USCGC Stone AC condenser re-tube 70Z08526Q00023878
Summary
AI-generated · Mar 25, 2026Repair and re-tube the B-side condenser on USCGC Stone’s #1 air conditioning skid after a failure that caused saltwater intrusion, restoring a vital cooling redundancy for electronics and mission-critical support equipment. The work must follow Coast Guard vessel repair standards, including welding, brazing, and nondestructive examination per the specified SFLC standards; procure all non-government-furnished materials as needed.
Contractors may perform the work at their own facility within 1000 miles of North Charleston, SC, with the condenser shipped to the contractor and then returned to USCGC Stone in North Charleston. Compliance requirements include adherence to SFLC Std Spec 0000 and 0740 (and related general standards), and Joint Certification Program (JCP) registration through DLA to release references. Coordinate with the SFLC-LREPL Asset Manager for technical details.
General Requirements USCGC STONE is currently experiencing a failure of the B side condenser on the #1 A/C skid. The condenser failed causing saltwater intrusion through the entire B side of the system. The condenser provides vital redundancy to the cooling system for electronics support equipment critical to the operation of their mission. 1. SCOPE 1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed by commercial contractors for Coast Guard vessels. 2. REFERENCES COAST GUARD DRAWINGS None COAST GUARD PUBLICATIONS Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and Allied Processes Surface Forces Logistics Center Standard Specification 5550 (SFLC Std Spec 5550), 2022, Fire Prevention and Response OTHER REFERENCES None 3. REQUIREMENTS 3.1 General. The Contractor must conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability. The requirement of this WI applies to all work under the scope of this contract, whether explicitly stated in all following work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract. 3.2 Welding and brazing requirements. The Contractor must perform all welding and allied processes, and NDE in accordance with SFLC Std Spec 0740. 3.3 Materials. The Contractor must obtain all the materials required to complete this job except for the Government-furnished Property shown in Paragraph 1.2 of Work Item 1, if any specified. 3.4 Period of Performance. The period of performance for this requirement starts on 31 MAR 2026 and ends on 13 APR 2026. 3.5 Location. Condenser is currently located at USCG base in North Charleston, SC. The contractor may perform the required work at their repair facilities, if the facility is within 1000 miles of the CG base. The CG will ship the condenser to the contractor s facility. Contractor is responsible for returning condenser to the following address. USCGC STONE, 1050 Register St, North Charleston SC 29405. 3.6 Release of References. For any listed references to be distributed, the contractor must be registered in the Joint Certification Program (JCP) through Defense Logistics Agency (DLA) and provide your JCP number and expiration date to the listed point of contact (POC) for this work. 3.7 Points of Contact. The USCG Technical POCs for this requirement include but are not limited to the following: 3.7.1 SFLC-LREPL Asset Manager, LTJG Justin Waters, Justin.l.waters@uscg.mil
From Combined Synopsis/Solicitation posted on Mar 24, 2026Notice history
1Details
Award Information
Not yet awarded
Contacts
Phone
Phone
Agency
Place of Performance