USCGC Scioto Replacement Firepump 70Z08526Q0002462
Summary
AI-generated · Feb 10, 2026Locate, provide and ship a new fire-pump to replace the existing obsolete pump (Peerless P/N 3TU135A2) on USCGC Scioto. The replacement must match the current footprint, rotation, differential head pressure, flow rate, and RPM, specifically 240 gpm, 300 tdh, left-hand (CCW) rotation, with 4-inch suction and 3-inch discharge, Ni-Al-Brz construction. Replacement parameters are Peerless Express 25.6.0 / Peerless model 3TU135A2, 2-stage, CCW rotation. Referenced drawings for foundation and related systems include Coast Guard Drawing 100A CBG 1112-002, Rev -, Coast Guard Drawing 100B CBG 1112-002, Rev 1, and Coast Guard Drawing 100B CBG 4802-001, Rev 1.
USCGC SCIOTO REPLACEMENT FIREPUMP USCGC SCIOTO (WLR-65504) 221 Mississippi Dr. Keokuk, IA 52632 SCOPE: Locate, provide and ship a new fire-pump to replace the existing, (obsolete fire-pump - Peerless P/N 3TU135A2) that matches the same footprint, rotation, differential head pressure, flow rate and RPM as the existing pump. **Fire Pump, 240 gpm, 300 tdh, LH rotate, 4in suction, 3in discharge, Ni-Al-Brz The replacement pump parameters shall be as follows: Peerless Express 25.6.0 / Pierless model 3TU135A2 2 stage Counterclockwise rotation. (LH) Reference Drawings Coast Guard Drawing 100A CBG 1112-002, Rev -, Engine Foundation for 100 -0 x30 -0 x6 -6 Spec Barge Coast Guard Drawing 100B CBG 1112-002, Rev 1, Miscellaneous Foundation Coast Guard Drawing 100B CBG 4802-001, Rev 1, Jetting Fire & Bilge System
From Combined Synopsis/Solicitation posted on Feb 09, 2026Notice history
1-
Combined Synopsis/Solicitation LATEST Posted Feb 09, 2026
Details
Award Information
Not yet awarded
Contacts
Phone
Phone
Agency
Place of Performance
USA