USCGC James Rankin and USCGC Katherine Walker Valve 70Z08526Q0003304
Summary
AI-generated · Mar 13, 2026Provide two AMOT Temperature Control Valves, model G-valve, bronze, 3-way, size 6, for replacement during the upcoming drydock of CGC James Rankin and for dockside needs on CGC Katherine Walker, at their respective homeports.
Delivery must occur within 15 weeks of award, with tracking information supplied within 48 hours of each shipment. Deliveries are to CGC James Rankin in Baltimore, MD, and CGC Katherine Walker in Bayonne, NJ.
STATEMENT OF WORK U. S. COAST GUARD Temperature Control Valve (TCV) Replacement for CGC JAMES RANKIN and CGC KATHERINE WALKER SECTION 1- GENERAL INFORMATION 1.1 Purpose and Statement of Work 1.1.1 Provide 02 Temperature Control Valve, AMOT, model G-valve, bronze, 3-way, 6 size for the upcoming Drydock for CGC JAMES RANKIN at their homeport and Dockside for CGC KATHERINE WALKER at their homeport respectively. 1.2 Contact for questions Any questions regarding the Statement of Work must be directed at the Availability Project Manager, LTJG Kevin Y. Colon at 787-914-4827. Email at Kevin.Y.Colon@uscg.mil 1.3 Required Delivery Date and Address Required supplies shall be delivered to the address below within 15 weeks of notice of award and tracking info must be supplied within 48 hours of each individual supply being shipped. Below is the information for both cutters: CGC JAMES RANKIN 2401 Hawkins Point Rd, Baltimore, MD 21226 ATTN SCPO Ian Duthie, Cutter EPO, (716) 870-1023 / LTJG Thomas Kenny, Port Engineer, 914-844- 8845 CGC KATHERINE WALKER 85 Port Terminal Blvd Slip 1, Bayonne, NJ. 07002 ATTN SCPO Samuel G Brandenberger, Cutter EPO, (434) 221-9816 / LTJG Raphael Grieco, Port Engineer, (617) 480-8830
From Combined Synopsis/Solicitation posted on Mar 12, 2026Notice history
1-
Combined Synopsis/Solicitation LATEST Posted Mar 12, 2026
Details
Award Information
Not yet awarded
Contacts
Phone
Phone
Agency
Place of Performance
USA