Contacts, documents and full notice history are available with a subscription.
Special Notice SBA Expired 1 notice 1 document

USCGC Stone- Supply Fan motor repair 70Z08525Q00020128

Solicitation 70Z08525Q00020128 Copied Notice ID 60bc504a05f74faaafc29fdef86d6d63 Copied HOMELAND SECURITY, DEPARTMENT OF — SFLC PROCUREMENT BRANCH 2(00085)
SAM.gov
Posted
Jun 23, 2025
Deadline
Jun 28, 2025
Set-aside
SBA
NAICS
336611
PSC
J020

Summary

AI-generated · Aug 23, 2025

Repair the supply fan motor for CGC Stone (3-phase 440 VAC, 60 Hz, CCW rotation, 1800 CFM; P/N XA20A4W5) whose windings have failed. Perform a full motor repair to return a working unit, including disassembly, mechanical inspection, cleaning, bearing/journal work, windings data collection, winding removal, core loss testing, cleaning and sandblasting, lead repair or replacement, stator rewind/repair, coil manufacture, dip/bake/vpi, post-bake cleaning, dynamic balancing, re-assembly, post-test no-load run, painting, and pre-ship quality inspection. Include materials such as the specified bearings, seal, and winding wire. Deliver the repaired motor back to the Coast Guard by the required date, to the designated shipyard location.

Security and access requirements: contractor personnel must obtain access to FLETC Base Charleston with a valid Real ID, with forms provided for base access; a CG representative may sponsor and escort the vendor to the cutter for delivery/return.

Statement of Work (SOW) for supply fan motor for CGC Stone. Background. The supply fan motor onboard CGC Stone has bad windings requiring the motor to be repaired. Scope. Conduct repair on Qty: 1, P/N: XA20A4W5, NIIN: 016035356, Name: FAN 3 PHASE, 440 VAC, 60HZ, CCW ROTATION, 1800 CFM. 6 IMP BLADES, 20/6 HP. Objective. The objective of this requirement is to repair the supply fan after findings of failed motor windings. Conduct at least the following to return to the Coast Guard a working motor: must be returned to the below address by 07JUL25. Disassemble and visually inspect Mechanical inspection Incoming electrical testing Thoroughly clean all parts Repair de bearing journal Take winding data Strip winding Core loss test Sandblast Repair/replace leads Rewind/repair stator Manufacture coils Dip/bake/vpi Post bake - clean parts Dynamically balance Re-assemble Post testing no-load run Paint Pre-ship quality inspection Materials: 6210 ball bearing 1, 6212 ball bearing 1, Seal 1, Winding wire and materials Security Requirement. FLETC Base Charleston access is required. Vendor shall have a valid Real ID compliant form of ID and show identification. Forms will be provided for base access. A CG representative from the cutter may sponsor and escort vendor to the cutter. Delivery Address: USCGC STONE (WMSL 758) ATTN: Discrep 25042 1050 Register St. N. Charleston, SC 29405 Required Delivery Date. 07JUL25 Points of Contact. USCG-SFLC-LREPL Asset Management: MKCM Bryan Briggs Bryan.P.Briggs@uscg.mil (510) 418-2223

From Special Notice posted on Jun 23, 2025

Notice history

1
  1. Special Notice LATEST Posted Jun 23, 2025 View

Details

Solicitation number 70Z08525Q00020128
Notice ID 60bc504a05f74faaafc29fdef86d6d63
Notice type Special Notice
Product / Service (PSC) J020
NAICS 336611
Place of performance North Charleston, South Carolina
Archive date Jul 13, 2025

Award Information

Not yet awarded

Documents

1
View on SAM.gov

Contacts

primary
Justin Wooldridge

Email

Phone

secondary
Lindsay Mongiovi

Email

Phone

Agency

HOMELAND SECURITY, DEPARTMENT OF
US COAST GUARD
SFLC PROCUREMENT BRANCH 2(00085)

Place of Performance

North Charleston, South Carolina 29405
USA

Dates

Posted Jun 23, 2025 1 year ago
Last Updated Aug 06, 2026 1 day ago
Due Jun 28, 2025 1 year ago