US Embassy Brazzaville Chancery Cooling System Test and Balance 19CF2025Q0019
Summary
AI-generated · Aug 28, 2025Perform a comprehensive Test and Balance (TAB) of the cooling system, focusing on the air handling units (AHUs) that serve the chancery building at the U.S. Embassy in Brazzaville. The work centers on evaluating and optimizing the AHU performance to meet the chancery’s cooling design requirements.
The US Embassy in Brazzaville requires services of the contractor to perform a comprehensive Test and Balance (TAB) for the cooling system, specifically the air handling units (AHUs) serving the chancery building.
From Combined Synopsis/Solicitation posted on Aug 27, 2025The US Embassy in Brazzaville requires services of the contractor to perform a comprehensive Test and Balance (TAB) for the cooling system, specifically the air handling units (AHUs) serving the chancery building. Below are additional specifications with regards to the system Number of Fan Coil Units: 4 Number of Balancing Dampers (Air) : 80 Number of Balancing Valves : 6 Number of Chillers : 3 Number of Primary Pumps : 2 Number of Secondary Pumps : 2 Number of Air Handling Units : 6 Number of Fire Dampers : 5 Composition of Chilled water system - 3 Air-cooled chillers - One chiller of the three is equipped with heat exchanger and glycol - One supply line to the building - One return line from the building. - One bypass line with a with bypass valve. - Chilled water flow SP= 6 liters per second. The total number of dampers in the air distribution network : 80 Provision of images, schematics, or requirement specification documents
From Combined Synopsis/Solicitation posted on Sep 12, 2025Notice history
2-
-
Combined Synopsis/Solicitation LATEST Posted Sep 12, 2025View changes (2)
- Description: Description was updated
- Response Deadline: Sep 12, 2025 → Sep 15, 2025
Details
Award Information
Not yet awarded
Contacts
Phone
Phone
Agency
Place of Performance
COG