Contacts, documents and full notice history are available with a subscription.
Sources Sought NONE Expired 1 notice 1 document

USAFA Chemical Fume Hood Maintenance, Repair, Testing, and Balance Certification Services FA700025Q0118

Solicitation FA700025Q0118 Copied Notice ID 25ffd9d57ccd49a8844084600eeb391e Copied DEPT OF DEFENSE — FA7000 10 CONS LGC
SAM.gov
Posted
Jul 31, 2025
Deadline
Aug 08, 2025
Set-aside
NONE
NAICS
541380
PSC
J066

Summary

AI-generated · Aug 24, 2025

Maintenance, repair, testing, and balance certification services for 11 SafeAir by Fischer Hamilton chemical fume hoods at the United States Air Force Academy (Dean of Faculty Chemistry Department). The contractor shall furnish all labor, materials, freight/transportation, equipment, and supervision to bring the hoods into compliance and to pass the required airflow balance certification, and must ensure the work site is clean prior to Government acceptance. A 3-hour site visit may be conducted during the solicitation for contractors to evaluate each hood and gather data needed to prepare accurate quotes.

Hoods include 3 units of model 54L815E (38.25 x 18), 7 units of model 54L821E (62.5 x 18.25), and 1 unit of model 54L824E (86.25 x 18), totaling 11. Balancing must meet the airflow velocity certification per the ACGIH General Use Laboratory Hoods for Industrial Ventilation Manual, 25th Edition (Para. 10.35, Laboratory Ventilation, Fig. VS-35-01) at 80–100 CFM per ft^2. The contract is firm-fixed price, with performance at USAFA, CO.

See attachments for complete explanation of the proposed requirement. The proposed requirement s purpose is to provide maintenance, repair, testing, and balance certification services on 11 chemical fume hoods for the United States Air Force Academy (USAFA) Dean of Faculty Chemistry Department (DFCH). The contractor shall supply all labor, materials, freight/transportation, equipment, and supervision to provide maintenance, repair, testing, and balance certification for the 11 chemical fume hoods in accordance with the guidance below. The contractor is responsible for ensuring the chemical fume hoods are brought up to standard in order to pass the certification standard referenced below. The contractor shall ensure the work site is clean prior to acceptance of completed work by the Government. The Government may host a 3-hour site visit during the solicitation, for contractors to evaluate each of the chemical fume hoods and gather any necessary data required to provide accurate quotes. Chemical Fume Hood Salient Characteristics: Chemical Fume Hood Brand: SafeAir by Fischer Hamilton Model numbers Dimensions Quantity 54L815E Dimensions 38.25 x 18 Quantity 3 Fume Hoods 54L821E Dimensions 62.5 x 18.25 Quantity 7 Fume Hoods 54L824E Dimensions 86.25 x 18 Quantity 1 Fume Hood Total Quantity 11 Chemical Fume Hood Balancing Requirement: Each Fume Hood must pass the airflow velocity balance certification in accordance with ACGIH General use Laboratory Hoods for Industrial Ventilation Manual, 25th Edition, Para. 10.35 Laboratory Ventilation pg. 10-42, Figure VS-35-01. 80 100 CFM/ft^2 The contract type will be a firm-fixed price contract. Place of Performance: USAF Academy, CO 80840.

From Sources Sought posted on Jul 31, 2025

Notice history

1
  1. Sources Sought LATEST Posted Jul 31, 2025

Details

Solicitation number FA700025Q0118
Notice ID 25ffd9d57ccd49a8844084600eeb391e
Notice type Sources Sought
Product / Service (PSC) J066
NAICS 541380
Set-aside No Set aside used
Place of performance USAF Academy, Colorado
Archive date Aug 23, 2025

Award Information

Not yet awarded

Documents

1
View on SAM.gov

Contacts

primary
Mikayla Brandt

Email

Phone

secondary
Kenneth Helgeson

Email

Phone

Agency

DEPT OF DEFENSE
DEPT OF THE AIR FORCE
U
S
AIR FORCE ACADEMY
FA7000 10 CONS LGC

Place of Performance

USAF Academy, Colorado 80840
USA

Dates

Posted Jul 31, 2025 1 year ago
Last Updated Aug 06, 2026 1 day ago
Due Aug 08, 2025 11 months ago