Contacts, documents and full notice history are available with a subscription.
Combined Synopsis/Solicitation SDVOSBC Expired 1 notice 3 documents

USAG Ranges & Airfields Grounds Maintenance W91247-26-Q-A015

Solicitation W91247-26-Q-A015 Copied Notice ID bd0ff4b9b082413f8264f6c636c92fda Copied DEPT OF DEFENSE — W6QM MICC FDO FT BRAGG
SAM.gov
Posted
Apr 29, 2026
Deadline
May 18, 2026
Set-aside
SDVOSBC
NAICS
561730
PSC
S208

Summary

AI-generated · Apr 30, 2026

Provide comprehensive grounds and airfield maintenance services across approximately 3,207 acres at Fort Bragg Pope Army Airfield, Simmons Army Airfield, and Camp Mackall. Install a complete package of non-personal services including all labor, supervision, equipment, and supplies for recurring mowing, vegetation control, and general groundskeeping, organized into two areas: Airfield Maintenance and Training Area & Range Maintenance.

Airfield Maintenance covers all designated airfield surfaces (runways, taxiways, infields) to support Bird/Wildlife Aircraft Strike Hazard (BASH) mitigation and safe aviation operations. Training Area & Range Maintenance covers training ranges, impact areas, and related facilities to keep them safe, accessible, and suitable for troop training. Grass height standards specify 6–12 inches for airfields and not to exceed 6 inches for ranges and training areas to ensure visibility, reduce fire hazards, and facilitate safe, effective training.

This is a requirement for non-personal services to provide comprehensive grounds and airfield maintenance. The contractor shall furnish all labor, supervision, equipment, and supplies necessary to ensure the safe and continuous operation of mission-critical infrastructure. The core requirement is for recurring grass cutting, vegetation control, and groundskeeping services across approximately 3,207 acres. The scope is divided into two primary functional areas with distinct performance standards: Airfield Maintenance: The contractor is responsible for maintaining all designated airfield areas, including runways, taxiways, and infields. This is vital for mitigating the Bird/Wildlife Aircraft Strike Hazard (BASH) and ensuring safe aviation operations. Training Area & Range Maintenance: The contractor will maintain all specified training ranges, impact areas, and support facilities to ensure they are safe, accessible, and suitable for troop training and maneuvers. Locations: The services will be performed across the following (TE 7.1 of PWS): Fort Bragg Pope Army Airfield (AAF) Simmons Army Airfield (AAF) Camp Mackall Key Performance Objectives: The purpose of this service is to support installation safety and mission readiness by meeting the following critical standards: Airfields: Maintain grass height strictly between 6 and 12 inches to prevent wildlife nesting and foraging, directly supporting the BASH program and protecting aviation assets. Ranges & Training Areas: Maintain grass height not to exceed 6 inches to ensure clear lines of sight, reduce fire hazards, and facilitate safe and effective training exercises.

From Combined Synopsis/Solicitation posted on Apr 29, 2026

Notice history

1
  1. Combined Synopsis/Solicitation LATEST Posted Apr 29, 2026

Details

Solicitation number W91247-26-Q-A015
Notice ID bd0ff4b9b082413f8264f6c636c92fda
Notice type Combined Synopsis/Solicitation
Product / Service (PSC) S208
NAICS 561730
Place of performance Fort Bragg, North Carolina
Archive date Jun 02, 2026

Award Information

Not yet awarded

Contacts

primary
Darius T. Moore

Email

secondary
Casey Cambrin

Email

Agency

DEPT OF DEFENSE
DEPT OF THE ARMY
AMC
ACC
MISSION INSTALLATION CONTRACTING COMMAND
419TH CSB
W6QM MICC FDO FT BRAGG

Place of Performance

Fort Bragg, North Carolina 28310
USA

Dates

Posted Apr 29, 2026 3 months ago
Last Updated Aug 06, 2026 2 days ago
Due May 18, 2026 2 months ago