USCGC Polar Star Boiler Inspection 70Z08525Q0020189

Solicitation 70Z08525Q0020189 Copied Notice ID 1e6956c75808411d816b946cfd0e48e6 Copied HOMELAND SECURITY, DEPARTMENT OF — SFLC PROCUREMENT BRANCH 2(00085)
SAM.gov
Posted
Jul 14, 2025
Deadline
Jul 17, 2025
Set-aside
SBA
NAICS
336611
PSC
J020

Summary

AI-generated · Aug 24, 2025

Investigate and inspect the #2 boiler fireside, determine and document the leak, inspect the rest of the fireside and pressure-containing components for integrity, and provide repair recommendations. Work occurs aboard the USCGC Polar Star in Mare Island Drydock, with an on-site NBIC-commissioned inspector (R endorsement) to inspect the boiler and any repairs, plus a qualified refractory/boiler tech representative to review refractory and firebox components and advise repairs. The contractor must implement protective measures, manage interferences (e.g., insulation), dispose of residual fluids with chain-of-custody, and submit a Fire Prevention Plan. A hydrostatic test plan per NBIC Part 2 is required, addressing a 150 psi design working pressure, submitted for approval and performed in the presence of a Coast Guard inspector with results documented. The fireside must be cleaned, inspected, and the boiler reassembled to its original condition, with renewal of mud/steam drum gaskets and disturbed insulation, plus a CFR detailing damage, recommended corrective actions, and causes, followed by touch-up coatings per SFLC 6310.

The second notice updates and extends the solicitation period and the stated period of performance, while keeping the same scope and requirements, site location, and on-site verification/visit provisions. As in the prior notice, proposals must include qualified technical representatives (with credentials), documentation of past performance as applicable, JCP registration, and other standard proposal information, and the contractor must coordinate access and inspections with the designated Coast Guard points of contact.

USCGC Polar Star Boiler inspection. POP: 16July-01Aug Please see Attached SOW for images General Requirements 1. SCOPE 1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed by commercial contractors for Coast Guard vessels. 2. REFERENCES COAST GUARD DRAWINGS None COAST GUARD PUBLICATIONS Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and Allied Processes Surface Forces Logistics Center Standard Specification 5550 (SFLC Std Spec 5550), 2022, Fire Prevention and Response OTHER REFERENCES None 3. REQUIREMENTS 3.1 General. The Contractor must conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability. The requirement of this WI applies to all work under the scope of this contract, whether explicitly stated in all following work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract. 3.2 Welding and brazing requirements. The Contractor must perform all welding and allied processes, and NDE in accordance with SFLC Std Spec 0740. 3.3 Fire Prevention Specification. The Contractor must submit a Fire Prevention Plan in accordance with paragraph 3.1 of SFLC Standard Spec 5550 3.4 Materials. The Contractor must obtain all the materials required to complete this job except for the Government-furnished Property shown in Paragraph 1.2 of Work Item 1, if any specified. 3.5 Period of Performance. The period of performance for this requirement starts on 16 July 2025 and ends on 1 August 2025. 3.6 Location. The Contractor must perform this work while the USCGC POLAR STAR is in drydock at Mare Island Drydock (MIDD) - 1180 Nimitz Ave, Vallejo, CA, 94592. Contractor must provide Certificate of Insurance and full name of contractors, subcontractors, and technical representatives to the designated USCG representative at least 24 hours prior to arriving on-site. Contractor does not require access to designated restricted and/or controlled access spaces on the ship in execution of this work. 3.7 Release of References. For any listed references to be distributed, the contractor must be registered in the Joint Certification Program (JCP) through Defense Logistics Agency (DLA) and provide your JCP number and expiration date to the listed point of contact (POC) for this work. 3.8 Solicitation Period Site-Visit. The Contractor can perform a ship check during the solicitation period of this requirement. The Contractor must contact the designated points of contact (POC) at least 48 hours prior to requested access for USCG to process. The POC for a site visit is listed in Paragraph 3.10. Access prior to award cannot be guaranteed and depends on the availability of the POCs and the Contractor providing request documentation needed for access. USCG is not responsible for any costs associated with the Contractor s site visit. 3.9 Documentation for Contractor s Proposal. The Contractor must include at least the following in their proposal for this requirement: basic information (name, company name, contact details, the date, Unique Entity ID), company overview, past performance (if applicable), technical representative certifications and qualifications, and signature of the authorized person. 3.10 Points of Contact. The USCG Technical POCs for this requirement include but are not limited to the following: 3.10.1 SFLC-LREPL Asset Manager, LT Mike Axelsson, Mikael.J.Axelsson@uscg.mil 3.10.2 SFLC-LREPL Engineer Officer, LT Joshua Herring, Joshua.C.Herring@uscg.mil ITEM 1: #2 Boiler, Open and Inspect 1. SCOPE 1.1 Intent. This work item describes the requirements for the Contractor to investigate a leak in the #2 boiler fire side casing, inspect the rest of the casing for leaks, ensure the pressure-containing components are intact, and provide repair suggestions. See Figure 1 for nameplate information of the boiler. 1.2 Government-furnished property. None. 2. REFERENCES Coast Guard Drawings Coast Guard Drawing 400 WAGB 103-003, Rev AM, Booklet of General Plans (POLAR STAR) Coast Guard Drawing 400 WAGB 5101-7, Rev 1, SDW 350M Marine Auxiliary Boiler Bare Boiler Design Arrangement Coast Guard Publications Coast Guard Technical Publication (TP) 2035, SWBS 517, Section A, Rev -, Auxiliary Boiler Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures Other References Code of Federal Regulations (CFR) Title 46, Part 61.05, 2025, Tests and Inspections of Boilers National Board of Boiler and Pressure Vessel Inspectors (NBBI), NBIC, 2023, National Board Inspection Code 3. REQUIREMENTS 3.1 General. 3.1.1 CIR. None. 3.1.2 Tech Rep. The Contractor must provide the following Technical Representatives. 3.1.2.1 Inspection Tech Rep. The Contractor must provide the services of a National Board of Boiler and Pressure Vessel Inspectors (NBBI) Commissioned Inspector or Pressure Equipment Inspect for Inservice boilers with an R endorsement to accomplish the following tasks on site: Inspect the boiler Inspect any repairs of the boiler 3.1.2.1.1 The Contractor must submit the name of the NBBI inspector and their current credential in their solicitation proposal for this work. 3.1.2.2 Refractory Tech Rep. The Contractor must provide the services of a Qualified Technical Representative who is familiar with boiler refractory and firebox construction to accomplish the following on site: Inspect refractory and other firebox components Recommend repairs 3.1.2.2.1 Ensure the Tech Rep has experience with the equipment stated above and demonstrated on their rsum. 3.1.2.2 Submit the name and rsum of the Tech Rep to the designated USCG representative in the solicitation proposal for this work. 3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection). 3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences) including, but not limited to the following: Insulation Sheathing 3.1.5. Residual Fluids. The Contractor must dispose of residual fluids in compliance with all applicable Federal, state, and local laws, ordinances, regulations and SFLC Standard Specification 0000. Notify the designated USCG representative (in writing) at least 5 days prior to removal of wastes and fluids. Document a complete chain of custody record of the removed contents and generated wastes, from the vessel to the point of destination or delivery. Submit document to the designated USCG representative upon completion of work. note Coast Guard personnel will operate all shipboard machinery and equipment 3.2 Boiler Pressure Testing 3.2.1 Test Plan. The Contractor must include a test plan that complies with the requirements of NBIC Part 2, Paragraph 4.3.1 in the proposal. Submit a CFR documenting any post-award changes to the hydrostatic test plan to the designated USCG representative for approval at least 2 business days prior to the proposed test date. The plan must address the following topics and be signed by all tech reps: Test pressure (Design Working Pressure is 150 PSI) Source and treatment of testing water Location and installation status of all blanks or valves that will hold pressure Air Removal Make, model and arrangement of pressurizing pump Date, time, and duration of hydrostatic test Data to be monitored and recorded during the testing 3.2.2 Execute the pressure test per plan in the presence of a Coast Guard Inspector. Submit a CFR documenting the results of the pressure testing and the associated data called out in the test plan. 3.2.3 The Inspection Tech Rep must be present for the hydro test. 3.2.4 Pressure test must not exceed the test design working pressure. 3.3 Fireside cleaning. The Contractor must disassemble the boiler sufficiently to allow complete access to the fireside for cleaning. The Contractor must mechanically clean the firesides of the boiler. Mechanically clean the surfaces of the tubes and the combustion chamber with a wire brush or other approved alternatives. Remove all debris. Vacuum and dispose of all soot in accordance with General Requirements. Figures 1 and 2 show the known damaged area 3.3.1 Prior to commencing mechanical cleaning, install containments to collect soot and airborne debris and conduct an initial inspection with a Coast Guard inspector to document existing condition. 3.3.2 Wire brush and clean the seating surfaces of all hand hole and manhole plates. 3.4 Inspection. Upon completion of cleaning and in the presence of a Coast Guard Inspector, the Contractor must visually inspect the fireside of the boiler with emphasis on the following items: Indications of broken refractory Soot deposits Pitting, cracking or corrosion on the water pipes. 3.4.1 The Contractor must reassemble the boiler to the as-found condition at the beginning of the contract accordance with all references in Section 2 of this work item. 3.4.1 Mud drum and steam drum gaskets must be renewed. 3.4.2 Disturbed insulation and sheathing must be renewed. 3.4.3 Submit a CFR detailing the damage and other issues found during the inspection, recommend corrective actions, and potential causes for these problems. 3.5 Touch-up preservation, general. The Contractor must prepare and coat all new and disturbed exterior and interior surfaces, as applicable, to match existing adjacent surfaces in accordance with SFLC Std Spec 6310, paragraph 3.1.13 (Touch-ups and minor coating repairs).

From Combined Synopsis/Solicitation posted on Jul 10, 2025

SOLICITATION EXTENDED UNTIL 17JULY 0800. UPDATED POP 21JUL-04AUG USCGC Polar Star Boiler inspection. POP: 21July-04Aug Please see Attached SOW for images General Requirements 1. SCOPE 1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed by commercial contractors for Coast Guard vessels. 2. REFERENCES COAST GUARD DRAWINGS None COAST GUARD PUBLICATIONS Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and Allied Processes Surface Forces Logistics Center Standard Specification 5550 (SFLC Std Spec 5550), 2022, Fire Prevention and Response OTHER REFERENCES None 3. REQUIREMENTS 3.1 General. The Contractor must conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability. The requirement of this WI applies to all work under the scope of this contract, whether explicitly stated in all following work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract. 3.2 Welding and brazing requirements. The Contractor must perform all welding and allied processes, and NDE in accordance with SFLC Std Spec 0740. 3.3 Fire Prevention Specification. The Contractor must submit a Fire Prevention Plan in accordance with paragraph 3.1 of SFLC Standard Spec 5550 3.4 Materials. The Contractor must obtain all the materials required to complete this job except for the Government-furnished Property shown in Paragraph 1.2 of Work Item 1, if any specified. 3.5 Period of Performance. The period of performance for this requirement starts on 16 July 2025 and ends on 1 August 2025. 3.6 Location. The Contractor must perform this work while the USCGC POLAR STAR is in drydock at Mare Island Drydock (MIDD) - 1180 Nimitz Ave, Vallejo, CA, 94592. Contractor must provide Certificate of Insurance and full name of contractors, subcontractors, and technical representatives to the designated USCG representative at least 24 hours prior to arriving on-site. Contractor does not require access to designated restricted and/or controlled access spaces on the ship in execution of this work. 3.7 Release of References. For any listed references to be distributed, the contractor must be registered in the Joint Certification Program (JCP) through Defense Logistics Agency (DLA) and provide your JCP number and expiration date to the listed point of contact (POC) for this work. 3.8 Solicitation Period Site-Visit. The Contractor can perform a ship check during the solicitation period of this requirement. The Contractor must contact the designated points of contact (POC) at least 48 hours prior to requested access for USCG to process. The POC for a site visit is listed in Paragraph 3.10. Access prior to award cannot be guaranteed and depends on the availability of the POCs and the Contractor providing request documentation needed for access. USCG is not responsible for any costs associated with the Contractor s site visit. 3.9 Documentation for Contractor s Proposal. The Contractor must include at least the following in their proposal for this requirement: basic information (name, company name, contact details, the date, Unique Entity ID), company overview, past performance (if applicable), technical representative certifications and qualifications, and signature of the authorized person. 3.10 Points of Contact. The USCG Technical POCs for this requirement include but are not limited to the following: 3.10.1 SFLC-LREPL Asset Manager, LT Mike Axelsson, Mikael.J.Axelsson@uscg.mil 3.10.2 SFLC-LREPL Engineer Officer, LT Joshua Herring, Joshua.C.Herring@uscg.mil ITEM 1: #2 Boiler, Open and Inspect 1. SCOPE 1.1 Intent. This work item describes the requirements for the Contractor to investigate a leak in the #2 boiler fire side casing, inspect the rest of the casing for leaks, ensure the pressure-containing components are intact, and provide repair suggestions. See Figure 1 for nameplate information of the boiler. 1.2 Government-furnished property. None. 2. REFERENCES Coast Guard Drawings Coast Guard Drawing 400 WAGB 103-003, Rev AM, Booklet of General Plans (POLAR STAR) Coast Guard Drawing 400 WAGB 5101-7, Rev 1, SDW 350M Marine Auxiliary Boiler Bare Boiler Design Arrangement Coast Guard Publications Coast Guard Technical Publication (TP) 2035, SWBS 517, Section A, Rev -, Auxiliary Boiler Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures Other References Code of Federal Regulations (CFR) Title 46, Part 61.05, 2025, Tests and Inspections of Boilers National Board of Boiler and Pressure Vessel Inspectors (NBBI), NBIC, 2023, National Board Inspection Code 3. REQUIREMENTS 3.1 General. 3.1.1 CIR. None. 3.1.2 Tech Rep. The Contractor must provide the following Technical Representatives. 3.1.2.1 Inspection Tech Rep. The Contractor must provide the services of a National Board of Boiler and Pressure Vessel Inspectors (NBBI) Commissioned Inspector or Pressure Equipment Inspect for Inservice boilers with an R endorsement to accomplish the following tasks on site: Inspect the boiler Inspect any repairs of the boiler 3.1.2.1.1 The Contractor must submit the name of the NBBI inspector and their current credential in their solicitation proposal for this work. 3.1.2.2 Refractory Tech Rep. The Contractor must provide the services of a Qualified Technical Representative who is familiar with boiler refractory and firebox construction to accomplish the following on site: Inspect refractory and other firebox components Recommend repairs 3.1.2.2.1 Ensure the Tech Rep has experience with the equipment stated above and demonstrated on their rsum. 3.1.2.2 Submit the name and rsum of the Tech Rep to the designated USCG representative in the solicitation proposal for this work. 3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection). 3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences) including, but not limited to the following: Insulation Sheathing 3.1.5. Residual Fluids. The Contractor must dispose of residual fluids in compliance with all applicable Federal, state, and local laws, ordinances, regulations and SFLC Standard Specification 0000. Notify the designated USCG representative (in writing) at least 5 days prior to removal of wastes and fluids. Document a complete chain of custody record of the removed contents and generated wastes, from the vessel to the point of destination or delivery. Submit document to the designated USCG representative upon completion of work. note Coast Guard personnel will operate all shipboard machinery and equipment 3.2 Boiler Pressure Testing 3.2.1 Test Plan. The Contractor must include a test plan that complies with the requirements of NBIC Part 2, Paragraph 4.3.1 in the proposal. Submit a CFR documenting any post-award changes to the hydrostatic test plan to the designated USCG representative for approval at least 2 business days prior to the proposed test date. The plan must address the following topics and be signed by all tech reps: Test pressure (Design Working Pressure is 150 PSI) Source and treatment of testing water Location and installation status of all blanks or valves that will hold pressure Air Removal Make, model and arrangement of pressurizing pump Date, time, and duration of hydrostatic test Data to be monitored and recorded during the testing 3.2.2 Execute the pressure test per plan in the presence of a Coast Guard Inspector. Submit a CFR documenting the results of the pressure testing and the associated data called out in the test plan. 3.2.3 The Inspection Tech Rep must be present for the hydro test. 3.2.4 Pressure test must not exceed the test design working pressure. 3.3 Fireside cleaning. The Contractor must disassemble the boiler sufficiently to allow complete access to the fireside for cleaning. The Contractor must mechanically clean the firesides of the boiler. Mechanically clean the surfaces of the tubes and the combustion chamber with a wire brush or other approved alternatives. Remove all debris. Vacuum and dispose of all soot in accordance with General Requirements. Figures 1 and 2 show the known damaged area 3.3.1 Prior to commencing mechanical cleaning, install containments to collect soot and airborne debris and conduct an initial inspection with a Coast Guard inspector to document existing condition. 3.3.2 Wire brush and clean the seating surfaces of all hand hole and manhole plates. 3.4 Inspection. Upon completion of cleaning and in the presence of a Coast Guard Inspector, the Contractor must visually inspect the fireside of the boiler with emphasis on the following items: Indications of broken refractory Soot deposits Pitting, cracking or corrosion on the water pipes. 3.4.1 The Contractor must reassemble the boiler to the as-found condition at the beginning of the contract accordance with all references in Section 2 of this work item. 3.4.1 Mud drum and steam drum gaskets must be renewed. 3.4.2 Disturbed insulation and sheathing must be renewed. 3.4.3 Submit a CFR detailing the damage and other issues found during the inspection, recommend corrective actions, and potential causes for these problems. 3.5 Touch-up preservation, general. The Contractor must prepare and coat all new and disturbed exterior and interior surfaces, as applicable, to match existing adjacent surfaces in accordance with SFLC Std Spec 6310, paragraph 3.1.13 (Touch-ups and minor coating repairs).

From Combined Synopsis/Solicitation posted on Jul 14, 2025

Notice history

2
  1. Combined Synopsis/Solicitation Posted Jul 10, 2025 View
  2. Combined Synopsis/Solicitation LATEST Posted Jul 14, 2025
    • Description: Description was updated
    • Response Deadline: Jul 14, 2025Jul 17, 2025

Details

Solicitation number 70Z08525Q0020189
Notice ID 1e6956c75808411d816b946cfd0e48e6
Notice type Combined Synopsis/Solicitation
Product / Service (PSC) J020
NAICS 336611
Place of performance Vallejo, California
Archive date Aug 01, 2025

Award Information

Not yet awarded

Documents

1
View on SAM.gov

Contacts

primary
Lindsay Mongiovi

Email

Phone

secondary
Tyler Melton

Email

Phone

Agency

HOMELAND SECURITY, DEPARTMENT OF
US COAST GUARD
SFLC PROCUREMENT BRANCH 2(00085)

Place of Performance

Vallejo, California 94592
USA

Dates

Posted Jul 14, 2025 1 year ago
Last Updated Aug 06, 2026 2 days ago
Due Jul 17, 2025 1 year ago