USCG BASE GALVESTON SECURITY FENCE 70Z02925QNEWO0036
Summary
AI-generated · Aug 25, 2025Provide all labor, materials, and equipment to install security fencing between the existing property line and the break-wall at USCG Base Galveston, in accordance with the Performance Work Statement and the SOW. The award will be firm-fixed price to the lowest price technically acceptable bidder, with a 100% small-business set-aside. Contractors must be SAM.gov-registered and provide the representations required by FAR 52.236-1; when submitting the schedule of costs, indicate which portions of contract work will be performed by the contractor’s own forces (costs for materials/equipment installed by that labor may be included; executive/administrative/clerical labor is excluded). Attachments contain additional detail.
A site visit is strongly encouraged to inspect conditions and inform costs; arrange to visit the site per the solicitation’s FAR 52.237-1 guidance. Bidders should review the PWS beforehand and may use the site measurements and assessments to satisfy requirements. Quotes must be prepared and submitted in accordance with the solicitation instructions, including the cost-schedule requirements and the designation of work to be performed by the contractor’s own forces, as described in the attachments.
The United States Coast Guard is accepting quotes for qualified individuals or firms to Provide all labor, materials, and equipment necessary to install security fencing between existing property line and the break-wall. Prior to submitting a quote, it is mandatory to examine the Performance Work Statement (PWS), and it is highly recommended to visit the facility to take field measurements, evaluations, etc., and become familiar with existing conditions under which the work will be performed. All work is to be completed in accordance with the SOW. This will be a firm-fixed priced purchase order awarded to the lowest reasonable price technically acceptable bidder. This is a set aside 100% for small business. All contractors must be actively registered in SAM.gov and must provide representations prescribed in clause 52.236-1 in Section III of the attached contract format document to be considered. Far clause 52.236-1 Performance of Work by the Contractor applies to the solicitation and award. The Contractor shall submit, simultaneously with the schedule of costs required by the Payments under Fixed-Price Construction Contracts clause of the contract, a statement designating the portions of contract work to be performed with the Contractor's own forces. The approved schedule of costs will be used in determining the value of a work activity/event, or portions thereof, of the work for the purpose of this article. See Attachment B for more detail. In establishing the percent of work to be performed by the Contractor. Cost of material and equipment installed by such labor may be included. The work by the Contractor's executive, administrative and clerical forces shall be excluded in establishing compliance with the requirements of this clause. FAR 52.237-1 -- Site Visit (Apr 1984). Offerors or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award. Arrangements for visiting the site may be made by contacting: Mr. Timothy Florez Adams: (409) 766-4856 / (832) 221-9278 Submit quotes to: melissa.n.navarro@uscg.mil NAICS:236220- Commercial and Institutional Building Construction industry PSC: 5660 - Fencing, Fences, Gates and Components 36.204 Disclosure of the magnitude of construction projects. Under $25,000
From Combined Synopsis/Solicitation posted on Aug 11, 2025Notice history
1-
Combined Synopsis/Solicitation LATEST Posted Aug 11, 2025
Details
Award Information
Not yet awarded
Contacts
Phone
Phone
Agency
Place of Performance
USA