US Embassy DILI - Electrical Panel and Subpanel Replacement - Supply and Delivery PR15335022
Summary
AI-generated · Aug 24, 2025Supply and deliver a new electrical distribution panel and subpanel to meet current safety standards and accommodate the facility’s electrical load at the U.S. Embassy Dili, Timor-Leste. This is a firm fixed-price contract for professional services and contractor cost proposals. Proposals must include a parts list detailing all equipment required for full functionality and installation, and the entire scope of work must be completed within 365 days after the Notice to Proceed.
Notice has been extended: the contract opportunity is extended until 08/19/2025 at 5:00 p.m. Dili time.
The U.S. Department of State requires professional services and contractor cost proposals to Supply and Deliver a new electrical distribution panel and subpanel. The purpose of this project is to ensure the electrical system meets current safety standards and can handle the electrical load requirements of the facility. This main distribution panel and subpanel are located at U.S. Embassy Dili in Dili, Timor-Leste. This is a firm fixed price contract. All proposal packages must be accompanied by a parts list for the full functionality of all equipment and installation requirements. All scope of work must be completed no later than 365 days after issuance of letter of Notice to Proceed.
From Solicitation posted on Jul 31, 2025The U.S. Department of State requires professional services and contractor cost proposals to Supply and Deliver a new electrical distribution panel and subpanel. The purpose of this project is to ensure the electrical system meets current safety standards and can handle the electrical load requirements of the facility. This main distribution panel and subpanel are located at U.S. Embassy Dili in Dili, Timor-Leste. This is a firm fixed price contract. All proposal packages must be accompanied by a parts list for the full functionality of all equipment and installation requirements. All scope of work must be completed no later than 365 days after issuance of letter of Notice to Proceed. Notice: this contract opportunity has been extended until 08/19/2025 @ 5pm Dili time.
From Solicitation posted on Aug 14, 2025Notice history
2-
-
Solicitation LATEST Posted Aug 14, 2025View changes (2)
- Description: Description was updated
- Response Deadline: Aug 14, 2025 → Aug 19, 2025
Details
Award Information
Not yet awarded
Contacts
Agency
Place of Performance
TLS