USCGC Bertholf Turbine CPU and Install 70Z08526Q0003430
Summary
AI-generated · Feb 11, 2026Inspect and troubleshoot the Woodward MicroNet NT CPU (PN 5466-409) on USCGC Bertholf, with a new CPU replacement (PN 6466-1035) and upgrade to MicroNet Plus (PN 5466-1035), including uploading GAP software compatible with the new CPU. Provide all technical and proprietary data needed to complete the repair, and deliver the upgraded CPU to the cutter for the MicroNet Plus upgrade.
Two site visits by a Field Service Engineer are required, with up to four ten-hour travel days and four ten-hour on-site days per visit. Deliver the new CPU, perform the upgrade, and provide a field report within five working days after each visit. Estimated lead time for parts is about six weeks. The first site visit is planned for Puerto Rico, with the second visit to be determined when the part is available. Coordinate with the designated Point of Contact.
THIS HAS BEEN AWARD VIA JOTFOC THIS IS FOR INFORMATIONAL PURPOSES ONLY. TECHNICAL SERVICES TO REPAIR WOODWARD MicroNet NT CPU (PN 5466-409) Background. CGC BERTHOLF is usable to start the Main Gas Turbine. While steaming at HP7 on the GT, a Micronet System Faulty (PV131047) alarm appeared on MCS-5 as well as a Hardware Chassis A Fan Fault on the GT Woodward panel. GT operation was not hindered. After securing the GT, MCMS alarmed with a GT Engine Control System (ECS) hardware fault prohibiting water wash from being completed. SF installed three new fans above the Micronet CPU and I/O cards and conducted a reset of the system IAW Woodward Operating Instructions from B91358OI.C with positive results. Again, while steaming in GT mode at HP5 the same sequence of alarms populated. After performing a CPU reset the ECS hardware fault did not clear and the GT is currently unable to start or motor. SF identified ECS alarm code to be "TRBL 20" in TP B91358OI.C, but no further troubleshooting steps are annotated in the manual. Request Woodward tech for CPU inspection and troubleshooting. Scope. 1 FS Engineer for two (4) ten (10) hour travel days and two (4) ten (10) hour days on two separate site visits for following: MicroNet NT CPU (PN 5466-409) inspection and troubleshooting. Provide new CPU 6466-1035. Perform CPU upgrade to Micro Net Plus CPU 5466-1035. This would include uploading new GAP software compatible with new CPU. Tasks. The contractor shall: Provide all technical and all proprietary data to troubleshoot and repair the CPU (PN 5466-409). Provide new CPU 6466-1035. Delivered to the address below (Estimated lead time of 6 weeks). Upgrade to Micro Net Plus on cutter. Provide field report within 5 working days of visits. Delivery. Deliver Parts to: USCGC BERTHOLF ATTN: SFLC LRE AMS 1 Eagle RD Alameda CA 94501 Place of performance- 1St Visit: 5 Calle la Puntilla, San Juan, PR, 00901 2nd Visit: TBD when part is on hand. Coordinate with POC listed. Period of performance- 1ST Visit: 21FEB2026- 22FEB2026 2nd Visit: TBD Points of Contact. USCG-SFLC-LRE PL Asset Management: CWO Matthew Temple, matthew.temple@uscg.mil, (510) 460-8195 USCG-SFLC-LRE PL Asset Management: MKCM Armando Parez, Armando.Perez@uscg.mil, (571) 607-1558
From Combined Synopsis/Solicitation posted on Feb 10, 2026Notice history
1Details
Award Information
Not yet awarded
Contacts
Phone
Phone
Agency
Place of Performance
USA