-008: Specification references chemical SDS s in 3.3 but does not require chemical cleaning. Historically due to system design, mechanically cleaning is not sufficient to clean this system. Is mechanically cleaning an option or will chemical cleaning be required (KTR recommends)? The intent is to require chemical cleaning. We worded the spec that way because we couldn t require a specific product, but rather a type/quality of product, hence Rydlyme or equivalent. It was an oversight to not specify it must be chemical cleaning. D-018: Should contractor plan to have temp services only for the duration of sewage pipe cleaning in D-008 or for complete duration of project due to unknown amount of affected piping repairs in para 3.7.2? KTR shall provide temp services for the time required to perform the following: Full sewage pipe cleaning Renewal of 14 known pipe sections in Table 1 (37 ft) CG acknowledges the unknown time required to repair the additional 50 feet of piping referenced in para 3.7.2, due to factors such as location, interferences, etc. KTR proposals shall include the cost of piping and fittings. Additional labor and time required for temp services may be subject to a CR following inspections IAW para 3.6 and 3.6.1, if additional repairs cannot be completed during the duration of repairs IAW base SOW.

From Combined Synopsis/Solicitation posted on Jan 16, 2026

01/27/26 - Amendment No. A002 is hereby issued and is attached to this requirement. Please see ATTACHMENTS/LINKS. This requirement is for the Contractor to provide all necessary labor, services, supplies, materials, equipment power, accessories, personnel, and other things as necessary, except otherwise specified to perform dockside repairs to the USCGC WAESCHE (WMSL-751), a 418-foot National Security Cutter in accordance with the solicitation, schedule, and specifications. Work includes, but is not limited to the following: D-001 Tanks (Aviation Fuel Service), Clean and Inspect O-002 Tanks, Partial Preserve (30%) D-003 Tanks (MP Fuel Stowage and Overflow), Clean and Inspect D-004 Tanks (MP Fuel Service), Clean and Inspect D-005 Tanks (Ballast), Clean and Inspect D-006 Grey Water Holding Tank(s) and Lift Stations, Clean and Inspect D-007 Sewage Holding Tank(s), Clean and Inspect D-008 Sewage Piping, Clean, Flush and Pipe Repair D-009 Talon Grid (Type 18-08), Inspect and Test D-010 Fire Detection System Inspect and Test D-011 Tenting (Fore Deck), Provide D-012 Deck Covering (Slip-Resistant) Fore Deck, Renew D-013 Deck Covering (Polymeric), Renew D-014 Deck Covering (Polymeric), Repair and Seal D-015 Decks, Full Preservation D-016 Dry Provision Storeroom, Modify D-017 Fire Prevention, Provide D-018 Temporary Services, Provide Amendment 0001: the following questions were received in response to this solicitation. A revised Specification file is added to the files. The three (3) questions and responses received are: Item 18, Table 1 has both Storage General and Dry Stores selected for KTR to provide. Does USG intend for KTR to provide a storage facility for each of these Table 1-line items, or only one storage facility that satisfies SFLC Std Spec 8635 para 3.3.14.5 and Table 7 (Dry Stores)? KTR may use one facility that satisfies those requirements for Storage General and Dry Stores in 8635 para 3.3.14.5 Table 7. D-008: Specification references chemical SDS s in 3.3 but does not require chemical cleaning. Historically due to system design, mechanically cleaning is not sufficient to clean this system. Is mechanically cleaning an option or will chemical cleaning be required (KTR recommends)? The intent is to require chemical cleaning. We worded the spec that way because we couldn t require a specific product, but rather a type/quality of product, hence Rydlyme or equivalent. It was an oversight to not specify it must be chemical cleaning. D-018: Should contractor plan to have temp services only for the duration of sewage pipe cleaning in D-008 or for complete duration of project due to unknown amount of affected piping repairs in para 3.7.2? KTR shall provide temp services for the time required to perform the following: Full sewage pipe cleaning Renewal of 14 known pipe sections in Table 1 (37 ft) CG acknowledges the unknown time required to repair the additional 50 feet of piping referenced in para 3.7.2, due to factors such as location, interferences, etc. KTR proposals shall include the cost of piping and fittings. Additional labor and time required for temp services may be subject to a CR following inspections IAW para 3.6 and 3.6.1, if additional repairs cannot be completed during the duration of repairs IAW base SOW.

From Combined Synopsis/Solicitation posted on Jan 27, 2026

01/27/26 - Amendment No. A002 is hereby issued and is attached to this requirement. Please see ATTACHMENTS/LINKS. This requirement is for the Contractor to provide all necessary labor, services, supplies, materials, equipment power, accessories, personnel, and other things as necessary, except otherwise specified to perform dockside repairs to the USCGC WAESCHE (WMSL-751), a 418-foot National Security Cutter in accordance with the solicitation, schedule, and specifications. Work includes, but is not limited to the following: D-001 Tanks (Aviation Fuel Service), Clean and Inspect O-002 Tanks, Partial Preserve (30%) D-003 Tanks (MP Fuel Stowage and Overflow), Clean and Inspect D-004 Tanks (MP Fuel Service), Clean and Inspect D-005 Tanks (Ballast), Clean and Inspect D-006 Grey Water Holding Tank(s) and Lift Stations, Clean and Inspect D-007 Sewage Holding Tank(s), Clean and Inspect D-008 Sewage Piping, Clean, Flush and Pipe Repair D-009 Talon Grid (Type 18-08), Inspect and Test D-010 Fire Detection System Inspect and Test D-011 Tenting (Fore Deck), Provide D-012 Deck Covering (Slip-Resistant) Fore Deck, Renew D-013 Deck Covering (Polymeric), Renew D-014 Deck Covering (Polymeric), Repair and Seal D-015 Decks, Full Preservation D-016 Dry Provision Storeroom, Modify D-017 Fire Prevention, Provide D-018 Temporary Services, Provide Amendment 0001: the following questions were received in response to this solicitation. A revised Specification file is added to the files. The three (3) questions and responses received are: Item 18, Table 1 has both Storage General and Dry Stores selected for KTR to provide. Does USG intend for KTR to provide a storage facility for each of these Table 1-line items, or only one storage facility that satisfies SFLC Std Spec 8635 para 3.3.14.5 and Table 7 (Dry Stores)? KTR may use one facility that satisfies those requirements for Storage General and Dry Stores in 8635 para 3.3.14.5 Table 7. D-008: Specification references chemical SDS s in 3.3 but does not require chemical cleaning. Historically due to system design, mechanically cleaning is not sufficient to clean this system. Is mechanically cleaning an option or will chemical cleaning be required (KTR recommends)? The intent is to require chemical cleaning. We worded the spec that way because we couldn t require a specific product, but rather a type/quality of product, hence Rydlyme or equivalent. It was an oversight to not specify it must be chemical cleaning. D-018: Should contractor plan to have temp services only for the duration of sewage pipe cleaning in D-008 or for complete duration of project due to unknown amount of affected piping repairs in para 3.7.2? KTR shall provide temp services for the time required to perform the following: Full sewage pipe cleaning Renewal of 14 known pipe sections in Table 1 (37 ft) CG acknowledges the unknown time required to repair the additional 50 feet of piping referenced in para 3.7.2, due to factors such as location, interferences, etc. KTR proposals shall include the cost of piping and fittings. Additional labor and time required for temp services may be subject to a CR following inspections IAW para 3.6 and 3.6.1, if additional repairs cannot be completed during the duration of repairs IAW base SOW. Amendment 0002 extends the close of this solicitation out to Friday 1/30/2026 at 10:00 PST.

From Combined Synopsis/Solicitation posted on Jan 28, 2026

Notice history

4
  1. Combined Synopsis/Solicitation Posted Jan 08, 2026 View
  2. Combined Synopsis/Solicitation Posted Jan 16, 2026
    • Description: Description was updated
  3. Combined Synopsis/Solicitation Posted Jan 27, 2026
    • Description: Description was updated
    • Response Deadline: Jan 28, 2026Jan 30, 2026
  4. Combined Synopsis/Solicitation LATEST Posted Jan 28, 2026
    • Description: Description was updated

Details

Solicitation number 70Z08526QLREP0007
Notice ID 6d136cc25d1c4aaab080fc7ca04ba1f4
Notice type Combined Synopsis/Solicitation
Product / Service (PSC) J020
NAICS 336611
Place of performance Alameda, California
Archive date Feb 14, 2026

Award Information

Not yet awarded

Contacts

primary
William Zittle

Email

Phone

secondary
Valerie S Rivera-Chase

Email

Phone

Agency

HOMELAND SECURITY, DEPARTMENT OF
US COAST GUARD
SFLC PROCUREMENT BRANCH 2(00085)

Place of Performance

Alameda, California 94501
USA

Dates

Posted Jan 28, 2026 6 months ago
Last Updated Aug 06, 2026 2 days ago
Due Jan 30, 2026 6 months ago