USCGC MUNRO GAS TURBINE BLEED AIR HOSE INSULATION 70Z8526Q025799
Summary
AI-generated · Jun 28, 2026Replace insulation covers on the Gas Turbine Bleed Air Hose (GTBA-HOSE-1) on USCGC MUNRO (WMSL 755). The Main Gas Turbine is non-operational, and replacing the insulation is critical to return the ship to Fully Mission Capable status as quickly as possible due to an oily-water exposure that caused smoking above 40°F. The contractor shall fabricate new removable insulation covers to the specified dimensions and construction: inner layer 34" x 22" x 2"; outer layer 45" x 28" x 2"; for 450°F and above, use layers of glass fiber felt; inside and ends wrapped with knitted wire mesh or fibrous glass cloth wire-inserted; outside covered with fibrous glass cloth; covers sewn and quilted for uniform thickness, strength, and rigidity. Fabrication shall comply with ASTM F683-99, Para 8, Page 8.
Period of performance is 01 JUL 2026 through 15 JUL 2026, with the primary place of performance at the contractor’s facility and delivery to USCG Base Alameda, CA after fabrication. The contractor shall furnish all materials, equipment, and services necessary. Reference documents CGDWG 750-WMSL-508-001 Rev C and CGDWG 750-WMSL-259_023 Rev C may be used for guidance.
Mofification 1 to this solicitation was to correct the POP in the attached SOW. Correct: period of performance for this contract shall be between 01JUL2026 & 15JUL26. STATEMENT OF WORK (SOW) FOR GAS TURBINE BLEED AIR HOSE INSULATION CGC MUNRO has a need to replace insulation covers on the Gas Turbine Bleed Air Hose. The ship s Main Gas Turbine is currently non-operational and has an immediate need for new insulation materials as outlined in this Statement of Work (SOW). 1.0 GENERAL Background USCGC MUNRO inadvertently soaked the insulation surrounding GTBA-HOSE-1 with an oily water. The hose is for the anti-icing bleed air system located underneath the Main Gas Turbine Module. Inundated insulation causes smoking when the Gas Turbine is operated in external temperatures above 40 degrees; preventing operation of the turbine. Scope The scope of this contract is defined by the efforts and tools required to support USCGC MUNRO (WMSL 755). The Contractor shall manufacture new removeable insulation covers to the dimensions and specs provided. OBJECTIVE The goal is to return CGC MUNRO to Fully Mission Capable (FMC) status. This is a critical need and shall be completed as soon as possible, in order to minimize negative operational impact to MUNRO s Operational Commander. APPLICABLE DOCUMENTS Reference Documents The following documents may be helpful to the Contractor in performing the work described in this document: Coast Guard Drawing (CGDWG) 750-WMSL-508-001, Rev C, JUNE 2009, Piping And Machinery Insulation Schedule And L/M (ASC508001) Coast Guard Drawing (CGDWG) 750-WMSL-259_023, Rev C, OCTOBER 2014, Bleed Air Piping & Joint Ident (P1 System) Unit 2210 SPECIFIC REQUIREMENTS/TASKS Existing insulation cover dimensions are as follows: Length Width Thickness Inner Layer 34 22 2 Outer Layer 45 28 2 Fabrication of reusable covers shall comply with ASTM F683-99, PARA 8, PAGE 8. For temperature 450 degrees Fahrenheit and over the covers shall be made up of layers of glass fiber felt to make up the required thickness. The inside and ends shall be wrapped with knitted wire mesh or fibrous glass cloth wire-inserted . The outside shall be covered with fibrous glass cloth. Covers shall be sewn and quilted with thread to provide a uniform thickness, strength and ridigity. 3.0 OTHER APPLICABLE CONDITIONS 3.1 Period of Performance - The period of performance for this contract shall be between 01JUL2026 & 15JUL26. 3.2 PLACE OF PERFORMANCE The primary place of performance will be at the contractor s facility. After completion, contractor will deliver to USCG Base Alameda, 1 Eagle Rd, Alameda CA 94501 4.0 CONTRACTOR FURNISHED PROPERTY The Contractor shall furnish all materials, equipment, and services necessary to fulfill the requirements of this contract. 5.0 Points of Contact USCG-SFLC-LREPL, Asset Manager: LTJG Justin Waters, 206-827-5766, justin.l.waters@uscg.mil 6.0 Imagery Outer Lagging Inner Lagging
From Special Notice posted on Jun 27, 2026Notice history
1-
Special Notice LATEST Posted Jun 27, 2026
Details
Award Information
Not yet awarded